Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
26 results
Project
Ephrata East City Limits B NW - Roundabout
Timeline: August 2025-September 2028
This intersection has been identified by the I2 Safety Subprogram as one that should be targeted in order to reduce the frequency and intensity of vehicular collisions. This project triggered a Complete Streets analysis to incorporate pedestrian facilities into the preferred alternative and design.
Project
I-5/Guide Meridian I/C and SR 539/I-5 to Kellogg Road - Paving & ADA
Timeline: Spring 2024 - Fall 2028
This project will resurface the northbound and southbound lanes of State Route 539 from Interstate 5 to Kellogg Road in Bellingham to extend the pavement service life. Crews working for WSDOT will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping…
Project
I-90 Judkins Park Station – Reconnecting Communities
Timeline: 2023-2027
The Interstate 90 Judkins Park Station – Reconnecting Communities study will identify and recommend changes to the five WSDOT I-90 ramps at Rainier Avenue South to improve safe travel for all modes and increase access to the Judkins Park Link light rail station via transit transfer, walking,…
Project
Pateros-to-Brewster Seal and Complete Streets
Timeline: Spring 2025-Summer 2027
This project will resurface the deteriorating chip seal pavement (due to rutting, cracking and normal wear) with a chip seal overlay. This will extend the service life of the existing pavement.
The project will also develop a Complete Streets analysis for design including providing non-…
The project will also develop a Complete Streets analysis for design including providing non-…
Project
SR 129 Highland Ave to US 12 and SR 129 Spur – ADA Compliance: Complete Streets
Timeline: Project Postponed
This project evaluates upgrades under the Americans with Disabilities Act (ADA) and Complete Streets initiatives to create a more accessible, comfortable, economical, sustainable, and efficient transportation system along SR 129. However, due to limited preservation funding and the need for…
Project
SR 155 Omak Area Paving and Complete Streets
Timeline: Fall 2023 - Fall 2027
This project will construct a shared-use path along State Route 155 Spur/Omak Avenue (milepost 79.31 to 79.91) to provide a designated route for pedestrians and bicyclists to the East Omak Elementary School and across the nearby railroad tracks. Traffic calming features such as speed feedback signs…
Project
SR 202 Boalch Ave NW to I-90 & Overflow Channel Bridge - ADA Compliance
Timeline: 2026-2028
This project will resurface the northbound and southbound lanes of State Route 202 from Boalch Ave Northwest to I-90 to extend the pavement service life. The SR 202 bridges over the overflow channel and South Fork of the Snoqualmie River have decks that are deteriorating and are nearing the end of…
Project
SR 21 – SR 20 to Canada – Chip Seal & Complete Streets
Timeline: Fall 2025 - Summer 2027
SR 21 from SR 20 to the US-Canada Border – milepost 162.5 to 191.5 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found the two projects that will deliver…
Project
SR 28 and SR 21 - Town of Odessa - Paving and Complete Streets
Timeline: Spring 2025 - Summer 2027
This project will rehabilitate the asphalt for both SR 21 and SR 28 within the town limits of Odessa in Lincoln County to preserve the roadway structure and the public investment in highways. Along with repaving the roadway, the Complete Streets screening process found this project is subject to…
Project
SR 507 – Skookumchuck River Bridge to Thurston County Line – Paving and Complete Streets Pre-Design
Timeline: January 2025- June 2026
State Route 507 (SR 507) between the Skookumchuck River Bridge and the Thurston County line within Centralia and unincorporated Lewis County is in need of pavement preservation work to protect the public’s investment in the highway. This work is necessary to keep the roadway in good condition and…
Project
SR 516/SR 181 to 104th SE Ave Vic Paving & ADA
Timeline: 2026-2028
This project will rehabilitate the existing pavement and preserve the roadway surface and bring curb ramps that are impacted by resurfacing work up to meet current ADA accessibility criteria.
Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, striping…
Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, striping…
Project
SR 522 - Paradise Lake Rd to Snohomish River Br - Interchange & Widening
Timeline: 2017 - 2027
SR 522 in Snohomish County is an increasingly important east-west route connecting communities between Woodinville and Monroe. One section between Paradise Lake Road in Maltby and the Snohomish River remains one-lane in each direction. We plan to widen the highway to two lanes in each direction,…
Project
SR 525 Mukilteo Bridge Over Railroad – Bridge Replacement
Timeline: 2024 - 2030
This project will replace the State Route 525 bridge overcrossing the BNSF railroad in the city of Mukilteo. The new bridge will include active transportation improvements to improve safety for all travelers and increase connectivity between Old Town Mukilteo and the waterfront, including the new…
Project
SR 525 Spur Vic to Mukilteo Ferry Vic – Paving and ADA
Timeline: 2026 - 2027
This project will repave, with Hot Mix Asphalt (HMA), and construct Americans with Disability Act (ADA) upgrades on State Route 525 from the SR 525 Spur, just north of Harbour Place, to 2nd Street. This project is subject to WSDOT’s Complete Streets requirements. Additionally, the paving project…
Project
SR 532/Stillaguamish River to 72nd Ave NW Vic-Paving & ADA
Timeline: Summer 2026 – Fall 2028
This project will pave 2.5 miles of northbound and southbound State Route 532 from 270th Street SW (milepost 3.4) to just east of 72nd Avenue NW (milepost 6.0). Crews working for WSDOT will rehabilitate the existing roadway surface and update the roadway striping. Additionally, pedestrian curb…
Project
SR 532/Sunrise Blvd Vic to Davis Slough Bridge Vic - Paving & ADA
Timeline: Spring 2026 – Fall 2028
This project will pave 2.6 miles of northbound and southbound State Route 532 from North Sunrise Blvd. (milepost 0.0) to just east of Smith Road (milepost 2.6). Crews working for WSDOT will rehabilitate the existing roadway surface and update the roadway striping. Additionally, pedestrian curb…
Project
SR 539 - Bay Lyn Dr to SR 546 - Paving & ADA
Timeline: Spring 2026 – Fall 2028
This project will pave two miles of northbound and southbound State Route 539 from SR 546 (milepost 12.55) to Bay Lyn Drive (milepost 10.40). Crews working for WSDOT will rehabilitate the existing roadway surface and update the roadway striping. Additionally, pedestrian curb ramps will be evaluated…
Project
SR 542 Glacier Creek Bridge Replacement
Timeline: Spring 2025 to 2029
This project will replace the State Route 542 bridge over Glacier Creek in Whatcom County, in the Community of Glacier. The new bridge will connect to the existing Gallop Creek Bridge, and together, these new structures will reduce flood risk, restore salmon habitat, and improve safety for all…
Project
SR 546 - SR 539 to Fishtrap Creek - Paving With Exceptions
Timeline: Spring 2026 - Fall 2028
This project will pave over two miles of eastbound and westbound State Route 546 from SR 539 (milepost 0.03) to Vinup Road (milepost 2.45), excluding previous fish passage areas at Depot Road (milepost 1.47) and Bender Road (milepost 2.01). Crews working for WSDOT will rehabilitate the existing…
Project
SR 99 – 238th St SW to 148th St SW Vic - Paving & ADA Compliance
Timeline: 2026-2029
This project will resurface the northbound and southbound lanes of State Route 99 from 238th Street Southwest to 148th Street Southwest to extend the pavement service life. Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping and traffic…
Project
SR 99/S 272nd St to SR 516 Vic - Paving & ADA Compliance project
Timeline: 2024-2027
This project will resurface the northbound and southbound lanes of State Route 99 from South 272nd Street to SR 516 to extend the pavement service life. Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping and traffic control. Pedestrian…
Project
US 195 – Colfax North Fork Palouse River – Replace Bridges
Timeline: Summer 2029 - Summer 2031
The Washington State Department of Transportation (WSDOT) is in the early design phase of replacing the two bridges that cross the North Fork of the Palouse River, with a new single bridge structure, as they have reached the end of their expected service life.
Project
US 2 and SR 21 - Wilbur – Paving & Complete Streets
Timeline: Spring 2025 - Summer 2027
This project will rehabilitate the asphalt for both US 2 and SR 21 within the town limits of Wilbur in Lincoln County to preserve the roadway structure and the public investment in highways. Along with repaving the roadway, the Complete Streets screening process found this project is subject to…
Project
US 395 – Boyds to Canada – Chip Seal & Complete Streets
Timeline: Summer 2027
US 395 from Boyds to the US-Canada Border – milepost 248 to 270 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project is subject to WSDOT’s…
Project
US 395 – Division Wye to Wandermere – Paving – Complete Streets
Timeline: Spring 2023 - Summer 2028
US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required…
Project
US 395 – Hafer Road to Chewelah – Paving & Complete Streets
Timeline: July 2025 - October 2026
This project rehabilitates roughly five miles of US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, Stevens County. This project includes removing the current roadway surface which has reached the end of its usable life and repaving it with Hot Mix Asphalt (HMA).
…
…
Slow down – lives are on the line.
Drive the posted speeds, they’re there for your safety.
Phone down, eyes up.
Pay attention – both to workers directing you and to surrounding traffic.
Stay calm
Expect delays, leave early or take an alternate route if possible; no appointment is worth risking someone’s life.