Project overview
The driving surface along a 4 mile stretch of southbound Interstate 5 between Northeast 179th Street and Pioneer Street in Ridgefield is bumpy, uneven and in need of repair.
In summer 2027, contractor crews will rebuild the roadway using a crack, seat and overlay method. The existing concrete pavement will be broken into smaller pieces to create a stable base before 9 inches of new asphalt are placed across all lanes and shoulders.
When the project is complete, travelers will have a smoother, safer and more reliable drive along this section of I-5.
What to expect
Travelers should expect nighttime lane closures and intermittent ramp closures along southbound I-5 near Exit 9 (Northeast 179th Street), Exit 11 (Battle Ground/SR 502) and Exit 14 (Pioneer Street). Most work will take place overnight to reduce daytime traffic impacts. Drivers should plan for delays, slow down in work zones and follow posted signs.
Project area is shown by the orange line, extending from Northeast Pioneer Street in Ridgefield to Northeast 179th Street near the Clark County Fairgrounds.
Built in 1969, this section of southbound I-5 between Northeast 179th Street and Pioneer Street was constructed with concrete pavement panels. This stretch of roadway includes about 8,400 concrete panels, many of which are 50 to 70 years old and reaching the end of their service life. Over time, heavy traffic, weather and age have caused some panels to crack, shift and become uneven, creating a rougher ride for travelers. About 65,000 vehicles travel along I-5 each day between the Columbia River and south of Woodland in Clark County.
Recent improvements
2022–2024: Concrete panel replacement
Crews replaced approximately 180 of the most damaged concrete panels along southbound I-5 between Northeast 179th Street and the I-5/I-205 split. This work prepared the roadway for future pavement improvements but did not fully address the rough driving conditions. To help warn travelers about the uneven surface, crews installed “Rough Road” and speed advisory signs.
Summer 2026: Crack, seat and overlay project
Crews rebuilt 2.2 miles of southbound I-5 between Northeast 179th Street and the I-5/I-205 split using the crack, seat and overlay method. The process breaks the existing concrete pavement into a stable base before crews add new asphalt on top to create a smoother, more durable roadway.
Fall 2026: Additional concrete panel replacement
Crews will replace the most damaged concrete panels along 4 miles of southbound I-5 between Pioneer Street and Northeast 179th Street. These repairs will address the roughest areas and prepare the roadway for the next phase of improvements.
Looking ahead
In summer 2027, crews will return to rebuild approximately 4 miles of southbound I-5 using the same crack, seat and overlay method. This long-term pavement improvement will create a smoother, more durable driving surface for travelers.
Environmental justice assessment
An environmental justice assessment (EJA) will be completed for this project. These assessments are conducted for any significant agency action that could harm the environment or impact how environmental benefits are distributed to overburdened communities (OBCs) or vulnerable populations (VPs). An EJA guides decision-making to ensure fair distribution of environmental benefits, reduce environmental harms, and address disparities in both environmental and health outcomes. Meaningful engagement with affected communities is a crucial aspect of this process.
Washington State’s HEAL Act
This project is subject to HEAL Act (Healthy Environment for All Act), a law in Washington state that requires agencies to design a collaborative approach to ensure projects proportionately benefit the community as a whole. The HEAL Act addresses environmental benefits and community health impacts by requiring all laws, rules and policies to prioritize community members who are most impacted by projects, ensure even distribution of resources and benefits, and eliminate harm (RCW 70A.02.010).
This project will conduct an environmental justice assessment to identify the benefits and burdens for all community members, including populations who have been disproportionately impacted by past projects. These assessments are conducted for any significant agency action to prevent disproportionate environmental and community impacts and to ensure that environmental benefits are distributed evenly, particularly to those in highly impacted communities.