Bid results archive

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Bid results archive 3/2022 - 2/2023

Search by bid opening date:

February: 2/1 | 2/15 | 2/23
January: 1/11 | 1/19 | 1/25
December: 12/7 | 12/14 | 12/21
November: 11/2 | 11/9 | 11/16 | 11/30
October: 10/12 | 10/19 | 10/26
September: 9/8 | 9/14 | 9/21 | 9/28
August: 8/3 | 8/31
July: 7/7 | 7/13 | 7/20  | 7/27
June: 6/2 | 6/8 | 6/15 | 6/23 | 6/29
May: 5/4 | 5/11 | 5/18 | 5/25
April: 4/6 | 4/13 | 4/20 | 4/27
March: 3/2 | 3/9 | 3/16 | 3/23 | 3/3

Past bid opening results are available online for one year after bid opening.
Please note: a public records request is required to disseminate any information not listed here.

2/23/2023 bid opening - Olympia, WA

Item no. 1: SR 525, Clinton Ferry Terminal Paving Preservation

Contract number: 009939
Engineer's estimate: $638,000.00
Number of addenda: 0
Number of bidders: 3/3
Award status: pending

Preliminary bid total results

Apparent low: Lakeside Industries, Inc. - $959,695.00 - rejected 3/15/2023
Apparent second: Combined Construction, Inc. - $1,071,967.00 - rejected 3/15/2023
Apparent third: Granite Construction Company - $1,327,030.00

Verified bid total results

Low bidder: Lakeside Industries, Inc. - rejected 3/15/2023
Bid amount: $959,695.00

Small business enterprise (SBE)

  1. Reece Construction, Co. - sub - $34,000.00
    Description of work: planing bituminous pavement
  2. Reece Construction, Co. - sub - $14,500.00
    Description of work: street sweeping (partial)

SBE goal: $47,984.75
SBE total: $48,500.00

Veteran-owned business (VOB)

  1. Dungeness Construction - sub - $20,400.00
    Description of work: excavation, earthwork & grading

VOB goal: $19,193.90
VOB total: $20,400.00

Second bidder: Combined Construction, Inc. - rejected 3/15/2023
Bid amount: $1,071,967.00

Small business enterprise (SBE)

  1. Dungeness Construction - sub - $20,008.00
    Description of work: partial - planing/removal
  2. Reece Construction, Co. - sub - $34,120.00 
    Description of work: partial - planing/removal

SBE goal: $53,598.35
SBE total: $54,128.00

Veteran-owned business (VOB)

  1. Dungeness Construction - sub - $1,650.00
    Description of work: inlet protection
  2. Dungeness Contruction - sub - $19,800.00
    Description of work: excavator and crew

VOB goal: $21,439.34
VOB total: $21,450.00

Third bidder: Granite Construction Company
Bid amount: $1,327,030.00

Small business enterprise (SBE)

  1. C Johnson Construction - sub - $55,000.00
    Description of work: earthwork & dump trucking
  2. Hughes Group LLC - sub - $13,000.00
    Description of work: traffic control

SBE goal: $66,351.50
SBE total: $68,000.00

Veteran-owned business (VOB)

  1. Hughes Group LLC - sub - $27,000.00
    Description of work: traffic control

VOB goal: $26,540.60
VOB total: $27,000.00

Item no. 2: SR 530, 59th Ave NE & 211th Pl NE Intersection Improvements

Contract number: 009932
Engineer's estimate: $1,494,964.00
Number of addenda: 3
Number of bidders: 6/4
Award status: awarded 3/15/2023

Preliminary bid total results

Apparent low: Faber Construction Corp. - $1,645,171.00
Apparent second: Laser Underground & Earthworks, Inc. - $1,895,124.00
Apparent third: Granite Construction Company - $1,993,340.00

Verified bid total results

Low bidder: Faber Construction Corp.
Bid amount: $1,645,171.00

Subcontractor named

  1. Sail Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $240,508.00
    Description of work: traffic control
  2. O'Bunco Engineering, Inc. - sub - $19,975.00
    Description of work: roadway surveying

DBE goal: $246,775.65
DBE total: $260,483.00

Second bidder: Laser Underground & Earthworks, Inc. 
Bid amount: $1,895,124.00

Subcontractor named

  1. McDonald-Miller Facility Solutions
    Description of work: any HVAC
  2. McDonald-Miller Facility Solutions
    Description of work: any plumbing
  3. Sail Electric, Inc.
    Description of work: any electrical including BI 46-49
  4. M2
    Description of work: any structural steel 
  5. M2
    Description of work: any rebar installation

Disadvantaged business enterprise (DBE) 

  1. M2 - sub - $18,700.00
    Description of work: guardrails
  2. AGS - sub - $243,318.60
    Description of work: traffic control
  3. Outwest Landscape - sub - $22,250.00
    Description of work: landscape

DBE goal: $284,268.60
DBE total: $284,268.60

Third bidder: Granite Construction Company
Bid amount: $1,993,340.00

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical, illumination

Disadvantaged business enterprise (DBE) 

  1. Finkbonner Flagging LLC - sub - $145,000.00
    Description of work: temporary traffic control
  2. Electric West, Inc. - sub - $157,150.00
    Description of work: electrical, illumination

DBE goal: $299,001.00
DBE total: $302,150.00

Item no. 3: US 2 & US 97, Leavenworth & N of Blewett Pass - Paving

Contract number: 009934
Engineer's estimate: $10,118,684.48
Number of addenda: 2
Number of bidders: 3/3
Award status: pending

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $9,777,000.00
Apparent second: Interstate Concrete & Asphalt Company - $10,081,826.83
Apparent third: Granite Construction Company - $11,930,371.28

Verified bid total results

Low bidder: Central Washington Asphalt, Inc. 
Bid amount: $9,777,000.00

Subcontractor named

  1. Midland Electric, Inc.
    Description of work: electrical, illumination

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $1,244,029.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, misc. removal & installations (i.e. temp, paint stripes), guide posts, sign erection, crack sealing, joint sealing
  2. O'Bunco Engineering, Inc. - sub - $59,405.00
    Description of work: land surveying: GPS control, boundary and construction layout/staking
  3. Olin Excavation, LLC - sub - $192,112.56
    Description of work: excavation contractors, bridge decking construction, culverts, highway, road and street construction, road construction, sidewalk, public construction
  4. Olin Excavation, LLC - sub - $75,850.00
    Description of work: dump trucking

DBE goal: $1,564,320.00
DBE total: $1,571,396.56

Second bidder: Interstate Concrete & Asphalt Company
Bid amount: $10,081,826.83

Subcontractor named

  1. Neppel Electrical & Controls, LLC
    Description of work: electrical
  2. Combined Construction
    Description of work: rebar installations

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - sub - $1,267,000.00
    Description of work: traffic control, crack seal, joint seal, RPM's rumble strips, temp pavement markings, guide post
  2. O'Bunco Engineering - sub - $50,810.00
    Description of work: surveying
  3. Neppel Electrical & Controls, LLC - sub - $195,500.00
    Description of work: electrical
  4. Gilbert Patterson Concrete - sub - $88,465.00
    Description of work: concrete curb gutter, sidewalk and ADA ramps
  5. The Bag Lady - sub - $11,336.00
    Description of work: catch basin inserts

DBE goal: $1,613,092.29
DBE total: $1,613,111.00

Third bidder: Granite Construction Company
Bid amount: $11,930,371.28

Subcontractor named

  1. Neppel Electric & Controls, LLC
    Description of work: electrical
  2. Gilbert Patterson Concrete, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $1,384,852.00
    Description of work: traffic control, temp & recessed pavement markings, rumble strips, guide posts, joint & crack sealing, sweeping
  2. O'Bunco Engineering, Inc. - sub - $92,055.00
    Description of work: land surveying
  3. M2 Industrial, Inc. - sub - $141,222.00
    Description of work: guardrail construction, concrete barriers
  4. Gilbert Patterson Concrete - sub - $89,545.00
    Description of work: curb & gutter concrete construction for sidewalks, wheelchair ramps (ADA)
  5. Neppel Electrical & Controls, LLC - sub - $201,800.00
    Description of work: electrical
  6. North Star Enterprises, Inc. - sub (force account) - $0
    Description of work: traffic control

DBE goal: $1,908,859.39
DBE total: $1,909,474.00

Item no. 4: US 395, NSC Spokane River Crossing

Contract number: 009925
Engineer's estimate: $71,052,885.32
Number of addenda: 6
Number of bidders: 6/4
Award status: pending

Preliminary bid total results

Apparent low: Max J. Kuney Company - $68,633,024.50
Apparent second: Garco Construction, Inc. - $74,947,000.00
Apparent third: Flatiron West, Inc. - $85,330,927.00

Verified bid total results

Low bidder: Max J. Kuney Company 
Bid amount: $68,633,024.50

Subcontractor named

  1. Harris Rebar Columbia Basin, Inc.
    Description of work: rebar installation
  2. Mill Plain Electric
    Description of work: electrical

Small business enterprise (SBE)

  1. Century Survey, Inc. - sub - $227,530.00
    Description of work: survey
  2. Grady Excavating - sub - $3,220,000.00
    Description of work: earthwork & underground

SBE goal: $3,431,651.23
SBE total: $3,447,530.00

Veteran-owned business (VOB)

  1. Acme Concrete Paving, Inc. - sub - $2,064,284.00
    Description of work: PCCP paving

VOB goal: $2,058,990.74
VOB total: $2,064,284.00

Second bidder: Garco Construction, Inc. 
Bid amount: $74,947,000.00

Subcontractor named

  1. NUCOR - Harris Rebar Columbia Basin, Inc.
    Description of work: rebar installation
  2. Power City Electric
    Description of work: electrical 

Small business enterprise (SBE)

  1. Century Survey, Inc. - sub - $297,230.00
    Description of work: surveying services
  2. John-Wayne Construction, Co. - sub - $1,472,745.00
    Description of work: partial - concrete barrier
  3. T & T Trucking, Inc. - sub - $891,845.00
    Description of work: partial - material transport
  4. Inland Northwest Precast - manufacturer/supplier - $1,312,228.00
    Description of work: partial - mfr precast concrete

SBE goal: $3,747,350.00
SBE total: $3,974,048.00

Veteran-owned business (VOB)

  1. ACME Concrete Paving - sub - $2,255,021.00
    Description of work: partial - PCCP
  2. Inland Northwest Precast - manufacturer/supplier - $166,712.00
    Description of work: partial - precast concrete

VOB goal: $2,248,410.00
VOB total: $2,421,733.00

Third bidder: Flatiron West, Inc.
Bid amount: $85,330,927.00

Subcontractor named

  1. Harris Rebar Columbia Basin, Inc.
    Description of work: rebar
  2. Mill Plain Electric
    Description of work: electrical
  3. Adams & Smith, Inc.
    Description of work: structural steel

Small business enterprise (SBE)

  1. Bridge Drain System, LLC - manufacturer/supplier - $988,936.00
    Description of work: bridge drain (partial) - supply
  2. M2 Industrial, Inc. - sub - $96,994
    Description of work: guardrail
  3. O'Bunco Engineering, Inc. - sub - $508,120.00
    Description of work: survey (63 partial) - survey
  4. T&T Trucking, Inc. - sub - $906,863.00
    Description of work: girders & slabs (partial) - haul
  5. Northern Resource Consl - sub - $166,545.00
    Description of work: landscaping
  6. D&B Landworks & Dev - sub - $100,000.00
    Description of work: trucking (partial)
  7. West Star Construction - sub - 100,000.00
    Description of work: trucking (partial)
  8. John-Wayne Const. Co. - sub - $1,461,748.00
    Description of work: concrete barrier (1 partial)

SBE goal: $4,266,546.35
SBE total: $4,329,206.00

Veteran-owned business (VOB)

  1. B&B Structures, LLC - sub - $1,023,660.00
    Description of work: metal railing (63 partial)
  2. NW Linings & Geotextile - manufacturer/supplier - $42,553.00
    Description of work: geosynthetic matls (63 partial)
  3. INW Precast - manufacturer/supplier - $2,097,710.00
    Description of work: precast panels (63 partial)

VOB goal: $2,559,927.81
VOB total: $3,163,923.00

2/15/2023 bid opening - Olympia, WA

Item no. 1: SR 8, US 12 to US 101 Paving

Contract number: XE3404
Engineer's estimate: $5,601,661.10
Number of addenda: 3
Number of bidders: 5/4
Award status: pending

Preliminary bid total results

Apparent low: Tucci & Sons, Inc. - $5,287,685.15
Apparent second: Granite Construction Company - $5,647,729.69
Apparent third: Miles Resources, LLC - $5,953,474.55

Verified bid total results

Low bidder: Tucci & Sons, Inc.
Bid amount: $5,287,685.15

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Carli Trucking by Looker LLC - sub - $151,800.00
    Description of work: dump trucking
  2. Yelm Property Development LLC DBA C&C Development - sub - $101,200.00
    Description of work: dump trucking
  3. Penney Trucking LLC - sub - $101,200.00
    Description of work: dump trucking
  4. The Bag Lady, Inc. - sub - $18,478.00
    Description of work: erosion control
  5. O'Bunco Engineering Int'l, Inc. DBA O'Bunco Engineering, Inc. - sub - $41,435.00
    Description of work: surveying
  6. Advanced Government Services, Inc. - sub - $405,500.00
    Description of work: flagging and traffic control services
  7. Tunista Construction, LLC - sub - $101,200.00
    Description of work: dump trucking
  8. Michaelis Trucking & Excavating, Inc. - sub - $50,600.00
    Description of work: dump trucking
  9. Pacific Rim Service and Construction Co., Inc. - sub - $89,000.00
    Description of work: guide post

DBE goal: $1,057,537.03
DBE total: $1,060,413.00

2nd bidder: Granite Construction Company
Bid amount: $5,647,729.69

Subcontractor named

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $785,000.00
    Description of work: traffic control
  2. The Bag Lady, Inc. - sub - $34,000.00
    Description of work: catch basin inserts
  3. Pacific Rim Service and Construction Co., Inc. - sub - $89,000.00
    Description of work: guide posts
  4. Carli Trucking by Looker LLC - sub - $105,000.00
    Description of work: transportation of asphalt (dump trucking)
  5. Tunista Construction, LLC - sub - $105,000.00
    Description of work: dump trucking
  6. Michaelis Trucking & Excavating, Inc. DBA Michaelis Trucking & Excavating, LLC - sub - $25,000.00
    Description of work: hauling asphalt & millings

DBE goal: $1,129,545.94
DBE total: $1,143,000.00

3rd bidder: Miles Resources, LLC
Bid amount: $5,953,474.55

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. AAA Contractors, Inc. - sub - $325,972.00
    Description of work: asphalt milling, pavement repair, excavation
  2. The Bag Lady, Inc. - sub - $18,478.00
    Description of work: inlet protection
  3. Express Iron Works, Inc. - sub - $207,068.00
    Description of work: guide posts, removal of guide posts
  4. Advanced Government Services, Inc. - sub - $385,883.00
    Description of work: traffic control services
  5. Tunista Construction, LLC - sub - $255,000.00
    Description of work: dump trucking (partial)

DBE goal: $1,190,694.91
DBE total: $1,192,401.00

2/1/2023 bid opening - Olympia, WA

Item no. 1: I-5, Koontz Road Bridge Emergency Bridge Repair

Contract number: 009930
Engineer's estimate: $883,110.00
Number of addenda: 1
Number of bidders: 9/5
Award status: awarded 2/22/2023

Preliminary bid total results

Apparent low: Selby Bridge Company, Inc. - $954,590.00
Apparent second: SB Structures, LLC - $1,008,911.00
Apparent third: Quigg Bros., Inc. - $1,056,312.00

Verified bid total results

Low bidder: Selby Bridge Company, Inc.
Bid amount: $954,590.00

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering, Inc. - sub - $8,000.00
    Description of work: survey
  2. Pacific Northwest Reinforcing, Inc. - sub - $29,343.00
    Description of work: furnish & install reinforcing steel
  3. The Traffic Control Company, Inc. - sub - $134,483.20
    Description of work: traffic control

DBE goal: $171,826.20
DBE total: $171,826.20

Second bidder: SB Structures, LLC
Bid amount: $1,008,911.00

Disadvantaged business enterprise (DBE) 

  1. PNW Reinforcing, Inc. - sub - $29,343.00
    Description of work: installation, placing and tying reinforcing steel
  2. John-Wayne Construction Company - sub - $66,550.00
    Description of work: concrete barrier
  3. W E Coates Surveying, LLC - sub - $15,000.00
    Description of work: construction surveying
  4. Hughes Group, LLC - sub - $72,000.00
    Description of work: flagging and traffic control

DBE goal: $181,603.98
DBE total: $182,893.00

Third bidder: Quigg Bros., Inc.
Bid amount: $1,056,312.00

Disadvantaged business enterprise (DBE) 

  1. PNW Reinforcing, Inc. - sub - $29,343.00
    Description of work: placing and tying reinforcing steel
  2. John Wayne Construction Co. - sub - $66,550.00
    Description of work: concrete barrier
  3. O'Bunco Engineering, Inc. - sub - $8,290.00
    Description of work:surveying
  4. The Traffic Control Company, Inc. - sub - $90,000.00
    Description of work:traffic control

DBE goal: $190,136.16
DBE total: $194,193.00

Item no. 2: SR 9, SR 528 to 132nd St NE Vic - Paving with Exceptions

Contract number: 009916
Engineer's estimate: $2,791,142.87
Number of addenda: 4
Number of bidders: 2/2
Award status: awarded 2/17/2023

Preliminary bid total results

Apparent low: Granite Construction Company - $2,502,439.50
Apparent second: Lakeside Industries, Inc. - $2,937,742.00 - rejected 2/10/2023

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $2,502,439.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Reece Construction Company - sub - $106,546.00
    Description of work: asphalt milling, bituminous planing, street sweeping
  2. O'Bunco Engineering Int'l, Inc. - sub - $14,780.00
    Description of work: surveying
  3. Al Vinson, Inc. - sub - $15,360.00
    Description of work: street sweeping
  4. Advanced Government Services, Inc. - sub - $316,148.50
    Description of work: traffic control services

DBE goal: $450,439.11
DBE total: $452,834.50

Second bidder: Lakeside Industries, Inc.  - rejected 2/10/2023
Bid amount: $2,937,742.00

Subcontractor named

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering, Inc. - sub - $14,780.00
    Description of work: surveying
  2. Reece Construction Company - sub - $106,896.00
    Description of work: bituminous planing, street sweeping
  3. Finkbonner Flagging, LLC - sub - $408,030.75
    Description of work: temporary traffic control 

DBE goal: $528,793.56
DBE total: $529,706.75

Item no. 3: SR 240, Columbia Center Blvd - Upgrade Signal & Illumination

Contract number: 009918
Engineer's estimate: $1,718,337.00
Number of addenda: 1
Number of bidders: 4/3
Award status: awarded 2/17/2023

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $1,220,204.00
Apparent second: Power City Electric, Inc. - $1,631,140.00
Apparent third: Colvico, Inc. - $1,675,000.00

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $1,220,204.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Traffic Management Inc. of Washington - sub - $110,000.00
    Description of work: 

DBE goal: $109,818.36
DBE total: $110,000.00

Second bidder: Power City Electric, Inc.
Bid amount: $1,631,140.00

Subcontractor named

  1. Traffic Management, Inc.
    Description of work: traffic control & construction signing

Disadvantaged business enterprise (DBE) 

  1. Traffic Management, Inc. - sub - $155.000.00
    Description of work: traffic control & construction signing

DBE goal: $146,802.60
DBE total: $155,000.00

Third bidder: Colvico, Inc.
Bid amount: $1,675,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Traffic Management, Inc. - sub - $2,500.00
    Description of work: permanent signing (6890)
  2. Traffic Management, Inc. - sub - $5,500.00
    Description of work: portable changeable message sign (6993)
  3. Traffic Management, Inc. - sub - $142,000.00
    Description of work: project temporary traffic control (6971)
  4. Traffic Management, Inc. - sub - $2,080.00
    Description of work: construction signs Class A (6982)

DBE goal: $150,750.00
DBE total: $152,080.00

Item no. 4: US 2/97, Easy Street Roundabout

Contract number: 009921
Engineer's estimate: $5,728,840.56
Number of addenda: 4
Number of bidders: 9/4
Award status: awarded 3/6/2023

Preliminary bid total results

Apparent low: Johansen Construction Company, LLC - $5,443,779.15
Apparent second: Hurst Construction, LLC - $5,489,841.24
Apparent third: Selland Construction, Inc. - $6,470,275.00

Verified bid total results

Low bidder: Johansen Construction Company, LLC
Bid amount: $5,443,779.14**

Subcontractor named

  1. Highmark Concrete Contractors, LLC
    Description of work: rebar installation
  2. Midland Electric, Inc.
    Description of work: electrical work

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC - sub - $567,211.39
    Description of work: flatwork concrete, curb & gutter, concrete paving
  2. O'Bunco Engineering, Inc. - sub - $80,170.00
    Description of work: surveying
  3. Northern Resources Consulting, Inc. - sub - $125,000.00
    Description of work: landscaping services

DBE goal: $762,129.08
DBE total: $772,381.39

Second bidder: Hurst Construction, LLC
Bid amount: $5,489,841.24

Subcontractor named

  1. Hurst Construction, LLC
    Description of work: structural steel
  2. Highmark Concrete Contractor, LLC
    Description of work: rebar installation
  3. Climatek, LLC
    Description of work: HVAC 
  4. Midland Electric
    Description of work: electrical work 
  5. Hurst Construction, LLC
    Description of work: plumbing

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete - sub - $577,711.39
    Description of work: concrete dowl bar, cement concrete (partial) curb & gutter, ramp, detectable warning surface and pigment buffer
  2. The Bag Lady - sub - $7,792.95
    Description of work: silt fence, high visibility fencing
  3. Traffic Management, Inc. - sub - $190,764.00
    Description of work: plastic markings, striping, permanent signing

DBE goal: $768,577.77
DBE total: $776,268.34

Third bidder: Selland Construction, Inc.
Bid amount: $6,470,275.00

Subcontractor named

  1. Midland Electric
    Description of work: electrical, rebar 
  2. Gilbert Patterson Concrete, Inc.
    Description of work: dowel bar

Disadvantaged business enterprise (DBE) 

  1. Gilbert Patterson Concrete, Inc. - sub - $685,206.58
    Description of work: concrete
  2. TBMM, LLC - sub - $240,365.00
    Description of work: traffic control

DBE goal: $905,838.50
DBE total: $925,571.58

Item no. 5: SR 20, Unnamed Tributary to Red Creek Fish Passage

Contract number: 009924
Engineer's estimate: $3,336,923.63
Number of addenda: 2
Number of bidders: 10/7
Award status: awarded 2/8/2023

Preliminary bid total results

Apparent low: Interwest Construction, Inc. - $3,034,008.24
Apparent second: Colacurcio Brothers, Inc. - $3,260,898.84
Apparent third: Strider Construction Co., Inc. - $3,323,277.00

Verified bid total results

Low bidder: Interwest Construction, Inc.
Bid amount: $3,034,008.24

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. Rebar International, Inc.
    Description of work: rebar installation
  3. Interwest Construction, Inc.
    Description of work: steel installation

Second bidder: Colacurcio Brothers, Inc.
Bid amount: $3,260,898.84

Subcontractor named

  1. Electrical West, Inc.
    Description of work: electrical 
  2. Combined Construction, Inc.
    Description of work: rebar installation
  3. Combined Construction, Inc.
    Description of work: structural steel

Third bidder: Strider Construction Co., Inc.
Bid amount: $3,323,277.00

Subcontractor named

  1. Service Electric
    Description of work: electrical 
  2. Strider Construction Co., Inc.
    Description of work: rebar installation
  3. Strider Construction Co., Inc.
    Description of work: structural steel installation

Item no. 6: SR 7, Unnamed Tribs to S Creek Remove Fish Barriers & Paving

Contract number: 009928
Engineer's estimate: $5,926,511.00
Number of addenda: 3
Number of bidders: 10/4
Award status: awarded 2/22/2023

Preliminary bid total results

Apparent low: Tucci & Sons, Inc. - $5,316,023.25 - rejected 2/8/2023
Apparent second: Active Construction, Inc. - $5,575,575.00
Apparent third: Johansen Construction Company, LLC - $5,652,346.50

Verified bid total results

Low bidder: Tucci & Sons, Inc.  - rejected 2/8/2023
Bid amount: $5,316,023.25

Subcontractor named

  1. West Coast Signal, Inc.
    Description of work: electrical
  2. G&G, Inc.
    Description of work: electrical
  3. Combined Construction
    Description of work: rebar
  4. Combined Construction
    Description of work: structural steel

Disadvantaged business enterprise (DBE) 

  1. Lee's Demo - sub - $296,000.00
    Description of work: streambed, restoration, clearing & grubbing
  2. Pacific Rim Service & Construction Company - sub - $163,000.00
    Description of work: guardrail
  3. Advanced Government Services - sub - $400,000.00
    Description of work: traffic control
  4. Tonista Construction, LLC - sub - $70,000.00
    Description of work: dump trucking
  5. O'Bunco Engineering Int'l - sub - $79,185.00
    Description of work: survey
  6. G&G, Inc. - sub - $26,000.00
    Description of work: electrical
  7. The Bag Lady - sub - $26,400.00
    Description of work: erosion control

DBE goal: $1,010,044.41
DBE total: $1,060,585.00

Second bidder: Active Construction, Inc.
Bid amount: $5,575,575.00

Subcontractor named

  1. West Coast Signal
    Description of work: electrical 
  2. ACI
    Description of work: structural steel
  3. Pacific NW Reinforcing
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. Pacific NW Reinforcing - sub - $57,973.00
    Description of work: reinforcing bar
  2. John Wayne Construction - sub - $75,500.00
    Description of work: concrete traffic barrier
  3. Pacific Rim Service & Construction - sub - $163,946.50
    Description of work: guardrail
  4. Tunista - sub - $155,000.00
    Description of work: dump trucking
  5. Castaneda Landscaping - sub - $124,414.00
    Description of work: landscaping
  6. O'Bunco Engineering - sub - $79,185.00
    Description of work: survey
  7. Advanced Government Services - sub - $409,864.00
    Description of work: traffic control services

DBE goal: $1,059,359.25
DBE total: $1,065,882.50

Third bidder: Johansen Construction Company, LLC
Bid amount: $5,652,346.58**

Subcontractor named

  1. PNW Reinforcing, Inc.
    Description of work: rebar installation
  2. Stetner Construction Group
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC - sub - $1,192,200.00
    Description of work: contractor designed buried structures & traffic barrier moment slab

DBE goal: $1,073,945.85
DBE total: $1,192,200.00

1/25/2023 bid opening - Olympia, WA

Item no. 1: SR 109, W of Hoquiam - Stabilize Slope

Contract number: 009926
Engineer's estimate: $568,437.00
Number of addenda: 1
Number of bidders: 9/8
Award status: awarded 2/8/2023

Preliminary bid total results

Apparent low: Rognlin's, Inc. - $310,354.00
Apparent second: Scarsella Bros. Inc. - $362,454.00
Apparent third: Brumfield Construction, Inc. - $490,954.00

Verified bid total results

Low bidder: Rognlin's, Inc.
Bid amount: $310,354.00

Second bidder: Scarsella Bros. Inc.
Bid amount: $362,454.00

Third bidder: Brumfield Construction, Inc.
Bid amount: $490,954.00

Item no. 2: I-5, SB Joe Leary Slough To Nulle Rd Vic Concrete Rehabilitation

Contract number: 009910
Engineer's estimate: $8,603,306.17
Number of addenda: 4
Number of bidders: 5/5
Award status: awarded 2/9/2023

Preliminary bid total results

Apparent low: Acme Concrete Paving, Inc. - $8,794,434.50
Apparent second: IMCO General Construction, Inc. - $9,262,484.00
Apparent third: Interwest Construction, Inc. - $9,285,571.00

Verified bid total results

Low bidder: Acme Concrete Paving, Inc.
Bid amount: $8,794,434.50

Subcontractor named

  1. Valley Electric
    Description of work: electrical

Small business enterprise (SBE)

  1. BC Traffic LLC - sub - $525,000.00
    Description of work: project temp traffic control

SBE goal: $439,721.72
SBE total: $525,000.00

Veteran-owned business (VOB)

  1. Acme Concrete Paving - prime - $2,687,160.00
    Description of work: cem conc pavement grinding

VOB goal: $175,888.69
VOB total: $2,687,160.00

Second bidder: IMCO General Construction, Inc.
Bid amount: $9,262,484.00

Subcontractor named

  1. Sail Electric, Inc.
    Description of work: electrical
  2. IMCO General Construction, Inc.
    Description of work: steel
  3. IMCO General Construction, Inc.
    Description of work: rebar

Small business enterprise (SBE)

  1. Hughes Group LLC - sub - $393,782.00
    Description of work: traffic control
  2. PSE (Pac Survey & Eng) - sub - $4,960.00
    Description of work: survey
  3. PSE (Pac Survey & Eng) - sub - $4,850.00
    Description of work: survey
  4. PSE (Pac Survey & Eng) - sub - $60,000.00
    Description of work: survey

SBE goal: $463,124.20
SBE total: $463,592.00

Veteran-owned business (VOB)

  1. Hughes Group LLC - sub - $185,250.00
    Description of work: traffic control

VOB goal: $185,249.68
VOB total: $185,250.00

Third bidder: Interwest Construction, Inc.
Bid amount: $9,285,571.00

Subcontractor named

  1. Interwest Construction, Inc.
    Description of work: structural steel installation
  2. Interwest Construction, Inc.
    Description of work: rebar installation
  3. Sail Electric, Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. Pavement Surface Control - sub - $846,452.00
    Description of work: pavement markings

SBE goal: $464,278.55
SBE total: $846,452.00

Veteran-owned business (VOB)

  1. Acme Concrete Paving, Inc. - sub - $231,356.00
    Description of work: crack sealing

VOB goal: $185,711.42
VOB total: $231,356.00

Item no. 3: SR 127 & US 195, Hot Mix Asphalt Paving

Contract number: 009914
Engineer's estimate: $6,725,530.50
Number of addenda: 6
Number of bidders: 4/4
Award status: awarded 2/8/2023

Preliminary bid total results

Apparent low: Poe Asphalt Paving, Inc. - $6,131,860.75
Apparent second: Central Washington Asphalt, Inc. - $6,365,000.00
Apparent third: CPM Development Corporation - $6,959,596.00

Verified bid total results

Low bidder: Poe Asphalt Paving, Inc.
Bid amount: $6,131,860.75

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Knox Concrete, LLC - sub - $20,060.00
    Description of work: concrete finishing, concrete repair, concrete paving
  2. O'Bunco Engineering, Inc. - sub - $56,765.00
    Description of work: land surveying: GPS control, boundary and construction, layout/staking, construction management: highway, bridges
  3. North Star Enterprises I, Inc. - sub - $842,955.00
    Description of work:  flagging, traffic control, temp pavement marking & striping, rumble strips, removal & installations (ie: temp paint stripes), guide posts, sweeping, sign erection, joint sealing, wattles

DBE goal: $919,779.11
DBE total: $919,780.00

Second bidder: Central Washington Asphalt, Inc.
Bid amount: $6,365,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Audi Construction, LLC - sub - $28,000.00
    Description of work: the hauling of dirt, gravel, grinding and asphalt
  2. O'Bunco Engineering - sub - $56,765.00
    Description of work: land surveying, construction, layout/staking
  3. North Star Enterprises, Inc. - sub - $870,249.00
    Description of work: flagging, traffic control, temp pavement marking & striping, rumble strips, misc. removal and installations (ie: temp painting stripes) guide posts, sign erection, sweeping, joint sealing, wattles

DBE goal: $954,750.00
DBE total: $955,014.00

Third bidder: CPM Development Corporation
Bid amount: $6,959,596.00

Subcontractor named

  1. Colvico, Inc.
    Description of work: electrical for portable plant

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc., DBA North Star Enterprises 1, Inc. - sub - $680,377.00
    Description of work: flagging, traffic control, temp pavement marking & striping, rumble strips, removal & installations, guide posts, sweeping, joint sealing, wattles
  2. Ditches Unlimited, Inc. - sub - $130,025.00
    Description of work: highway, road and street, construction
  3. O'Bunco Engineering Int'l, Inc. DBA O'Bunco Engineering, Inc. - sub - $41,685.00
    Description of work: land surveying: GPS control, boundary and construction, layout/staking
  4. A.M.C. Trucking LLC - sub - $92,250.00
    Description of work: dump trucking
  5. D & B Landworks and Development, LLC - sub - $103,200.00
    Description of work: hauling services of asphalt with the use of dump trucks

DBE goal: $1,043,939.40
DBE total: $1,047,537.00

1/19/2023 bid opening - Olympia, WA

Item no. 1: US 2, Northwest Region HMA Crack Seal and Pavement Repair

Contract number: 009912
Engineer's estimate: $2,838,472.00
Number of addenda: 1
Number of bidders: 5/3
Award status: awarded 1/27/2023

Preliminary bid total results

Apparent low: Granite Construction Company - $2,166,312.00
Apparent second: Construction Ahead, Inc. dba Pavement Surface Control - $2,597,696.45
Apparent third: Doolittle Construction, LLC - $3,295,317.00

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $2,166,312.00

Subcontractor named

  1. G&G Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. BCV - sub - $120,000.00
    Description of work: crack sealing

SBE goal: $108,315.60
SBE total: $120,000.00

Veteran-owned business (VOB)

  1. Fastsigns - manufacturer - $50,000.00
    Description of work: maintenance of traffic signs

VOB goal: $43,326.24
VOB total: $50,000.00

Second bidder: Construction Ahead, Inc. dba Pavement Surface Control
Bid amount: $2,597,696.45

Subcontractor named

  1. G&G Inc.
    Description of work: electrical, induction loop detection

Small business enterprise (SBE)

  1. G&G Inc. - sub - $136,800
    Description of work: induction loop detection 

SBE goal: $129,884.82
SBE total: $136,800.00

Veteran-owned business (VOB)

  1. Hughes Group LLC - sub - $420,630.90
    Description of work: traffic control

VOB goal: $51,953.92
VOB total: $420,630.90

Third bidder: Doolittle Construction, LLC
Bid amount: $3,295,317.00

Subcontractor named

  1. G&G Inc.
    Description of work: induction loop detection/repair

Small business enterprise (SBE)

  1. G&G Inc. - sub - $151.800.00
    Description of work: induction loop detection
  2. American Veterans Const. - sub - $7,750.00
    Description of work: erosion/water pollution control
  3. American Veterans Const. - sub - $7,750.00
    Description of work: roadside cleanup

SBE goal: $164,765.85
SBE total: $167,300.00

Veteran-owned business (VOB)

  1. American Veterans Const. - sub - $70,000.00
    Description of work: apply mastic to cracks over 1"

VOB goal: $65,906.34
VOB total: $70,000.00

Item no. 2: I-5, Snohomish River Bridge (BN RR) Painting

Contract number: 009913
Engineer's estimate: $18,650,557.00
Number of addenda: 1
Number of bidders: 14/12
Award status: awarded 2/8/2023

Preliminary bid total results

Apparent low: Vimas Painting Company, Inc. - $13,710,507.00
Apparent second: Blastech Enterprises, Inc. - $14,264,207.00 - rejected 2/10/2023
Apparent third: Liberty Maintenance, Inc. - $14,638,582.91

Verified bid total results

Low bidder: Vimas Painting Company, Inc.
Bid amount: $13,710,507.00

Subcontractor named

  1. Combined Construction
  2. Description of work: replace vacant/damage bolts, force account - misc steel repair

Disadvantaged business enterprise (DBE) 

  1. Steel City Contractors, LLC - sub - $1,580,000.00
    Description of work: rigging and installation of containment platform
  2. Northern Resource Consulting, Inc. - sub - $191,000.00
    Description of work: CESCL erosion control inspections, SPCC, SWPPP, erosion control
  3. Advanced Government Services, Inc. - sub - $360,000.00
    Description of work: temporary traffic control

DBE goal: $1,919,470.98
DBE total: $2,131,000.00

Second bidder: Blastech Enterprises, Inc.  - rejected 2/10/2023
Bid amount: $14,264,207.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Northern Resource Consulting, Inc. - sub - $1,081,000.00
    Description of work: testing and disposal of contaminated waste, ESC lead, erosion control & water pollution prevention, roadside cleanup, SPCC plan, no trespassing sings, health and safety plan
  2. Atlas Construction Specialties - regular dealer - $519,996.00
    Description of work: abrasives, paints, thinners, miscellaneous construction supplies
  3. KBT Distributing - regular dealer - $351,000.00
    Description of work: supplier of diesel fuel on the project
  4. BC Traffic, LLC - sub - $50,000.00
    Description of work: project temporary traffic control

DBE goal: $1,996,988.98
DBE total: $2,001,996.00

Third bidder: Liberty Maintenance, Inc.
Bid amount: $14,638,582.91

Subcontractor named

  1. Combined Construction
    Description of work: replace vacant/damaged or loose bolt with HS bolt, force account - misc steel repair

Disadvantaged business enterprise (DBE) 

  1. Structural Coatings, Inc. - sub - $969,653.80
    Description of work: scaffold erecting & dismantling (partial)
  2. Northern Resource Consulting, Inc. - sub - $256,000.00
    Description of work: environmental consulting services, sign erection, erosion protection control, SPCC
  3. Northern Resource Consulting, Inc. - sub (force account) - $855,000.00
    Description of work: soil testing laboratories or services (testing & disposal of contaminated waste), erosion control, environmental consulting, landscape services

DBE goal: $2,049,401.61
DBE total: $2,080,653.80

Item no. 3: SR 167 Completion Demo 9

Contract number: 009911
Engineer's estimate: $278,732.00
Number of addenda: 1
Number of bidders: 14/7
Award status: awarded 2/8/2023

Preliminary bid total results

Apparent low: Skycorp, Ltd. $199,947.00 
Apparent second: Dickson Company - $232,942.00
Apparent third: Titan Earthwork, LLC - $299,777.00

Verified bid total results

Low bidder: Skycorp, Ltd.
Bid amount: $199,947.00 

Second bidder: Dickson Company
Bid amount: $232,942.00

Third bidder: Titan Earthwork, LLC
Bid amount: $299,777.00

Item no. 4: US 101, Elwha River Bridge – Bridge Replacement

Contract number: 009891
Engineer's estimate: $25,918,155.18
Number of addenda: 7
Number of bidders: 14/7
Award status: awarded 2/15/2023

Preliminary bid total results

Apparent low: Ceccanti, Inc. - $27,649,813.50
Apparent second: Johansen Construction Company, LLC. - $29,551,014.14
Apparent third: Scarsella Bros., Inc. - $30,340,512.40

Verified bid total results

Low bidder: Ceccanti, Inc.
Bid amount: $27,649,813.50

Subcontractor named

  1. ADP Construction Service, Inc.
    Description of work: electrical
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation
  3. Ceccanti, Inc.
    Description of work: structural steel installation, HVAC, plumbing

Disadvantaged business enterprise (DBE) 

  1. Burley Products, Inc. - sub - $197,315.05
    Description of work: fabrication of metal railings
  2. O'Bunco Engineering - sub - $251,730.00
    Description of work: surveying
  3. ADP Construction Services, Inc. - sub - $299,547.00
    Description of work: electrical - illumination system
  4. C&R Tractor & Landscape, Inc. - sub - $975,401.50
    Description of work: landscaping services
  5. C&R Tractor & Landscape, Inc. - sub (force account) - $73,000.00
    Description of work: plant establishment
  6. M2 Industrial, Inc. - sub - $191,352.00
    Description of work: guardrail
  7. PNW Reinforcing, Inc. - sub - $1,167,134.00
    Description of work: rebar installation
  8. The Bag Lady, Inc. - sub - $300,000.00
    Description of work: erosion control, onsite fabrication of sand bags
  9. ATS Traffic Control LLC - sub - $1,245,020.45
    Description of work: flagging and traffic control

DBE goal: $4,700,468.30
DBE total: $4,700,500.00

Second bidder: Johansen Construction Company, LLC.
Bid amount: $29,551,014.14

Subcontractor named

  1. Malcolm Drilling Company, Inc.
    Description of work: structural steel installation
  2. Pacific Steel Group
    Description of work: rebar installation 
  3. Stetner Construction Group
    Description of work: electrical work

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC. - sub - $5,361,361.00
    Description of work: bridge and CIP wall construction

DBE goal: $5,023,672.40
DBE total: $5,361,361.00

Third bidder: Scarsella Bros., Inc.
Bid amount: $30,340,512.40

Subcontractor named

  1. SB Structures LLC
    Description of work: structural steel 
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation
  3. Stetner Construction Group
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. PNW Reinforcing, Inc. - sub - $1,167,134.00
    Description of work: installation, placing and tying reinforcing steel
  2. John-Wayne Construction Company - sub - $319,900.00
    Description of work: concrete slip-form barrier
  3. MNG Construction LLC - sub - $661,560.40
    Description of work: earth retention system, excavating and culvert construction
  4. Industry Erectors, Inc. - sub - $2,197,770.00
    Description of work: prestressed concrete beam
  5. Burly Productions, Inc. - sub - $197,315.05
    Description of work: fabrication manufacturing and installation of metal railings
  6. C&R Tractor & Landscape, Inc. - sub - $1,121,400.00
    Description of work: landscape related work, other construction and environmental related work

DBE goal: $5,157,887.11
DBE total: $5,665,079.45

1/11/2023 bid opening - Olympia, WA

Item no. 1: I-5, Duwamish River To S Lucile St Concrete Pavement Rehab & Joints

Contract number: 009901
Engineer's estimate: $23,496,047.00
Number of addenda: 2
Number of bidders: 3/1
Award status: all bids rejected 1/26/2023

Preliminary bid total results

Apparent low: Gary Merlino Construction Co., Inc. - $37,397,512.50 - rejected 1/26/2023

Verified bid total results

Low bidder: Gary Merlino Construction Co., Inc.  - rejected 1/26/2023
Bid amount: $37,397,512.50

Subcontractor named

  1. Prime Electric, Inc.
    Description of work: electrical
  2. Shinn Mechanical, Inc.
    Description of work: plumbing
  3. Shinn Mechanical, Inc.
    Description of work: HVAC
  4. Cruncher Construction
    Description of work: rebar installation
  5. Gary Merlino Construction Co., Inc.
    Description of work: structural steel installation

Small business enterprise (SBE)

  1. Novito Construction, Inc. - sub - $2,100,000.00
    Description of work: traffic control

SBE goal: $1,869,875,63
SBE total: $2,100,000.00

Veteran-owned business (VOB)

  1. Acme Concrete Paving, Inc. - sub - $8,500,000.00
    Description of work: cement concrete pavement grinding

VOB goal: $1,121,925.38
VOB total: $8,500,000.00

Item no. 2: SR 202, Evans Crk Vic to SE Fish Hatchery Rd Vic Stormwater Retrofit

Contract number: 009908
Engineer's estimate: $326,438.00
Number of addenda: 1
Number of bidders: 7/5
Award status: awarded 1/27/2023

Preliminary bid total results

Apparent low: Konnerup Construction, Inc. - $282,402.00 - rejected 1/24/2023
Apparent second: OMA Construction, Inc. - $308,059.00
Apparent third: Laser Underground & Earthworks, Inc. - $325,425.50  - rejected 1/24/2023

Verified bid total results

Low bidder: Konnerup Construction, Inc.  - rejected 1/24/2023
Bid amount: $282,402.00

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $47,500.00
    Description of work: permanent/temporary guardrail installation

DBE goal: $50,832.36
DBE total: $47,500.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

Second bidder: OMA Construction, Inc.
Bid amount: $308,059.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $60,000.00
    Description of work: temp. traffic control

DBE goal: $55,450.62
DBE total: $72,399.00

Third bidder: Laser Underground & Earthworks, Inc.  - rejected 1/24/2023
Bid amount: $325,425.50

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $49,300.00
    Description of work: remove & reset guardrail, temp. barrier
  2. Advanced Government Services, Inc. - sub (force account) - $9,300.00
    Description of work: traffic control (partial) and devices, work zone safety contingency

DBE goal: $58,576,59
DBE total: $58,600.00

Item no. 3: SR 500, NE Fourth Plain Blvd – 162nd – 166th Ave – Safe Route to School

Contract number: 009909
Engineer's estimate: $846,985.36
Number of addenda: 0
Number of bidders: 5/4
Award status: pending 

Preliminary bid total results

Apparent low: Thompson Bros. Excavating, Inc.- $953,000.00 - awarded 1/26/2023
Apparent second: McDonald Excavating, Inc. - $992,974.72
Apparent third: Advanced Excavating Specialists, LLC - $1,027,739.92 - rejected 1/20/2023

Verified bid total results

Low bidder: Thompson Bros. Excavating, Inc.  - awarded 1/26/2023
Bid amount: $953,000.00

Disadvantaged business enterprise (DBE) 

  1. Schneider & Sons, Inc. - sub - $227,556.00
    Description of work: electrical

DBE goal: $162,010.00
DBE total: $227,556.00

Second bidder: McDonald Excavating, Inc.
Bid amount: $992,974.72

Disadvantaged business enterprise (DBE) 

  1. McDonald Excavating, Inc. - prime - $175,000.00
    Description of work: riprap installation, trenching, site prep, road and street culverts, site construction

DBE goal: $168,805.70
DBE total: $175,000.00

Third bidder: Advanced Excavating Specialists, LLC  - rejected 1/20/2023
Bid amount: $1,027,739.92

Disadvantaged business enterprise (DBE) 

  1. Schneider & Sons, Inc. - sub - $180,000.00
    Description of work: electrical, illumination, traffic signal system & radio comm.

DBE goal: $174,715.79
DBE total: $180,000.00

Item no. 4: SR 14 et al, SWR Breakaway Cable Terminal Replacement Freeways 21-23

Contract number: 009915
Engineer's estimate: $1,266,926.88
Number of addenda: 0
Number of bidders: 5/4
Award status: all bids rejected 2/15/2023

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $1,618,481.43 - rejected 2/13/2023
Apparent second: Dirt and Aggregate Interchange, Inc. - $1,619,619.00 - rejected 2/15/2023
Apparent third: Coral Construction Company - $1,681,777.10 - rejected 2/15/2023

Verified bid total results

Low bidder: Massana Construction, Inc.  - rejected 2/13/2023
Bid amount: $1,618,481.43

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $396,000.00
    Description of work: guardrail construction of all types

DBE goal: $258,957.02
DBE total: $396,000.00

Second bidder: Dirt and Aggregate Interchange, Inc.  - rejected 2/15/2023
Bid amount: $1,619,619.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $267,820.02
    Description of work: flagging and traffic control services

DBE goal: $259,139.04
DBE total: $267,820.02

Third bidder: Coral Construction Company  - rejected 2/15/2023
Bid amount: $1,681,777.10

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC - sub - $269,168.17
    Description of work: flagging (i.e. traffic control) services

DBE goal: $269,084.33
DBE total: $269,168.17

Item no. 5: SR 433, Lewis and Clark Bridge - Expansion Joint Replacement

Contract number: 009903
Engineer's estimate: $752,005.00
Number of addenda: 3
Number of bidders: 6/5
Award status: awarded

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $960,365.00 - rejected 2/8/2023
Apparent second: Combined Construction, Inc. - $1,009,305.00 - awarded 2/14/2023
Apparent third: Cascade Bridge, LLC - $1,182,355.99

Verified bid total results

Low bidder: Massana Construction, Inc.  - rejected 2/8/2023
Bid amount: $960,365.00

Disadvantaged business enterprise (DBE) 

  1. Schneider & Sons, Inc. - sub - $155,873.00
    Description of work: traffic control services
  2. O'Bunco Engineering, Inc. - sub - $7,390.00
    Description of work: survey

DBE goal: $163,262.05
DBE total: $163,263.00

Second bidder: Combined Construction, Inc.
Bid amount: $1,009,305.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $62,000.00
    Description of work: traffic control
  2. Sunset Company, LLC - sub - $110,000.00
    Description of work: structural steel erection

DBE goal: $171,581.85
DBE total: $172,000.00

Third bidder: Cascade Bridge, LLC
Bid amount: $1,182,355.99

Disadvantaged business enterprise (DBE) 

  1. BC Traffic LLC - sub - $194,195.00
    Description of work: flagging and traffic control services
  2. O'Bunco Engineering Int'l, Inc. - sub - $7,390.00
    Description of work: surveying

DBE goal: $201,000.52
DBE total: $201,585.00

12/21/2022 bid opening - Olympia, WA

Item no. 1: SR 20 Spur, Orcas Island Trm ADA Compliance Improvements Phase 2

Contract number: 009895
Engineer's estimate: $941,823.00
Number of addenda: 2
Number of bidders: 5/3
Award status: awarded 1/5/2023

Preliminary bid total results

Apparent low: Mike Carlson Enterprises, Inc. - $697,388.00
Apparent second: Taylor's Excavators, Inc. - $998,368.00 - rejected 1/4/2023
Apparent third: Colacurcio Brothers, Inc. - $1,274,931.00 - rejected 1/4/2023

Verified bid total results

Low bidder: Mike Carlson Enterprises, Inc.
Bid amount: $697,388.40**

Small business enterprise (SBE)

  1. Mike Carlson Enterprises, Inc. - prime - $80,000.00
    Description of work: preparation
  2. Mike Carlson Enterprises, Inc. - prime - $14,630.00
    Description of work: grading
  3. Mike Carlson Enterprises, Inc. - prime - $3,920.00
    Description of work: drainage
  4. Mike Carlson Enterprises, Inc. - prime - $6,460.00
    Description of work: storm sewer
  5. Mike Carlson Enterprises, Inc. - prime - $44,550.00
    Description of work: structure
  6. Mike Carlson Enterprises, Inc. - prime - $49,740.00
    Description of work: sufacing, haul
  7. Mike Carlson Enterprises, Inc. - prime - $12,700.00 est.
    Description of work: erosion
  8. Mike Carlson Enterprises, Inc. - prime - $59,900.00
    Description of work: traffic
  9. Mike Carlson Enterprises, Inc. - prime - $5,000.00
    Description of work: surveying (partial)
  10. Mike Carlson Enterprises, Inc. - prime - $139,952.00
    Description of work: other items

SBE goal: $34,869.42
SBE total: $424,952.00

Veteran-owned business (VOB)

  1. Mt Norway Fabrication - manufacturer/supplier - $9,500.00
    Description of work: other items, fabricate pedestrian handrail
  2. Neptune General Contracting - sub - $6,000.00
    Description of work: install pedestrian handrail

VOB goal: $13,947.77
VOB total: $15,500.00

Second bidder: Taylor's Excavators, Inc.  - rejected 1/4/2023
Bid amount: $998,368.00

Small business enterprise (SBE)

  1. Electric West, Inc. - sub - $62,500.00
    Description of work: electrical (partial)

SBE goal: $49,918.40
SBE total: $62,500.00

Veteran-owned business (VOB)

  1. West Land Use Consultants - sub - $30,000
    Description of work: survey

VOB goal: $19,967.36
VOB total: $30,000.00

Third bidder: Colacurcio Brothers, Inc.  - rejected 1/4/2023
Bid amount: $1,274,931.00

Small business enterprise (SBE)

  1. Dungeness Construction Corp. - sub - $100,000.00
    Description of work: redi-rock wall install

SBE goal: $63,746.55
SBE total: $100,000.00

Veteran-owned business (VOB)

  1. Dungeness Construction Corp. - sub - $97,030.00
    Description of work: redi-rock wall install

VOB goal: $25,498.62
VOB total: $97,030.00

Item no. 2: SR 127, Elmer C. Huntley Snake River Bridge - Deck Rehabilitation

Contract number: 009906
Engineer's estimate: $3,416,089.00
Number of addenda: 0
Number of bidders: 6/2
Award status: pending

Preliminary bid total results

Apparent low: Hamilton Construction Co. - $3,196,208.50
Apparent second: Cascade Bridge, LLC - $3,480,837.00

Verified bid total results

Low bidder: Hamilton Construction Co.
Bid amount: $3,196,208.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $160,405.52
    Description of work: traffic control services

SBE goal: $159,810.43
SBE total: $160,405.52

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $63,989.86
    Description of work: traffic control services

VOB goal: $63,924.17
VOB total: $63,989.86

Second bidder: Cascade Bridge, LLC
Bid amount: $3,480,837.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $176,369.41
    Description of work: project temp. traffic control

SBE goal: $174,041.85
SBE total: $176,369.41

Veteran-owned business (VOB)

  1. Columbia Basin Striping - sub - $17,306.00
    Description of work: striping
  2. Hughes Group, LLC - sub - $60,164.01
    Description of work: traffic control devices & signs

VOB goal: $69,616.74
VOB total: $77,470.01

Item no. 3: SR 270, Bishop Blvd to Idaho State Line - Paving

Contract number: 009904
Engineer's estimate: $4,004,047.34
Number of addenda: 1
Number of bidders: 2/2
Award status: awarded 1/20/2023

Preliminary bid total results

Apparent low: Poe Asphalt Paving, Inc. - $3,225,740.26
Apparent second: Central Washington Asphalt, Inc.- $3,515,115.00

Verified bid total results

Low bidder: Poe Asphalt Paving, Inc.
Bid amount: $3,225,740.26

Subcontractor named

  1. Colvico, Inc.
    Description of work: signal loops

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $432,919.42
    Description of work: flagging, traffic control, temp pavement marking & striping, removal & installations (i.e., temp paint stripes), guide posts, sweeping, sign erection, crack sealing, joint sealing
  2. O'Bunco Engineering, Inc. - sub - $29,265.00
    Description of work: land surveying: gps control, boundary and construction, layout/staking
  3. D & B Landworks and Development, LLC - sub - $22,440.00
    Description of work: hauling services of aggregates and asphalt with the use of dump trucks

DBE goal: $483,861.04
DBE total: $484,624.42

Second bidder: Central Washington Asphalt, Inc.
Bid amount: $3,515,115.00

Subcontractor named

  1. Midland Electric
    Description of work: electrical / illumination 

Disadvantaged business enterprise (DBE) 

  1. Audi Construction, LLC - sub - $24,000.00
    Description of work: the hauling of dirt, grindings and asphalt
  2. O'Bunco Engineering - sub - $29,265.00
    Description of work: land surveying: gps control, construction, layout/staking
  3. West Star Construction of Spokane - sub - $48,000.00
    Description of work: dump truck services
  4. North Star Enterprises, Inc. - sub - $430,054.20
    Description of work: flagging, traffic control, temp pavement marking & striping, removal and installation (i.e. temp paint stripes), guide posts, sign erection, sweeping, crack sealing, joint sealing

DBE goal: $527,267.25
DBE total: $531,319.20

12/14/2022 bid opening - Olympia, WA

Item no. 1: SR 240, SR 225 Intersection – Construct Roundabout

Contract number: 009899
Engineer's estimate: $1,238,879.75
Number of addenda: 0
Number of bidders: 5/3
Award status: awarded 12/28/2022

Preliminary bid total results

Apparent low: Apollo, Inc. - $1,548,195.90
Apparent second: Central Washington Asphalt, Inc. - $1,574,000.00
Apparent third: Granite Construction Company - $1,823,456.96

Verified bid total results

Low bidder: Apparent low: Apollo, Inc.
Bid amount: $1,548,195.90

Subcontractor named

  1. Sierra Electric, Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. Hughes Group - sub - $98,063.40
    Description of work: project temp traffic control

SBE goal: $77,409.80
SBE total: $98,063.40

Veteran-owned business (VOB)

  1. Hughes Group - sub - $31,000.00
    Description of work: automated flagger device

VOB goal: $30,963.92
VOB total: $31,000.00

Second bidder: Central Washington Asphalt, Inc.
Bid amount: $1,574,000.00

Subcontractor named

  1. Sierra Electric, Inc.
    Description of work: electrical/illumination

Small business enterprise (SBE)

  1. O'Bunco Engineering - sub - $2,510.00
    Description of work: (partial) mobilization
  2. O'Bunco Engineering - sub - $16,250.00
    Description of work: roadway surveying
  3. Grady Excavating - sub - $26,000.00
    Description of work: (partial) CSBC (hauling only)
  4. Grady Excavating - sub - $39,000.00
    Description of work: (partial) HMA (hauling only)

SBE goal: $78,000.00
SBE total: $83,760.00

Veteran-owned business (VOB)

  1. Ground Breaker Offroad - sub - $3,067.20
    Description of work: clearing/grubbing
  2. Ground Breaker Offroad - sub - $13,802.40
    Description of work: site excav/grading/sloping
  3. Ground Breaker Offroad - sub - $6,134.40
    Description of work: site embankment
  4. Ground Breaker Offroad - sub - $4,739.58
    Description of work: culvert excav/installation
  5. Ground Breaker Offroad - sub - $5,725.08
    Description of work: wattles
  6. Ground Breaker Offroad - sub - $4,388.26
    Description of work: high visibility fence

VOB goal: $31,480.00
VOB total: $37,856.92

Third bidder: Granite Construction Company
Bid amount: $1,823,456.96

Subcontractor named

  1. Sierra Electrical, Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $100,000.00
    Description of work: traffic control, Cl A signs

SBE goal: $91,172.85
SBE total: $100,000.00

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $40,000.00
    Description of work: traffic control 

VOB goal: $36,469.14
VOB total: $40,000.00

Item no. 2: 2023 Eastern Region Chip Seal - North

Contract number: 009893
Engineer's estimate: $14,651,230.70
Number of addenda: 4
Number of bidders: 3/2
Award status: awarded 1/20/2023

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $16,597,000.00
Apparent second: Granite Construction Company - $22,538,324.50

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $16,597,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $2,705,846.15
    Description of work: flagging, traffic control, temp pavement marking & striping, rumble strips, removal & installations (i.e. temp paint stripes) guide posts, sign erection, sweeping, crack sealing, joint sealing

DBE goal: $2,655,520.00
DBE total: $2,705,846.15

Second bidder: Granite Construction Company
Bid amount: $22,538,324.50

Subcontractor named

  1. Neppel Electric and Controls LLC
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $57,650.00
    Description of work: guardrail construction
  2. North Star Enterprises, Inc. - sub - $2,809,807.00
    Description of work: traffic control, temporary marking installation, rumble strips, guide posts, sweeping (partial p/u broom only), crack sealing and joint seal (partial)
  3. O'Bunco Engineering, Inc. - sub - $8,235.00
    Description of work: survey
  4. A.M.C. Trucking - sub - $240,000.00
    Description of work: dump trucking (partial)
  5. Northern Resource Consulting, LLC - sub - $1,000.00
    Description of work: SPCC plan

DBE goal: $3,606,131.92
DBE total: $3,116,692.00

12/7/2022 bid opening - Olympia, WA

Item no. 1: SR 518, 24th Avenue S Bridge Girder Replacement

Contract number: 009897
Engineer's estimate: $1,515,153.00
Number of addenda: 0
Number of bidders: 7/5
Award status: awarded 12/28/2022

Preliminary bid total results

Apparent low: Kraemer North America, LLC. - $1,283,800.00
Apparent second: Johansen Construction Company, LLC. - $1,601,428.60
Apparent third: Interwest Construction Company - $1,663,816.00

Verified bid total results

Low bidder: Kraemer North America, LLC.
Bid amount: $1,283,800.00

Subcontractor named

  1. Apex Electrical Group LLC
    Description of work: electricial
  2. Rebar International Inc.
    Description of work: rebar installation
  3. Kraemer North America, LLC
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Hughes Group, LLC - sub - $206,631.00
    Description of work: traffic control services
  2. Apex Electrical Group LLC - sub - $29,253.06
    Description of work: electrical
  3. O'Bunco Engineering Inc. - sub - $16,505.00
    Description of work: surveying

DBE goal: $243,922.00
DBE total: $252,389.06

Second bidder: Johansen Construction Company, LLC.
Bid amount: $1,601,428.60

Subcontractor named

  1. Amaya Electric
    Description of work: electrical work
  2. Pacific Steel Group
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC. - sub - $312,000.00
    Description of work: bridge construction

DBE goal: $304,271.43
DBE total: $312,000.00

Third bidder: Interwest Construction Company
Bid amount: $1,663,816.00

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. Rebar International
    Description of work: rebar installation
  3. Interwest Construction, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $348,555.00
  2. Description of work: traffic control services

DBE goal: $316,125.04
DBE total: $348,555.00

Item no. 2: I-5 / I-205, NB Fourth Plain On-Ramp SB 134th St to Mill Plain Ramp Meters

Contract number: 009900
Maximum funds available: $3,510,000.00
Engineer's estimate: $3,241,023.00 
Number of addenda: 1
Number of bidders: 2/2
Award status: awarded 1/5/2023

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $3,704,801.80
Apparent second: Mill Plain Electric, Inc. - $4,668,235.89

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $3,704,801.80

Subcontractor named

  1. Cascade Bridge LLC
    Description of work: rebar installation, structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Mobile Electrical Dist Inc. - supplier - $773,610.00
    Description of work: electrical supplier

DBE goal: $481,624.23
DBE total: $773,610.00

Second bidder: Mill Plain Electric, Inc.
Bid amount: $4,668,235.89

Subcontractor named

  1. Schneider & Sons
    Description of work: reinforcement bar
  2. Precision Fiber
    Description of work: fiber splicing

Disadvantaged business enterprise (DBE) 

  1. Schneider & Son - sub - $592,344.00
    Description of work: reinforcement bar and concrete ramp meter barrier, permanent signing, no trespass signs traffic control
  2. M2 Industrial - sub - $41,760.00
    Description of work: guardrail

DBE goal: $606,870.66
DBE total: $634,104.00

Item no. 3: US 2, Creston to Rocklyn Rd Paving

Contract number: 009898
Engineer's estimate: $4,945,168.08
Number of addenda: 1
Number of bidders: 3/3
Award status: awarded 12/21/2022

Preliminary bid total results

Apparent low: Shamrock Paving, Inc. - $3,795,040.00
Apparent second: Poe Asphalt Paving, Inc. - $3,892,715.75
Apparent third: CPM Development Corporation - $4,448,448.00**

Verified bid total results

Low bidder: Shamrock Paving, Inc.
Bid amount: $3,795,040.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. D&B Landworks and Development, LLC - sub - $24,750.00
    Description of work: hauling services of aggregates and asphalt with the use of dump trucks
  2. O'Bunco Engineering, Inc. - sub - $24,915.00
    Description of work:layout/staking
  3. North Star Enterprises, Inc. - sub - $568,362.00
    Description of work: flagging, traffic control; temp pavement marking; rumble strips; guide posts; sign erection; sweeping; crack sealing; joint sealing

DBE goal: $607,206.40
DBE total: $618,027.00

Second bidder: Poe Asphalt Paving, Inc.
Bid amount: $3,892,715.75

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $24,961.30
    Description of work: traffic control, joint sealing, crack sealing, rumble strips, sweeping, guide posts
  2. O'Bunco Engineering - sub - $37,965.00
    Description of work: surveying
  3. A.M.C. Trucking LLC - sub - $85,329.00
  4. Description of work: dump trucking

DBE goal: $622,934.52
DBE total: $648,255.30

Third bidder: CPM Development Corporation
Bid amount: $4,448,447.99

Subcontractor named

  1. Power City Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. A.M.C. Trucking LLC - sub - $66,000.00
    Description of work: trucking
  2. North Star Enterprises, Inc., DBA North Star Enterprises I Inc. - sub - $621,962.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, removal & installations (i.e., temp, plastic & paint stripes, monuments) guide posts, sweeping, crack sealing, joint seal
  3. O'Bunco Engineering Int'l Inc., DBA O'Bunco Engineering Inc - sub - $24,390.00
  4. Description of work: land surveying: layout/staking

DBE goal: $711,751.68
DBE total: $712,352.00

11/30/2022 bid opening - Olympia, WA

Item no. 1: SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity

Contract number: 009894
Engineer's estimate: $861,157.00
Number of addenda: 0
Number of bidders: 3/2
Award status: awarded 12/13/2022

Preliminary bid total results

Apparent low: SRV Construction, Inc. - $964,956.70
Apparent second: Granite Construction Company - $1,028,738.60

Verified bid total results

Low bidder: SRV Construction, Inc.
Bid amount: **$964,952.70

Disadvantaged business enterprise (DBE) 

  1. Belarde Company - sub - $180,000.00
    Description of work: concrete
  2. Land Development Engineering & Survey - sub - $10,725.00
    Description of work: survey
  3. Electric West - sub - $0.00
    Description of work: electrical

DBE goal: $183,341.01
DBE total: $190,725.00

Second bidder: Granite Construction Company
Bid amount: $1,028,738.60

Disadvantaged business enterprise (DBE) 

  1. Salinas Construction, Inc. - sub - $199,850.00
    Description of work: concrete flatwork

DBE goal: $195,460.33
DBE total: $199,850.00

Item no. 2: US 395, Old Maid Coulee Bridge SB - Deck Rehabilitation

Contract number: 009892
Engineer's estimate: $1,215,259.00
Number of addenda: 1
Number of bidders: 5/4
Award status: awarded 12/22/2022

Preliminary bid total results

Apparent low: Cascade Bridge, LLC - $773,269.00
Apparent second: N.A. Degerstrom, Inc. - $859,721.00
Apparent third: Hamilton Construction Co. - $999,997.50

Verified bid total results

Low bidder: Cascade Bridge, LLC
Bid amount: $773,269.00

Subcontractor named

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $39,240.00
    Description of work: concrete barrier, impact attenuator
  2. Traffic Management, Inc. of Washington - sub - $68,440.00
    Description of work: traffic control, signs, pavement markings
  3. O'Bunco Engineering Int'l, Inc. - sub - $8,495.00
    Description of work: surveying

DBE goal: $115,990.35
DBE total: $116,175.00

Second bidder: N.A. Degerstrom, Inc.
Bid amount: $859,721.00

Subcontractor named

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $39,240.00
    Description of work: temporary barrier/temporary impact attenuators
  2. O'Bunco Engineering Int'l, Inc. - sub - $8,495.00
    Description of work: structure surveying
  3. North Star Enterprises, Inc. - sub - $81,680.00
    Description of work: traffic control and rumble strips

DBE goal: $128,958.15
DBE total: $129,415.00

Third bidder: Hamilton Construction Co.
Bid amount: $999,997.50

Subcontractor named

  1. Hamilton Construction Co.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Northern Resource Consulting, Inc. - sub - $128,000.00
    Description of work: environmental consulting services
  2. Traffic Management, Inc. of Washington - sub - $37,400.00
    Description of work: traffic control services

DBE goal: $149,999.62
DBE total: $165,400.00

Item no. 3: SR 534, Unnamed Tributary to Carpenter Creek Fish Passage

Contract number: 009896
Engineer's estimate: $1,857,201.50
Number of addenda: 1
Number of bidders: 10/1
Award status: awarded 12/13/2022

Preliminary bid total results

Apparent low: Granite Construction Company - $3,468,767.00

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $3,468,767.00

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. Electric West, Inc. - sub - $26,250.00
    Description of work: electrical
  2. Land Development Engineering & Surveying, Inc. - sub - $16,000.00
    Description of work: survey
  3. Lopez Nursery & Landscaping - sub - $80,000.00
    Description of work: landscaping
  4. Magna Construction - sub - $59,500.00
    Description of work: dewatering

SBE goal: $173,438.35
SBE total: $181,750.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $38,800.00
    Description of work: guardrail
  2. Sawtooth Trucking & Excavating, Inc. - sub - $35,000.00
    Description of work: dump truck hauling

VOB goal: $69,375.34
VOB total: $73,800.00

11/16/2022 bid opening - Olympia, WA

Item no. 1: SR 96, North Creek Fish Passage

Contract number: 009885
Engineer's estimate: $3,534,945.00
Number of addenda: 3
Number of bidders: 14/7
Award status: awarded 12/22/2022

Preliminary bid total results

Apparent low: Interwest Construction, Inc. - $3,628,693.45 - rejected 12/20/2022
Apparent second: Northwest Construction, Inc. - $4,249,485.00
Apparent third: MidMountain Contractors, Inc. - $4,419,523.00

Verified bid total results

Low bidder: Interwest Construction, Inc.  - rejected 12/20/2022
Bid amount: $3,628,693.45

Subcontractor named

  1. Interwest Construction, Inc. - self perform
    Description of work: rebar installation
  2. Interwest Construction, Inc. - self perform
    Description of work: structural steel installation

Small business enterprise (SBE)

  1. Subsurface Construction, LLC - sub - $473,400.00
    Description of work: shoring

SBE goal: $181,434,67
SBE total: $473,400.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $76,520.00
    Description of work: guardrail, barrier, impact attenuator

VOB goal: $72,573.87
VOB total: $76,520.00

Second bidder: Northwest Construction, Inc.
Bid amount: $4,249,485.00

Subcontractor named

  1. Zemek Construction
    Description of work: rebar installation

Small business enterprise (SBE)

  1. M2 Industrial - sub - $76,520.00
    Description of work: guardrail
  2. Seattle Sweeping - sub - $10,000.00
    Description of work: street cleaning (partial)
  3. JJH Earthworks - sub - $22,638.64
    Description of work: clear & grub, herbicide
  4. JJH Earthworks - sub - $236,272.89
    Description of work: stream construction
  5. JJH Earthworks - sub - $1,294.52
    Description of work: rock for erosion & scour
  6. JJH Earthworks - sub - $28,386.90
    Description of work: LWM installation
  7. JJH Earthworks - sub - $13,291.68
    Description of work: brush pile

SBE goal: $212,474.25
SBE total: $301,884.63

Veteran-owned business (VOB)

  1. None proposed
    Description of work: none proposed

VOB goal: $84,989.7‬0
VOB total: $86,520.00

Third bidder: MidMountain Contractors, Inc.
Bid amount: $4,419,523.00

Subcontractor named

  1. Grizzly Bar and Post Tensioning, Inc.
    Description of work: rebar installation

Small business enterprise (SBE)

  1. JJH Earthworks - sub - $253,023.81
    Description of work: stream construction
  2. Northwest Asphalt - sub - $69,034.95
    Description of work: asphalt paving
  3. Grizzly Bar & PTI - sub - $15,650.00
    Description of work: rebar installation

SBE goal: $220,976.15
SBE total: $248,708.76

Veteran-owned business (VOB)

  1. None proposed
    Description of work: none proposed

VOB goal: $88,390.46‬
VOB total: $89,000.00

Item no. 2: US 101, Leland Creek and Unnamed Tribs – Remove Fish Barriers

Contract number: 009882
Engineer's estimate: $9,867,465.17
Number of addenda: 4
Number of bidders: 13/4
Award status: pending

Preliminary bid total results

Apparent low: SB Structures, LLC - $9,047,047.47
Apparent second: Interwest Construction, Inc. - $9,876,543.21
Apparent third: Kraemer North America, LLC - $10,886,500.00

Verified bid total results

Low bidder: SB Structures, LLC
Bid amount: $9,047,047.46**

Subcontractor named

  1. ADP Construction Services, Inc.
    Description of work: electrical
  2. PNW Reinforcing Inc.
    Description of work: rebar installation
  3. SB Structures, LLC - self perform
    Description of work: SB Structures, LLC

Disadvantaged business enterprise (DBE) 

  1. PNW Reinforcing, Inc. - sub - $407,820.00
    Description of work: installation, placing and tying reinforcing steel
  2. C&R Tractor & Landscape, Inc. - sub - $69,146.00
    Description of work: landscape and environmental related work
  3. ADP Construction Services, Inc. - sub - $204,500.00
    Description of work: electrical
  4. MNG Construction, LLC - sub - $718,020.00
    Description of work: culvert construction
  5. John-Wayne Construction Company - sub - $96,500.00
    Description of work: concrete slip-form barrier

DBE goal: $1,447,527.60
DBE total: $1,495,986.00

Second bidder: Interwest Construction, Inc.
Bid amount: $9,876,543.21

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation
  3. Condon-Johnson & Associates, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering, Inc. - sub - $175,050.00
    Description of work: surveying
  2. PNW Reinforcing, Inc. - sub - $431,974.00
    Description of work: rebar installation
  3. Advanced Government Services, Inc. - sub - $591,159.00
    Description of work: traffic control services
  4. Electric West, Inc. - sub - $95,350.00
    Description of work: electrical
  5. M2 Industrial, Inc. - sub - $301,938.00
    Description of work: guardrail, barrier, impact attenuator

DBE goal: $1,580,246.91
DBE total: $1,595,471.00

Third bidder: Kraemer North America, LLC
Bid amount: $10,886,500.00

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. Pacific Steel Group
    Description of work: rebar installation
  3. Kraemer North America, LLC
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. MNG Construction, LLC - sub - $1,476,000.00
    Description of work: excavation and culvert construction
  2. O'Bunco Engineering, Inc. - sub - $175,050.00
    Description of work: surveying
  3. C&R Tractor & Landscape, Inc. - sub - $69,146.00
    Description of work: landscaping
  4. Electric West, Inc. - sub - $95,350.00
    Description of work: electrical

DBE goal: $1,741,840‬.00
DBE total: $1,815,546.00

11/09/2022 bid opening - Olympia, WA

Item no. 1: US 2, Colbert Rd Intersection Revision

Contract number: XE3403
Engineer's estimate: $1,349,533.35
Number of addenda: 2
Number of bidders: 7/4
Award status: pending

Preliminary bid total results

Apparent low: Halme Construction Inc. - $1,332,858.00
Apparent second: LaRiviere, Inc. - $1,403,501.30
Apparent third: N.A. Degerstrom, Inc. - $1,532,263.00

Verified bid total results

Low bidder: Halme Construction Inc.
Bid amount: $1,332,858.00

Subcontractor named

  1. None proposed
    Description of work: None proposed

Disadvantaged business enterprise (DBE) 

  1. D and B Landworks and Development - sub - $70,125.00
    Description of work: haul aggregates and disposal
  2. Northern Resource Consulting, Inc. - sub - $80,004.85
    Description of work: CESCL inspection, erosion control & water poll. prevention, seed fertilize and mulch, medium compost, high visibility fence, SPCC
  3. North Star Enterprises - sub - $61,090.00
    Description of work: traffic control
  4. O'Bunco Engineering - sub - $31,180.00
    Description of work: surveying

DBE goal: $226,539.45
DBE total: $242,399.85

Second bidder: LaRiviere, Inc.
Bid amount: $1,403,501.30

Subcontractor named

  1. Power City Electric
    Description of work: electrical
  2. LaRiviere, Inc. - self perform
    Description of work: structural steel installation
  3. LaRiviere, Inc. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Gilbert Patterson Concrete - sub - $95,800.00
    Description of work: concrete
  2. O'Bunco Engineering - sub - $19,270.00
    Description of work: survey
  3. Northwest Traffic Control - sub - 75,569.45
    Description of work: traffic control
  4. North Fork Enterprises - sub - $68,032.00
    Description of work: pipe

DBE goal: $238,595.22
DBE total: $258,671.45

Third bidder: N.A. Degerstrom, Inc.
Bid amount: $1,532,263.00

Subcontractor named

  1. Neppel Electric & Controls, LLC 
    Description of work: electrical for illumination system

Disadvantaged business enterprise (DBE) 

  1. Neppel Electric & Controls, LLC - sub - $327,000.00
    Description of work: illumination system

DBE goal: $260,484.71
DBE total: $327,000.00

Item no. 2: SR 970, Teanaway River - CED Retrofit

Contract number: 009889
Engineer's estimate: $1,632,487.00
Number of addenda: 2
Number of bidders: 11/7
Award status: awarded 12/2/2022

Preliminary bid total results

Apparent low: Scarsella Bros., Inc. - $1,367,949.25
Apparent second: Graham Contracting, Ltd. - $1,427,826.00
Apparent third: Interwest Construction, Inc. - $1,566,941.50

Verified bid total results

Low bidder: Scarsella Bros., Inc.
Bid amount: $1,367,949.25

Subcontractor named

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial - sub - $80,055.00
    Description of work: guardrail and temporary barrier
  2. Green City, Inc. - sub - $94,730.00
    Description of work: landscaping
  3. O'Bunco Engineering - sub - $17,370.00
    Description of work: surveying

DBE goal: $191,512.90
DBE total: $192,155.00

Second bidder: Graham Contracting, Ltd.
Bid amount: $1,427,826.00

Subcontractor named

  1. Graham Contracting, Ltd. - self perform
    Description of work: structural steel installation
  2. Graham Contracting, Ltd. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering Int'l - sub - $16,000.00
    Description of work: construction and roadway survey
  2. Daramola, Inc. - sub - $110,000.
    Description of work: landscaping services
  3. M2 Industrial, Inc. - $78,000.00
    Description of work: temporary barrier, temporary impact attenuator, guardrail, fence

DBE goal: $199,895.64
DBE total: $204,000.00

Third bidder: Interwest Construction, Inc.
Bid amount: $1,566,941.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Daramola, Inc. - sub - $114,300.00
    Description of work: landscape construction
  2. M2 Industrial, Inc. - sub - $82,655.00
    Description of work: fencing, guardrail, concrete barriers
  3. O'Bunco Engineering Int'l, Inc. - sub - $17,370.00
    Description of work: land surveying
  4. The Bag Lady, Inc. - sub - $10,372.00
    Description of work: erosion control

DBE goal: $219,371.81
DBE total: $224,697.00

Item no. 3: SR 28, White Trail Rd Roundabout

Contract number: XE3402
Engineer's estimate: $2,397,729.95
Number of addenda: 2
Number of bidders: 10/7
Award status: awarded 12/2/2022

Preliminary bid total results

Apparent low: Johansen Construction Company, LLC - $1,819,997.52
Apparent second: Granite Construction Company - $2,249,800.51
Apparent third: LaRiviere, Inc. - $2,256,605.32

Verified bid total results

Low bidder: Johansen Construction Company, LLC
Bid amount: $1,819,997.52

Subcontractor named

  1. Midland Electric, Inc.
    Description of work: electrical
  2. Highmark Concrete Contractors, LLC.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC. - sub - $275,000.00
    Description of work: concrete flatwork

DBE goal: $272,999.62
DBE total: $275,000.00

Second bidder: Granite Construction Company
Bid amount: $2,249,800.51

Subcontractor named

  1. Highmark Concrete Contractors, LLC. 
    Description of work: rebar installation
  2. Midland Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC.  - sub - $338,000.00
    Description of work: concrete flatwork

DBE goal: $337,470.08
DBE total: $338,000.00

Third bidder: LaRiviere, Inc.
Bid amount: $2,256,605.32

Subcontractor named

  1. Midland Electric
    Description of work: electrical
  2. LaRiviere, Inc. - self perform
    Description of work: structural steel installation
  3. LaRiviere, Inc. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering - sub - $74,160.00
    Description of work: survey
  2. Northwest Traffic Control - sub - $264,847.40
    Description of work: traffic control

DBE goal: $338,490.80
DBE total: $339,007.40

11/02/2022 bid opening - Olympia, WA

Item no. 1: SR 167, Southbound UP RR Bridge Deck Overlay

Contract number: 009887
Engineer's estimate: $2,100,794.00
Number of addenda: 1
Number of bidders: 4/2
Award status: awarded 11/16/2022

Preliminary bid total results

Apparent low: Combined Construction, Inc. - $2,320,874.00
Apparent second: C.A. Carey Corporation - $2,844,161.00

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $2,320,874.00

Subcontractor named

  1. Combined Construction, Inc. - self perform
    Description of work: structural steel installation
  2. Combined Construction, Inc. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $164,315.00
    Description of work: traffic control
  2. Construction Ahead dba Pavement Surface Control - sub - $293,275.00
    Description of work: barrier
  3. O'Bunco Engineering - sub - $8,565.00
    Description of work: surveying

DBE goal: $464,174.80
DBE total: $466,155.00

Second bidder: C.A. Carey Corporation
Bid amount: $2,844,161.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Protech Coatings - sub - $300,000.00
    Description of work: concrete overlay
  2. ATS Traffic Control - sub - $320,000.00
    Description of work: traffic control

DBE goal: $568,832.20
DBE total: $620,000.00

Item no. 2: I-5, Smokey Point NB/SB Safety Rest Area - RV Sewage System Rehab

Contract number: 009886
Engineer's estimate: $367,847.70
Number of addenda: 2
Number of bidders: 8/3
Award status: awarded 11/17/2022

Preliminary bid total results

Apparent low: Accord Contractors LLC - $326,869.00
Apparent second: SRV Construction, Inc. - $669,971.00
Apparent third: Northwest Cascade, Inc. - $693,000.00  - rejected 11/17/2022

Verified bid total results

Low bidder: Accord Contractors LLC
Bid amount: $326,869.00

Small business enterprise (SBE)

  1. Accord Contractors LLC - GC/sub - $220,000.00
    Description of work: demo, excavate, backfill, pipe install

SBE goal: $16,343.45
SBE total: $220,000.00

Veteran-owned business (VOB)

  1. None proposed
    Description of work: none proposed

VOB goal: $6,537.38
VOB total: $6,600.00

Second bidder: SRV Construction, Inc.
Bid amount: $669,971.00

Small business enterprise (SBE)

  1. Magna Services - sub - $35,000.00
    Description of work: dewatering

SBE goal: $33,498.55
SBE total: $35,000.00

Veteran-owned business (VOB)

  1. HWWT LLC - sub - $13,400.00
    Description of work: fill tanks w/water for backfill

VOB goal: $13,399.42
VOB total: $13,400.00

Third bidder: Northwest Cascade, Inc. - rejected 11/17/2022
Bid amount: $693,000.00

Small business enterprise (SBE)

  1. Becker Blacktop - sub - $15,000.00
    Description of work: paving
  2. HCON, Inc. - sub - $19,750.00
    Description of work: trucking

SBE goal: $34,650.00
SBE total: $34,750.00

Veteran-owned business (VOB)

  1. HCON, Inc. - sub - $19,750.00
    Description of work: trucking

VOB goal: $13,860.00
VOB total: $19,750.00

10/26/2022 bid opening - Olympia, WA

Item no. 1: OR Breakaway Cable Terminal Replacement - Freeways

Contract number: 009884
Engineer's estimate: $527,710.00
Number of addenda: 1
Number of bidders: 4/4
Award status: awarded 11/9/2022

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $537,386.00
Apparent second: Dirt and Aggregate Interchange, Inc. - $572,572.00
Apparent third: Coral Construction Company - $688,888.00

Verified bid total results

Low bidder: Massana Construction, Inc.
Bid amount: $537,386.00

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $240.433.00
    Description of work: guardrail construction of all types

DBE goal: $96,729.48
DBE total: $240.433.00

Second bidder: Dirt and Aggregate Interchange, Inc.
Bid amount: $572,572.00

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC DBA Budiman Construction - sub - $105,721.20
    Description of work: flagging and traffic control management

DBE goal: $103,062.96
DBE total: $105,721.20

Third bidder: Coral Construction Company
Bid amount: $688,888.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $124,000.00
    Description of work: flagging (i.e. traffic control) services

DBE goal: $123,999.84
DBE total: $124,000.00

Item no. 2: US 101, Aberdeen / Westport – Signals and ADA

Contract number: 009881
Engineer's estimate: $868,372.98
Number of addenda: 1
Number of bidders: 5/2
Award status: awarded 11/18/2022

Preliminary bid total results

Apparent low: Rognlin's, Inc. - $1,105,503.84 - rejected 11/9/2022
Apparent second: Quigg Bros., Inc. - $1,301,878.00

Verified bid total results

Low bidder: Rognlin's, Inc. rejected 11/9/2022
Bid amount: $1,105,503.84

Small business enterprise (SBE)

  1. Highmark Concrete Contractors, LLC - sub - $55,500.00
    Description of work: flatwork concrete

SBE goal: $55,275.20
SBE total: $55,500.00

Veteran-owned business (VOB)

  1. Maben Trucking & Excavating - sub - $22,200.00
    Description of work: dump trucking

VOB goal: $22,110.08
VOB total: $22,200.00

Second bidder: Quigg Bros., Inc.
Bid amount: $1,301,878.00

Small business enterprise (SBE)

  1. The Traffic Control Company, Inc. - sub - $75,000.00
    Description of work: traffic control

SBE goal: $65,093.90
SBE total: $75,000.00

Veteran-owned business (VOB)

  1. Skillings - sub - $26,500.00
    Description of work: surveying

VOB goal: $26,037.56
VOB total: $26,500.00

10/19/2022 bid opening - Olympia, WA

Item no. 1: SR 900, 68th Ave S Vicinity Pedestrian Safety – Phase 2

Contract number: 009880
Engineer's estimate: $652,595.00
Number of addenda: 1
Number of bidders: 7/4
Award status: awarded 11/1/2022

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $704,589.95
Apparent second: Laser Underground & Earthworks, Inc. - $876,553.00 - rejected 11/1/2022
Apparent third: Active Construction, Inc. - $1,049,049.00

Verified bid total results

Low bidder: Massana Construction, Inc.
Bid amount: $704,589.95

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $5,500.00
    Description of work: guardrail
  2. G&G, Inc. - sub - $45,000.00
    Description of work: electrical
  3. Salinas Construction, Inc. - sub - $78,929.00
    Description of work: concrete curb & gutter, sidewalks, driveway entrance

DBE goal: $126,826.19
DBE total: $129,429.00

Second bidder: Laser Underground & Earthworks, Inc.  - rejected 11/1/2022
Bid amount: $876,553.00

Disadvantaged business enterprise (DBE) 

  1. Salinas Construction - sub - $103,077.00
    Description of work: concrete sidewalk and curb removal, install concrete sidewalk, curb and gutter, curb ramp and detect surface
  2. M2 Industrial - sub - $27,496.00
    Description of work: remove and install guardrailing
  3. WE Coates Surveying - sub - $12,000.00
    Description of work: survey
  4. AAR Testing and Inspection, Inc. - sub - $15,207.00
    Description of work: special inspection, compaction and material testing

DBE goal: $157,779.54
DBE total: $157,780.00

Third bidder: Active Construction, Inc.
Bid amount: $1,049,049.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $125,000.00
    Description of work: traffic control services
  2. M2 Industrial - sub - $27,496.00
    Description of work: guardrail
  3. G&G, Inc. - sub - $45,000.00
    Description of work: electrical

DBE goal: $188,828.82
DBE total: $197,496.00

Item no. 2: SR 20 Spur, Anacortes Ferry Terminal Tollbooth Replacement

Contract number: 009873
Engineer's estimate: $2,807,365.10
Number of addenda: 4
Number of bidders: 3/2
Award status: awarded 11/7/2022

Preliminary bid total results

Apparent low: Imco General Construction, Inc. - $3,100,184.80
Apparent second: Tiger Construction, Ltd. - $3,699,058.94 - rejected 11/7/2022

Verified bid total results

Low bidder: Imco General Construction, Inc.
Bid amount: $3,100,184.80

Subcontractor named

  1. Harris Company
    Description of work: heating, ventilation & air conditioning
  2. Harris Company
    Description of work: plumbing
  3. Elcon Corporation
    Description of work: electrical
  4. Shamrock Construction
    Description of work: structural steel installation
  5. Pacific Steel Group
    Description of work: reinforcing steel/rebar installation

Small business enterprise (SBE)

  1. Shamrock Construction - sub - $27,100.00
    Description of work: partial - tollbooth 01, 02, 03, structural steel
  2. Wilson Engineering - sub - $4,335.00
    Description of work:  structure survey - complete
  3. Wilson Engineering - sub - $4,231.00
    Description of work: roadway survey - complete
  4. Wilson Engineering - sub - $3,354.00
    Description of work: ADA features survey - complete
  5. ATS Traffic Control, LLC - sub - $9,000.00
    Description of work: partial - mobilization
  6. ATS Traffic Control, LLC - sub - $113,300.00
    Description of work: traffic control - complete

SBE goal: $155,009.24
SBE total: $161,320.00

Veteran-owned business (VOB)

  1. Shamrock Construction - sub - $96,400.00
    Description of work: partial - canopy structural steel

VOB goal: $62,003.70
VOB total: $96,400.00

Second bidder: Tiger Construction, LTD.  - rejected 11/7/2022
Bid amount: $3,699,058.94

Subcontractor named

  1. Harris
    Description of work: HVAC
  2. Harris
    Description of work: plumbing
  3. Valley Electric
    Description of work: electrical
  4. Shamrock Construction
    Description of work: structural steel installation
  5. Tiger Construction, LTD.
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Morse Steel Reinforcing - manufacturer - $21,345.00
    Description of work: supply reinforcing steel
  2. Hughes Group - sub - $153,819.10
    Description of work: traffic control
  3. Siteline Contractor Surveys - sub - $16,400.00
    Description of work: survey

SBE goal: $184,952.95
SBE total: $191,564.10

Veteran-owned business (VOB)

  1. Shamrock Construction - sub - $123,500.00
  2. Description of work: S/I structural steel

VOB goal: $73,981.18
VOB total: $123,500.00

10/12/2022 bid opening - Olympia, WA

Item no. 1: SR 516, Barnes Creek Fish Passage

Contract number: 009872
Engineer's estimate: $2,331,283.08
Number of addenda: 3
Number of bidders: 13/6
Award status: awarded 10/24/2022

Preliminary bid total results

Apparent low: Active Construction, Inc. - $2,378,378.00
Apparent second: Marshbank Construction, Inc. - $2,473,775.50
Apparent third: Tucci & Sons, Inc. - $2,599,186.50

Verified bid total results

Low bidder: Active Construction, Inc.
Bid amount: $2,378,378.00

Subcontractor named

  1. West Coast Signal
    Description of work: electrical 
  2. ACI
    Description of work: structural steel
  3. ACI
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. Daramola - sub - $102,809.00
    Description of work: landscaping
  2. AAA Contractors - sub - $119,955.00
    Description of work: dump trucking
  3. AAA Contractors - sub - $51,669.00
    Description of work: asphalt paving/grinding
  4. Burley Products - sub - $27,524.90
    Description of work: railing
  5. Advanced Government Services - sub - $176,559.00
    Description of work: traffic control services
  6. M2 Industrial - sub - $25,250.00
    Description of work: guardrail

DBE goal: $499,459.38
DBE total: $503,766.90

Second bidder: Marshbank Construction, Inc.
Bid amount: $2,473,775.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Marshbank Construction, Inc. - prime - $619,000.00
    Description of work: grading and placement of crushed surfacing base & top course for highway/road/street/bridges or airport runway. Asphalt & concrete patching. Construction of stormwater/watermain/utility lines/sewer, hydrants, catch basins, bioswsale, pipes, detention vaults and retention ponds, manhole adjustment to grade, underground electrical & comms and conduit. Earth retention systems, riprap and anchored retaining wall. Channel, cribbing, trail, embankment and gabion construction, dump truck hauling of contaminated non-hazardous material, gravel & top soil, vactoring truck.

DBE goal: $519,492.86
DBE total: $619,000.00

Third bidder: Tucci & Sons, Inc.
Bid amount: $2,599,186.50

Subcontractor named

  1. H2 Precast
    Description of work: rebar 

Disadvantaged business enterprise (DBE) 

  1. Magna - sub - $98,500.00
    Description of work: dewatering
  2. O'Bunco Engineering International - sub - $18,490.00
    Description of work: land surveying
  3. Daramola - sub - $98,829.00
    Description of work: landscape construction
  4. Advanced Government Services - sub - $187,000.00
    Description of work: traffic control
  5. Michaelis Trucking & Excavating - sub - $40,000.00
    Description of work: dump trucking
  6. Tunista Construction - sub - $70,000.00
    Description of work: dump trucking
  7. M2 Industrial - sub - $25,250.00
    Description of work: guardrail
  8. The Bag Lady - sub - $9,358.50
    Description of work: erosion control

DBE goal: $545,829.17
DBE total: $547,427.50

9/28/2022 bid opening - Olympia, WA

Item no. 1: SR 411, Cowlitz River Bridge Replace Bridge Deck

Contract number: 009870
Engineer's estimate: $5,345,861.00
Number of addenda: 3
Number of bidders: 14/3
Award status: awarded 10/10/2022

Preliminary bid total results

Apparent low: Hamilton Construction Co. - $8,150,343.90
Apparent second: Stellar J Corporation - $8,256,328.00
Apparent third: Max J. Kuney Company - $11,264,688.72

Verified bid total results

Low bidder: Hamilton Construction Co.
Bid amount: $8,150,343.90

Subcontractor named

  1. Hamilton Construction Co
    Description of work: structural steel installation
  2. Western Rebar Consulting Inc., DBA Western Rebar Consulting Inc./Western Industries Inc.
    Description of work: rebar installation
  3. City Electric Co.
    Description of work: electrical 

Disadvantaged business enterprise (DBE)

  1. John-Wayne Construction Company - sub - $451,880.00
    Description of work: concrete pouring
  2. The Traffic Control Co., Inc. - sub - $352,100.00
    Description of work: traffic control services
  3. Western Rebar Consulting Inc., DBA Western Rebar Consulting, Inc./Western Industries Inc. - sub - $539,710.00
    Description of work: rebar
  4. O'Bunco Engineering Int'l, Inc., DBA O'Bunco - sub - $67,560.00
    Description of work: construction surveying
  5. Burly Products, Inc., DBA JR Construction JR - sub - $122,157.00
    Description of work: bridge construction
  6. Meko Construction, Inc. - sub - $21,763.00
    Description of work: concrete pumping

DBE goal: $1,548,565.34
DBE total: $1,555,170.00

Second bidder: Stellar J Corporation
Bid amount: $8,256,328.00

Subcontractor named

  1. Stellar J Corporation
    Description of work: HVAC
  2. Stellar J Corporation
    Description of work: plumbing
  3. Schneider & Son
    Description of work: electrical
  4. Stellar J Corporation
    Description of work: structural steel
  5. Western Rebar Consulting Inc.
    Description of work: rebar

Disadvantaged Business Enterprise (DBE)

  1. Pacific Rim Service and Construction Co., Inc. - sub - $13,891.00
    Description of work: guardrail construction
  2. NW Construction General Contracting, Inc. - sub - $23,527.00
    Description of work: dump trucking
  3. O'Bunco Engineering - sub - $67,560.00
    Description of work: construction staking
  4. John-Wayne Construction Co. - sub - $447,380.00
    Description of work: concrete barrier & slip form
  5. Western Rebar Consulting, Inc. - sub - $523,200.00
    Description of work: rebar contractor
  6. Schneider & Son - sub - $132,759.00
    Description of work: electric contracting, electrical conduit
  7. The Traffic Control Co., Inc. - sub - $248,739.00
    Description of work: flagging, TCS and traffic control services
  8. Burly Products, Inc. - sub - $122,000.00
    Description of work: fabrication and installation of metal railing

DBE goal: $1,568,702.32
DBE total: $1,579,056.00

Third bidder: Max J. Kuney Company
Bid amount: $11,264,688.72

Subcontractor named

  1. Schneider & Son, Inc.
    Description of work: electrical
  2. Pacific Northwest Reinforcing, Inc.
    Description of work: rebar installation

Disadvantaged Business Enterprise (DBE)

  1. Schneider & Son, Inc. - sub - $185,935.80
    Description of work: electric contracting and construction management for highway, road, street and bridge
  2. PNW Reinforcing, Inc. - sub - $654,638.00
    Description of work: installation, placing and tying reinforcing steel
  3. Structural Coatings, Inc. - sub - $736,450.00
    Description of work: scaffold erecting and dismantling
  4. O'Bunco Engineering, Inc. - sub - $67,560.00
    Description of work: land surveying: GPS control, boundary and construction, layout/staking
  5. Meko Construction, Inc. - sub - $22,160.00
    Description of work: concrete pumping 
  6. John-Wayne Construction Company - sub - $484,438.77
    Description of work: concrete barrier & slip form with metal/wood railings

DBE goal: $2,140,290.86
DBE total: $2,151,182.57

9/21/2022 bid opening - Olympia, WA

Item no. 1: I-90, Vantage - Upgrade ITS Components

Contract number: 009868
Engineer's estimate: $1,110,839.00
Number of addenda: 2
Number of bidders: 5/3
Award status: awarded 9/29/2022

Preliminary bid total results

Apparent low: Mill Plain Electric, Inc. - $925,646.00
Apparent second: Northeast Electric, LLC - $1,132,559.00
Apparent third: Colvico, Inc. - $1,734,000.00

Verified bid total results

Low bidder: Mill Plain Electric, Inc.
Bid amount: $925,646.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE)

  1. Advanced Government Services - sub - $130,000.00
    Description of work: traffic control

DBE goal: $120,333.98
DBE total: $130,000.00

Second bidder: Northeast Electric, LLC
Bid amount: $1,132,559.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged Business Enterprise (DBE)

  1. North Star Enterprise - sub - $105,000.00
    Description of work: temporary traffic control
  2. M2 Industrial, Inc. - sub - $46,350.00
    Description of work: guardrails

DBE goal: $147,232.67
DBE total: $151,350.00

Third bidder: Colvico, Inc.
Bid amount: $1,734,000.00

Subcontractor named

  1. REV Drilling, Inc.
    Description of work: cantilever foundations and rock dowel

Disadvantaged Business Enterprise (DBE)

  1. North Star Enterprise - sub - $182,000.00
    Description of work: traffic control
  2. M2 Industrial, Inc. - sub - $44,000.00
    Description of work: guardrail

DBE goal: $225,420.00
DBE total: $226,000.00

9/14/2022 bid opening - Olympia, WA

Item no. 1: SR 19 Et Al, East Jefferson County Remove Fish Barriers

Contract number: 009862
Engineer's estimate: $7,664,949.00
Number of addenda: 2
Number of bidders: 11/7
Award status: awarded 9/30/2022

Preliminary bid total results 

Apparent low: Seton Construction, Inc. - $7,974,933.00
Apparent 2nd: Pivetta Brothers Construction, Inc - $8,525,189.90
Apparent 3rd: Johansen Construction Company - $8,576,455.85 - rejected 9/30/2022

Verified bid total results

Low bidder: Seton Construction, Inc.
Bid amount: $7,974,933.00

Subcontractor named

  1. Peterson Rebar Placement LLC
    Description of work: rebar installation
  2. Olympic Electric Company, Inc.
    Description of work: electrical
  3. Seton Construction, Inc.
    Description of work: structural steel installation self-perform

Disadvantaged Business Enterprise (DBE)

  1. MNG Construction, LLC - sub - $1,230,000.00
    Description of work: partial contractor designed buried structure No. 2, furnish & installation of culvert
  2. M2 Industrial - sub - $217,7880.00
    Description of work: guardrail installation, temp barrier
  3. Obunco Engineeering - sub - $70,735.00
    Description of work: surveying

DBE goal: $1,355,738.61
DBE total: $1,518,515.00

Second bidder: Pivetta Brothers Construction, Inc
Bid amount: $8,525,189.90

Subcontractor Named

  1. Stetner Construction Group
    Description of work: electrical
  2. LII Engineering & Construction LLC
    Description of work: structural steel installation

Disadvantaged Business Enterprise (DBE)

  1. Magna Services - sub - $110,000.00
    Description of work: dewatering
  2. Daramola - sub - $405,144.11
    Description of work: landscaping
  3. O'bunco Engineering - sub - $70,736.00
    Description of work: survey
  4. Advanced Government Services - sub - $350,000.00
    Description of work: traffic control services
  5. Michaelis Trucking & Excavating - sub - $530,000.00
    Description of work: trucking

DBE goal: $1,449,282.28
DBE total: $1,465,880.11

Third bidder: Johansen Construction Company - rejected 9/30/2022
Bid amount: $8,576,455.85

Subcontractor Named

  1. Stetner Construction Group
    Description of work: electrical work

Disadvantaged Business Enterprise (DBE)

  1. Highmark Concrete Contractors, LLC - sub - $1,459,000.00
    Description of work: partial - supply & install precast structures

9/8/2022 bid opening - Olympia, WA

Item no. 1: SR 106, Twanoh Creek - Remove Fish Barrier

Contract number: 009867
Engineer's estimate: $1,971,118.92
Number of addenda: 1
Number of bidders: 11/4
Award status: awarded 9/22/2022

Preliminary bid total results 

Apparent low: R-V Associates, Inc. - $1,172,092.00 **
Apparent 2nd: Oma Construction, Inc. - $1,785,949.00
Apparent 3rd: Tucci & Sons, Inc. - $1,935,563.00 - rejected 9/20/2022

Verified bid total results

Low bidder: Oma Construction, Inc.
Bid amount: $1,785,949.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. WE Coates - sub - $34,000.00
    Description of work: survey 
  2. M2 Industrial, Inc. - sub - $53,176.00
    Description of work: guardrail installation
  3. The Bag Lady, Inc. - sub - $7,827.40
    Description of work: silt fence, constr. fence

SBE goal: $89,297.45
SBE total: $95,003.40

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $38,000.00
    Description of work: guardrail installation

VOB goal: $35,718.98
VOB total: $38,000.00

2nd bidder: Tucci & Sons, Inc.  - rejected 9/20/2022
Bid amount: $1,935,563.00

Subcontractor named

  1. Old Castle Precast
    Description of work: rebar
  2. M2 Industrial, Inc.
    Description of work: structural steel

Small business enterprise (SBE)

  1. M2 Industrial, Inc. - sub - $50,000.00
    Description of work: guardrail
  2. The Bag Lady, Inc. - sub - $7,800.00
    Description of work: erosion control 
  3. Tunista Construction Company - sub - $15,960.00
    Description of work: trucking
  4. O'Bunco Engineering - sub - $29,000.00
    Description of work: survey

SBE goal: $96,778.15
SBE total: $102,760.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $41,000.00
    Description of work: 

VOB goal: $38,711.26
VOB total: $41,000.00

3rd bidder: R-V Associates, Inc. **
Bid amount: $1,972,092.00

Subcontractor named

  1. Transportation Systems, Inc.
    Description of work: electrical, conduit for electrical

Small business enterprise (SBE)

  1. Yamamoto Landscaping, Inc. - sub - $80,000.00
    Description of work: stream material installation
  2. Yamamoto Landscaping, Inc. - sub - $18,000.00
    Description of work: bark, topsoil, compost installation
  3. Yamamoto Landscaping, Inc. - sub - $2,000.00
    Description of work: mulch installation
  4. Yamamoto Landscaping, Inc. - sub - $12,500.00
    Description of work: clean up
  5. O'Bunco Engineering, Inc. - survey/staking - $35,000.00
    Description of work: survey

SBE goal: $98,604.60
SBE total: $147,500.00

Veteran-owned business (VOB)

  1. Maben Trucking - trucking/hauling - $50,000.00
    Description of work: trucking, hauling

VOB goal: $39,441.84
VOB total: $50,000.00

8/31/2022 bid opening - Olympia, WA

Item no. 1: SR 104, Hood Canal Bridge, Replace Pontoon Hatches - Phase 2

Contract number: 009863
Engineer's estimate: $4,213,504.00
Number of addenda: 1
Number of bidders: 7/4
Award status: awarded 9/20/2022

Preliminary bid total results 

Apparent low: Interwest Construction, Inc. - $2,818,929.00 - rejected 9/12/2022
Apparent 2nd: Shimmick Construction Company, Inc. - $2,951,529.00
Apparent 3rd: Triton Marine Construction, Corp. - $2,999,986.00  - rejected 9/12/2022

Verified bid total results

Low bidder: Interwest Construction, Inc.  - rejected 9/12/2022
Bid amount: $2,818,929.00

Subcontractor named

  1. Interwest Construction, Inc. - self perform
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Mason Corporation dba Mason Coatings - sub - $49,740.00
    Description of work: painting

DBE goal: $479,217.93
DBE total: $49,740.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

2nd bidder: Shimmick Construction Company, Inc. 
Bid amount: $2,951,529.00

Subcontractor named

  1. Shimmick Construction Company, Inc. - self perform
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Sunset Company, LLC - sub - $550,000.00
    Description of work: remove old hatches; furnish and install hatches (partial)

DBE goal: $501,759.93
DBE total: $550,000.00

3rd bidder: Triton Marine Construction, Corp.  - rejected 9/12/2022
Bid amount: $2,999,986.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. RM Pioneer Services - sub - $50,120.00
    Description of work: water service for testing 

DBE goal: $509,997.62
DBE total: $50,120.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

Item no. 2: US 2, Strategic Concrete Bridge Deck Preservation

Contract number: 009864
Engineer's estimate: $3,326,944.55
Number of addenda: 1
Number of bidders: 5/4
Award status: awarded 9/19/2022

Preliminary bid total results 

Apparent low: Combined Construction, Inc. - $3,127,153.00
Apparent 2nd: Midmountain Contractors, Inc. - $3,327,763.00  - rejected 9/12/2022
Apparent 3rd: Massana Construction, Inc. - $3,480,038.00

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $3,127,153.00

Subcontractor named

  1. Combined Construction, Inc. - self perform
    Description of work: structural steel installation, rebar installation 

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $640,000.00
    Description of work: traffic control

DBE goal: $625,430.60
DBE total: $640,000.00

2nd bidder: Midmountain Contractors, Inc.  - rejected 9/12/2022
Bid amount: $3,327,763.00

Subcontractor named

  1. Midmountain Contractors, Inc. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Traffic Control - sub - $670,000.00
    Description of work: traffic control

DBE goal: $665,552.60
DBE total: $670,000.00

3rd bidder: Massana Construction, Inc.
Bid amount: $3,480,038.00

Subcontractor named

  1. Massana Construction, Inc. - self perform
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $697,000.00
    Description of work: project temporary traffic control (partial) flagging, other traffic control labor, traffic control supervisor, sequential & PCMS boards, temp devices and signs

DBE goal: $696,007.60
DBE total: $697,000.00

8/3/2022 bid opening - Olympia, WA

Item no. 1: SR 526, Airport Rd to E Casino Rd - Seismic Retrofit

Contract number: 009859
Engineer's estimate: $5,352,794.00
Number of addenda: 1
Number of bidders: 7/5
Award status: awarded 8/16/2022

Preliminary bid total results 

Apparent low: Kraemer North America, LLC. - $3,461,000.00
Apparent 2nd: Massana Construction, Inc. - $3,819,558.00
Apparent 3rd: IMCO General Construction, Inc. - $4,754,313.00

Verified bid total results

Low bidder: Kraemer North America, LLC.
Bid amount: $3,461,000.00

Subcontractor named

  1. Kraemer North America, LLC.
    Description of work: structural steel installation
  2. Elcon Corporation
    Description of work: electrical
  3. Rebar International, Inc.
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Rainier Welding, LLC - manufacturer - $442,700.00
    Description of work: column jackets (partial) - fabrication

SBE goal: $173,050.00
SBE total: $442,700.00

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $82,721.00
    Description of work: traffic control

VOB goal: $69,220.00
VOB total: $82,721.00

2nd bidder: Massana Construction, Inc.
Bid amount: $3,819,558.00

Subcontractor named

  1. Massana Construction, Inc.
    Description of work: structural steel installation
  2. Elcon Corporation
    Description of work: electrical 
  3. Sunset Company, LLC
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Rainier Welding, Inc. - manufacturer - $442,700.00
    Description of work: fabricate steel jackets

SBE goal: $190,977.90
SBE total: $442,700.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $9,400.00 
    Description of work: guardrail
  2. M2 Industrial, Inc. - sub - $83,100.00
    Description of work: temp barrier, impact attenuator

VOB goal: $76,391.16
VOB total: $92,500.00

3rd bidder: IMCO General Construction, Inc.
Bid amount: $4,754,313.00

Subcontractor named

  1. Elcon Corporation
    Description of work: electrical 
  2. Rebar International
    Description of work: rebar installation 
  3. IMCO General Construction, Inc.
    Description of work: structural steel installation

Small business enterprise (SBE)

  1. Advanced Government Services, Inc. - sub - $67,047.00
    Description of work: mobilization
  2. Advanced Government Services, Inc. - sub - $38,436.00
    Description of work: transportable attenuator
  3. Advanced Government Services, Inc. - sub - $12,480.00
    Description of work: sequential arrow sign
  4. Advanced Government Services, Inc. - sub - $550.00
    Description of work: port changeable mess sign
  5. Advanced Government Services, Inc. - sub - $53,552.00
    Description of work: other temp traffic control
  6. Advanced Government Services, Inc. - sub - $10,512.00
    Description of work: flaggers
  7. Advanced Government Services, Inc. - sub - $105,280.00
    Description of work: other traffic control labor
  8. Advanced Government Services, Inc. - sub - $102,960.00
    Description of work: traffic control supervisor
  9. Advanced Government Services, Inc. - sub - $21,000.00
    Description of work: patrol/main TC measures
  10. Advanced Government Services, Inc. - sub - $2,240.00
    Description of work: pedestrian traffic control

SBE goal: $237,715.65
SBE total: $414,057.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $40,000.00
    Description of work: mobilization
  2. M2 Industrial, Inc. - sub - $750.00
    Description of work: removing guardrail
  3. M2 Industrial, Inc. - sub - $350.00
    Description of work: removing guardrail anchor
  4. M2 Industrial, Inc. - sub - $6,500.00
    Description of work: beam guardrail type 31
  5. M2 Industrial, Inc. - sub - $1,800.00
    Description of work: guardrail anchor
  6. M2 Industrial, Inc. - sub - $25,200.00
    Description of work: temporary barrier
  7. M2 Industrial, Inc. - sub - $41,600.00
    Description of work: temporary impact attenuator
  8. M2 Industrial, Inc. - sub - $2,800.00
    Description of work: reset impact attenuator
  9. M2 Industrial, Inc. - sub - $19,800.00
    Description of work: remove/reset barrier

VOB goal: $95,086.26
VOB total: $138,800.00

7/27/2022 bid opening - Olympia, WA

Item no. 1: SR 900, 68th Ave S Vicinity Pedestrian Safety - Phase 2

Contract number: 009857
Engineer's estimate: $543,153.00
Number of addenda: 0
Number of bidders: 2/1
Award status: all bidders rejected 8/10/2022

Preliminary bid total results 

Apparent low: Northwest Cascade, Inc. - $1,155,155.00**

Verified bid total results

Low bidder: Northwest Cascade, Inc.
Bid amount: $1,155,052.00**

Disadvantaged business enterprise (DBE) 

  1. G&G, Inc. - sub - $50,000
    Description of work: electrical
  2. SK Landscape - sub - $24,203.00
    Description of work: landscaping
  3. M2 Industrial - sub - $29,724.00
    Description of work: guard rail
  4. Michaelis Trucking & Excavating - sub - $5,460.00
    Description of work: trucking
  5. O'bunco Engineering - sub - $14,780.00
    Description of work: survey
  6. The Bag Lady - sub - $7,169.90
    Description of work: erosion control
  7. Salinas Construction - sub - $76,738.00
    Description of work: concrete

DBE goal: $207,909.36
DBE total: $208,075.00

Item no. 2: SR 14, 1 Mile W of Salmon Falls Rd - Repair Debris Fence

Contract number: 009858
Engineer's estimate: $1,156,823.00
Number of addenda: 1
Number of bidders: 2/2
Award status: all bids rejected 8/11/2022

Preliminary bid total results 

Apparent low: Rock Supremacy, LLC - $1,027,863.00 
Apparent 2nd: Hi Tech Rockfall Construction, Inc. - $1,287,492.00

Verified bid total results

Low bidder: Rock Supremacy, LLC
Bid amount: $1,027,863.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. C&R Tractor & Landscaping - sub - $4,230.00
    Description of work: compost blanket
  2. C&R Tractor & Landscaping - sub - $39,100.00
    Description of work: wattle
  3. C&R Tractor & Landscaping - sub - $3,290.00
    Description of work: seed, fertilizing and mulch
  4. C&R Tractor & Landscaping - sub - $7,200.00
    Description of work: preparation for planting
  5. C&R Tractor & Landscaping - sub - $3,500.00
    Description of work: PSIPE tree mix A
  6. C&R Tractor & Landscaping - sub - $17,600.00
    Description of work: PSIPE shrub mix A
  7. C&R Tractor & Landscaping - sub - $40,600.00
    Description of work: PSIPE grass mix A
  8. C&R Tractor & Landscaping - sub - $46,400.00
    Description of work: PSIPE grass mix B
  9. C&R Tractor & Landscaping - sub - $1,530.00
    Description of work: bark of woodchip mulch
  10. C&R Tractor & Landscaping - sub - $5,640.00
    Description of work: erosion control blanket
  11. C&R Tractor & Landscaping - sub - $3,300.00
    Description of work: general weed control - chem Hp
  12. C&R Tractor & Landscaping - sub - $950.00
    Description of work: general weed control - hand pull
  13. Schneider & Sons, Inc. - sub - $9,750.00
    Description of work: transportable attenuator
  14. Schneider & Sons, Inc. - sub - $6,720.00
    Description of work: portable changeable message sign
  15. Schneider & Sons, Inc. - sub - $29,760.00
    Description of work: flaggers
  16. Schneider & Sons, Inc. - sub - $11,700.00
    Description of work: other traffic control labor
  17. Schneider & Sons, Inc. - sub - $23,000.00
    Description of work: traffic control supervisor
  18. Schneider & Sons, Inc. - sub - $1,440.00
    Description of work: construction sign class A

DBE goal: $154,179.45
DBE total: $255,710.00

2nd bidder: Hi Tech Rockfall Construction, Inc.
Bid amount: $1,287,492.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic - sub - $38,700.00
    Description of work: transportable attenuator
  2. BC Traffic - sub - $8,190.00
    Description of work: PCMS
  3. BC Traffic - sub - $41,758.00
    Description of work: other temporary traffic control
  4. BC Traffic - sub - $34,800.00
    Description of work: flaggers
  5. BC Traffic - sub - $13,570.20
    Description of work: other traffic control labor
  6. BC Traffic - sub - $44,781.80
    Description of work: traffic control supervisor
  7. BC Traffic - sub - $3,240.00
    Description of work: construction signs class A

DBE goal: $193,123.80
DBE total: $185,000.00

Item no. 3: I-405, BN RR Bridge to Ped Trail Bridge Seismic Retrofit

Contract number: 009850
Engineer's estimate: $14,306,219.00
Number of addenda: 5
Number of bidders: 9/5
Award status: awarded 8/15/2022

Preliminary bid total results 

Apparent low: Walsh Construction Company II, LLC - $14,564,089.63
Apparent 2nd: Shimmick Construction Company, Inc. - $15,760,916.00
Apparent 3rd: Combined Construction, Inc. - $15,983,039.00

Verified bid total results

Low bidder: Walsh Construction Company II, LLC
Bid amount: $14,564,089.63

Subcontractor named

  1. Walsh Construction Company II, LLC
    Description of work: structural steel installation
  2. Pacific Steel Group
    Description of work: rebar installation 
  3. Valley Electric Co. of Mt. Vernon, Inc.
    Description of work: electrical work

Disadvantaged business enterprise (DBE) 

  1. Advanced Traffic Control, LLC - sub - $1,822,072.00
    Description of work: temporary traffic control management and flagging services
  2. Jabez Holdings, Inc., dba ST Fabrication, Inc. - manufacturer - $1,468,000.00
    Description of work: structural steel manufacturer and fabrication

DBE goal: $2,767,177.03
DBE total: $3,290,072.00

2nd bidder: Shimmick Construction Company, Inc.
Bid amount: $15,760,916.00

Subcontractor named

  1. Valley Electric
    Description of work: electrical 
  2. Pacific Steel Group
    Description of work: rebar installation 
  3. Shimmick Construction Company, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. MBI Construction Services, Inc. - sub - $1,363,000.00
    Description of work: furnish steel jackets
  2. Advanced Government Services, Inc. - sub - $1,250,000.00
    Description of work: traffic control (partial)
  3. Salinas Construction, Inc. - sub - $21,754.00
    Description of work: flatwork
  4. The Bag Lady, Inc. - sub - $11,817.05
    Description of work: temporary erosion control
  5. Pavement Surface Control - sub - $200,200.00
    Description of work: concrete barriers
  6. Meko Construction, Inc. - sub - $40,000.00
    Description of work: concrete pump
  7. M2 Industrial, Inc. - sub - $133,314.00
    Description of work: metal beam guard rail

DBE goal: $2,994,574.04
DBE total: $3,019,905.05

3rd bidder: Combined Construction, Inc.
Bid amount: $15,983,039.00

Subcontractor named

  1. Combined Construction, Inc. - self perform
    Description of work: structural steel installation
  2. PNW Reinforcing
    Description of work: rebar installation 
  3. Electric West, Inc.
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. C&C Development - sub - $1,210,904.00
    Description of work: excavations, site civil
  2. Electric West, Inc. - sub - $136,635.00
    Description of work: electrical contractor
  3. PNW Reinforcing, Inc. - sub - $906,707.00
    Description of work: place and tie rebar
  4. Advanced Government Services, Inc. - sub - $804,786.00
    Description of work: traffic control

DBE goal: $3,036,777.41
DBE total: $3,059,032.00

7/20/2022 bid opening - Olympia, WA

Item no. 1: SR 18 Et Al, Northwest Region HMA Crack Seal and Pavement Repair

Contract number: 009851
Engineer's estimate: $2,013,559.00
Number of addenda: 2
Number of bidders: 6/3
Award status: awarded 8/8/2022

Preliminary bid total results 

Apparent low: Construction Ahead, Inc. dba Pavement Surface Control - $2,775,406.32
Apparent 2nd: Puget Paving and Construction, Inc. - $3,194,000.00
Apparent 3rd: Granite Construction Company - $3,587,988.00

Verified bid total results

Low bidder: Construction Ahead, Inc. dba Pavement Surface Control
Bid amount: $2,775,406.32

Subcontractor named

  1. Transportation Systems, Inc.
    Description of work: electrical 

Small business enterprise (SBE)

  1. Construction Ahead, Inc. dba Pavement Surface Control - prime - $165,000.00
    Description of work: crack and joint seal

SBE goal: $138,770.32
SBE total: $165,000.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $60,000.00
    Description of work: TC devices and equip - partial  

VOB goal: $55,508.13
VOB total: $60,000.00

2nd bidder: Puget Paving and Construction, Inc.
Bid amount: $3,194,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. Waunch Construction & Trucking, Inc. - sub - $159,700.00
    Description of work: restripe impacted delineation - partial

SBE goal: $159,700.00
SBE total: $159,700.00

Veteran-owned business (VOB)

  1. Waunch Construction & Trucking, Inc. - sub - $63,880.00
    Description of work: restripe impacted delineation - partial

VOB goal: $63,880.00
VOB total: $63,880.00

3rd bidder: Granite Construction Company
Bid amount: $3,587,988.00

Subcontractor named

  1. G & G Incorporated
    Description of work: electrical

Small business enterprise (SBE)

  1. none proposed
    Description of work: none proposed

SBE goal: $179,399.40
SBE total: $0.00

Veteran-owned business (VOB)

  1. American Veterans Construction, LLC - sub - $68,000.00 
    Description of work: clean up asphalt
  2. American Veterans Construction, LLC - sub - $8,000.00 
    Description of work: erosion/water pollution control
  3. American Veterans Construction, LLC - sub - $8,500.00
    Description of work: roadside cleanup

VOB goal: $71,759.76
VOB total: $84,500.00

Item no. 2: I-90 Et Al, SCR Region Wide - Roadside Hardware Preservation

Contract number: 009855
Engineer's estimate: $4,190,318.68
Number of addenda: 0
Number of bidders: 4/4
Award status: awarded 8/8/2022

Preliminary bid total results 

Apparent low: Petersen Brothers, Inc. - $4,297,422.38
Apparent 2nd: Coral Construction Company - $4,577,777.00
Apparent 3rd: Frank Gurney, Inc. - $5,132,903.13

Verified bid total results

Low bidder: Petersen Brothers, Inc.
Bid amount: $4,297,422.38

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. AGS - sub - $688,011.00
    Description of work: project traffic control

DBE goal: $687,587.58
DBE total: $688,011.00

2nd bidder: Coral Construction Company
Bid amount: $4,577,777.00

Subcontractor named

  1. Advanced Government Services, Inc.
    Description of work: flagging (i.e. traffic control) services

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $770,284.00
    Description of work: flagging (i.e. traffic control) services

DBE goal: $732,444.32
DBE total: $770,284.00

3rd bidder: Frank Gurney, Inc.
Bid amount: $5,132,903.13

Subcontractor named

  1. North Star Enterprises, Inc.
    Description of work: bid item #29, portable changeable message sign; bid item #30, project temporary traffic control
  2. Fox Erosion Control & Landscape, Inc.
    Description of work: bid item #14, seeding; bit item #15, medium compost

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $822,000.00
    Description of work: flagging (i.e. traffic control) services

DBE goal: $821,264.50
DBE total: $822,000.00

7/13/2022 bid opening - Olympia, WA

Item no. 1: SR 524, Locust Way Vic to Larch Way Vic Drainage Repair (Small Works Roster)

Contract number: 009853
Engineer's estimate: $344,322.00
Number of addenda: 0
Number of bidders: 5/1
Award status: awarded 8/5/2022

Preliminary bid total results 

Apparent low: A-1 Landscaping and Construction, Inc. - $761,675.00

Verified bid total results

Low bidder: A-1 Landscaping and Construction, Inc.
Bid amount: $761,675.00

Disadvantaged business enterprise (DBE) 

  1. HAMD Enterprise, Inc. - sub - $106,870.00
    Description of work: bid items 2-3, 7-9, 26-34, 49

DBE goal: $106,634.50
DBE total: $106,870.00

7/7/2022 bid opening - Olympia, WA

Item no. 1: SR 20, Emergency Pavement Repair

Contract number: 009854
Engineer's estimate: $1,018,402.00
Number of addenda: 0
Number of bidders: 2/2
Award status: awarded 7/14/2022

Preliminary bid total results 

Apparent low: Central Washington Asphalt, Inc. - $1,240,000.00
Apparent 2nd: Interstate Concrete & Asphalt Company - $1,458,338.00

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $1,240,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $96,765.00
    Description of work: flagging, traffic control, sweeping
  2. West Star Construction of Spokane dba West Star Biodiesel - sub - $39,240.00
    Description of work: dump truck services
  3. D&B Landworks & Development, LLC - sub - $62,820.00
    Description of work: hauling services of aggregates and asphalt with the use of dump trucks

DBE goal: $198,400.00
DBE total: $198,825.00

2nd bidder: Interstate Concrete & Asphalt Company
Bid amount: $1,458,338.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises Inc., dba North Star Enterprises 1, Inc. - sub - $159,340.00
    Description of work: flagging, traffic control, sweeping
  2. AMC Trucking LLC - sub - $74,000.00
    Description of work: dump trucking

DBE goal: $233,334.08
DBE total: $233,340.00

6/29/2022 bid opening - Olympia, WA

Item no. 1: SR 305, Eagle Harbor Maintenance Facility Slip F Drive On Tie-Up Slip

Contract number: 009839
Engineer's estimate: $5,231,366.50
Number of addenda: 1
Number of bidders: 8/5
Award status: awarded 7/6/2022

Preliminary bid total results 

Apparent low: American Construction Co., Inc. - $5,116,468.00
Apparent 2nd: Manson Construction Co. - $5,327,768.00
Apparent 3rd: Orion Marine Contractors, Inc. - $6,714,410.00

Verified bid total results

Low bidder: American Construction Co., Inc.
Bid amount: $5,116,468.00

Subcontractor named

  1. Self perform 
    Description of work: structural steel installation
  2. Self perform
    Description of work: rebar installation
  3. Valley Electric
    Description of work: electrical work

Small business enterprise (SBE)

  1. American Construction Co., Inc. - prime - $600,000.00
    Description of work: marine work

SBE goal: $255,834.40
SBE total: $600,000.00

Veteran-owned business (VOB)

  1. Dunlap Towing - sub - $90,000.00
    Description of work: towing or marine equipment
  2. Seattle Dive Company - sub - $44,018.59
    Description of work: diving services/pile wraps

VOB goal: $102,329.36
VOB total: $134,019.00

2nd bidder: Manson Construction Co.
Bid amount: $5,327,768.00

Subcontractor named

  1. Manson Construction Co. 
    Description of work: structural steel installation
  2. Manson Construction Co.
    Description of work: rebar installation
  3. ELM Solutions Corp. dba Dalton Electric Corp.
    Description of work: electrical

Small business enterprise (SBE)

  1. ELM Solutions Corp. dba Dalton Electric Corp. - sub - $340,000.00
    Description of work:  electrical (partial)

SBE goal: $266,388.40
SBE total: $340,000.00

Veteran-owned business (VOB)

  1. Thompson Metal Fabrication, Inc. - manufacturer/supplier - $170,000.00
    Description of work: (partial) furnish steel fabrications

VOB goal: $106,555.36
VOB total: $170,000.00

3rd bidder: Orion Marine Contractors, Inc.
Bid amount: $6,714,410.00

Subcontractor named

  1. Dalton Electric Corp.
    Description of work: electrical
  2. Rebar International, Inc.
    Description of work: steel reinforcing bar

Small business enterprise (SBE)

  1. Dalton Electric Company - sub - $345,500.00
    Description of work: electrical

SBE goal: $335,720.50
SBE total: $345,500.00

Veteran-owned business (VOB)

  1. Dead Calm Seas Marine Services - sub - $58,000.00
    Description of work: diving, timber pile repairs
  2. Dunlap Towing, Inc. - sub - $80,000.00
    Description of work: marine towing

VOB goal: $134,288.20
VOB total: $138,000.00

Item no. 2: US 12, West Of White Pass – Repair Cable Net Post

Contract number: 009849
Engineer's estimate: $552,952.00
Number of addenda: 1
Number of bidders: 2/2
Award status: awarded 7/8/2022

Preliminary bid total results 

Apparent low: Rock Supremacy LLC - $596,064.00
Apparent 2nd: Hi Tech Rockfall Construction Inc. - $597,366.00 - rejected 7/8/2022

Verified bid total results

Low bidder: Rock Supremacy LLC
Bid amount: $596,064.00

Small business enterprise (SBE)

  1. Meritus Earthworks, LLC - sub - $15,000.00
    Description of work: debris hauling
  2. Meritus Earthworks, LLC - sub - $8,000.00
    Description of work: automated flagger devices
  3. Meritus Earthworks, LLC - sub - $5,600.00
    Description of work: PCMS boards install
  4. Meritus Earthworks, LLC - sub - $2,160.00
    Description of work: install const. signs
  5. Meritus Earthworks, LLC - sub - $10,000.00
    Description of work: install/protect guardrail

SBE goal: $29,803.20
SBE total: $40,760.00

Veteran-owned business (VOB)

  1. Hughes Group LLC - sub - $27,749.00 
    Description of work: TC supervisor (partial) 

VOB goal: $11,921.28
VOB total: $27,749.00

2nd bidder: Hi Tech Rockfall Construction Inc. - rejected 7/8/2022
Bid amount: $597,366.00

Small business enterprise (SBE)

  1. CNC Development - sub - $0
    Description of work: haul, traffic control, signs
  2. COAT - sub - $0
    Description of work: traffic control 
  3. AGS - sub - $0
    Description of work: traffic control 
  4. Northwest TC - sub - $0
    Description of work: traffic control 
  5. BC Traffic - sub - $0
    Description of work: traffic control  
  6. Pacific Land Pres. - sub - $30,000.00
    Description of work: mod cable net (partial)

SBE goal: $29,868.30
SBE total: $30,000.00

Veteran-owned business (VOB)

  1. Dirty Deeds - sub - $0
    Description of work: haul, traffic control, signs
  2. Waunch (WCNT Inc.) - sub - $0
    Description of work: haul, traffic control, signs
  3. Liberty Electric - sub - $0
    Description of work:  haul, traffic control, signs
  4. AAA Veterans Construction- sub - $0
    Description of work: haul, traffic control, signs
  5. Ground Breaker Offroad- sub - $12,000.00
    Description of work: load and haul debris
  6. Veterans General Contracting - sub - $0
    Description of work: haul, traffic control, signs

VOB goal: $11,947.32
VOB total: $12,000.00

Item no. 3: SR 96, North Creek Fish Passage

Contract number: 009834
Engineer's estimate: $2,925,185.00
Number of addenda: 4
Number of bidders: 9/1
Award status: all bidders rejected 7/6/2022

Preliminary bid total results 

Apparent low: A-1 Landscaping and Construction, Inc. - $6,146,893.00

Verified bid total results

Low bidder: A-1 Landscaping and Construction, Inc.
Bid amount: $6,146,893.00

Subcontractor named

  1. A-1 Landscaping and Construction, Inc. 
    Description of work: structural steel install
  2. A-1 Landscaping and Construction, Inc.
    Description of work: rebar installation

Small business enterprise (SBE)

  1. HAMD Enterprise, Inc. - sub - $317,073.00
    Description of work: TESC and landscaping

SBE goal: $307,344.65
SBE total: $317,073.00

Veteran-owned business (VOB)

  1. Wm. Winkler Co. - sub - $955,111.20
    Description of work: precast footing and culvert 

VOB goal: $122,937.86
VOB total: $955,111.20

6/23/2022 bid opening - Olympia, WA

Item no. 1: SR 10 et al, Kittitas & Yakima Co & SE WA Centerline Rumble Strips

Contract number: 009845
Engineer's estimate: $1,264,889.50
Number of addenda: 1
Number of bidders: 4/2
Award status: awarded 7/6/2022

Preliminary bid total results 

Apparent low: Construction Ahead, Inc. dba Pavement Surface Control - $2,530,478.90
Apparent 2nd: Granite Construction Company - $2,871,423.00

Verified bid total results

Low bidder: Construction Ahead, Inc. dba Pavement Surface Control
Bid amount: $2,530,478.90

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. dba PSC - prime - $408,450.50
    Description of work: paint lines, temporary/permanent pavement marking includes: striping, rumble strips 

DBE goal: $379,571.84
DBE total: $408,450.50

2nd bidder: Granite Construction Company
Bid amount: $2,871,423.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. TBMM, LLC - sub - $450,000.00
    Description of work: traffic control and class A signs

DBE goal: $430,713.45
DBE total: $450,000.00

Item no. 2: I-90, West Easton to Renslow Vicinity Bridge Deck Repair

Contract number: 009844
Engineer's estimate: $1,008,531.00
Number of addenda: 1
Number of bidders: 5/3
Award status: awarded 6/29/2022

Preliminary bid total results 

Apparent low: N.A Degerstrom, Inc. - $1,344,026.00
Apparent 2nd: Massana Construction, Inc. - $1,357,995.00
Apparent 3rd: M.J. Hughes, Inc. - $1,724,786.00

Verified bid total results 

Low bidder: N.A Degerstrom, Inc.
Bid amount: $1,344,026.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. TBMM LLC - sub - $193,232.00
    Description of work: traffic control

DBE goal: $188,163.64
DBE total: $193,232.00

2nd bidder: Massana Construction, Inc.
Bid amount: $1,357,995.00

Subcontractor named

  1. Massana Construction, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. TBMM, LLC
    Description of work: traffic control

DBE goal: $190,119.30
DBE total: $190,200.00

3rd bidder: M.J. Hughes Construction Company
Bid amount: $1,724,786.00

Subcontractor named

  1. Zavala Corporation
    Description of work: rebar supply and install

Disadvantaged business enterprise (DBE) 

  1. Zavala Corporation - sub (force account) - $12,500.00
    Description of work: reinforcing steel furnish and install (force account)
  2. Zavala Corporation - sub - $67,000.00
    Description of work: forms for full depth deck repair
  3. TBMM, LLC - sub - $162,000.00
    Description of work: traffic control 

DBE goal: $241,470.04
DBE total: $241,500.00

Item no. 3: US 2, Cashmere East - Paving

Contract number: 009843
Engineer's estimate: $5,043,602.47
Number of addenda: 1
Number of bidders: 2/2
Award status: awarded 7/7/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $6,956,734.00
Apparent 2nd: Central Washington Asphalt - $7,895,000.00

Verified bid total results 

Low bidder: Granite Construction Company
Bid amount: $6,956,734.00

Subcontractor named

  1. Neppel Electrical & Controls, LLC
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $672,665.00
    Description of work: traffic control, temp & recessed pavement markings, rumble strips, guide posts, joint sealing
  2. Neppel Electrical & Controls, LLC - sub - $412,000.00
    Description of work: electrical
  3. O'Bunco Engineering International, Inc. - sub - $34,080.00
    Description of work: land surveying 

DBE goal: $1,113,077.44
DBE total: $1,118,745.00

2nd bidder: Central Washington Asphalt
Bid amount: $7,895,000.00

Subcontractor named

  1. Neppel Electrical & Controls, LLC
    Description of work: traffic signal installation; electrical 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $850,122.50
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, removal & installations: (ie. temp. plastic & paint stripes), guide posts, sign erection, joint sealing 
  2. O'Bunco Engineering, Inc. - sub - $43,760.00
    Description of work: land surveying: layout/staking
  3. Neppel Electrical & Controls, LLC - sub - $412,000.00
    Description of work: traffic signal installation, electrical

DBE goal: $1,263,200.00
DBE total: $1,305,882.50

Item no. 4: I-5, NB 12th Street NE Bridge Girder Replacement

Contract number: 009846
Engineer's estimate: $950,755.00
Number of addenda: 0
Number of bidders: 3/2
Award status: awarded 7/15/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $1,472,259.62
Apparent 2nd: Combined Construction, Inc. - $1,768,699.00

Verified bid total results 

Low bidder: Granite Construction Company
Bid amount: $1,472,259.62

Subcontractor named

  1. Ashford Electric and Construction Co.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors LLC - sub - $240,000.00
    Description of work: bridge construction 

DBE goal: $235,561,54
DBE total: $240,000.00

2nd bidder: Combined Construction, Inc.
Bid amount: $1,768,699.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $284,990.00
    Description of work: traffic control 

DBE goal: $282,991.84
DBE total: $284,990.00

Item no. 5: I-90, S Cle Elum Rd Bridges Deck Rehabilitation

Contract number: 009840
Engineer's estimate: $13,450,837.90
Number of addenda: 4
Number of bidders: 9/3
Award status: awarded 7/18/2022

Preliminary bid total results 

Apparent low: Max J. Kuney Company - $14,589,091.00
Apparent 2nd: Hamilton Construction Co. - $17,175,358.00
Apparent 3rd: M.J. Hughes Construction, Inc. - $20,468,916.98

Verified bid total results 

Low bidder: Max J. Kuney Company
Bid amount: $14,589,091.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Salinas Construction, Inc. - sub - $68,672.70
    Description of work: concrete paving
  2. O'Bunco Engineering, Inc. - sub - $160,950.00
    Description of work: survey/staking
  3. Daramola, Inc. - sub - $301,168.00
    Description of work: landscaping
  4. Subsurface Construction LLC - sub - $1,321,242.00
    Description of work: shoring
  5. Industry Erectors, Inc. - sub - $318,674.00
    Description of work: structural steel erecting
  6. Pavement Surface Control - sub - $606,198.00
    Description of work: guardrail & pavement marking

DBE goal: $2,771,927.29
DBE total: $2,776,904.70

2nd bidder: Hamilton Construction Co.
Bid amount: $17,175,358.00

Subcontractor named

  1. Hamilton Construction Co.
    Description of work: structural steel installation
  2. Harris Rebar Columbia Basin, Inc. 
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $826,982.00
    Description of work: flagging (i.e., traffic control) services
  2. Daramola, Inc. - sub - $301,168.00
    Description of work: land scaping services
  3. Construction Ahead Inc, dba Pavement Surface Control - sub - $668,176.00
    Description of work: highway, street & bridge
  4. Subsurface Construction LLC - sub - $1,255,800.00
    Description of work: shoring
  5. Synchronized Enterprises, dba Farwest Fabrication Engineering - manufacturer - $281,000.00
    Description of work: fabricated structural metal manufacturing 

DBE goal: $3,263,318.02
DBE total: $3,333,126.00

3rd bidder: M.J. Hughes Construction, Inc.
Bid amount: $20,468,916.98

Subcontractor named

  1. Zavala Corporation
    Description of work: structural steel erection
  2. Zavala Corporation
    Description of work: reinforcing steel

Disadvantaged business enterprise (DBE) 

  1. Zavala Corporation - sub (force account) - $30,000.00
    Description of work: forms for full depth deck repair
  2. Zavala Corporation - sub - $2,920,000.00
    Description of work: concrete footings, rebar, detour bridge
  3. TBMM, LLC - sub - $750,000.00
    Description of work: traffic control
  4. O'Bunco Engineering Inc. - sub - $160,950.00
    Description of work: survey
  5. The Bag Lady - sub - $29,000.00
    Description of work: erosion control 

DBE goal: $3,889,094.23
DBE total: $3,889,950.00

6/15/2022 bid opening - Olympia, WA

Item no. 1: I-5/I-205, Concrete Panel Replacement and Joint Rehabilitation

Contract number: 009841
Engineer's estimate: $2,778,165.13
Number of addenda: 0 
Number of bidders: 4/1
Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $6,376,376.00

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $6,376,376.00

Subcontractor named

  1. Roger Langeliers Construction Co.
    Description of work: dowel and rebar furnish and installation
  2. Mill Plain Electric
    Description of work: electrical

Disadvantaged business enterprise

  1. D & H Flagging, Inc. - sub - $710,000.00
    Description of work: project traffic control
  2. Construction Ahead, Inc. - sub - $192,382.20
    Description of work: pavement marking and striping and longitudinal joint seal

DBE goal: $892,692.64
DBE total: $902,382.20
 

6/8/2022 bid opening - Olympia, WA

Item no. 1: Northup Prewash Pad Retrofit NPDES - NWR

Contract number: 009825
Engineer's estimate: $1,150,000.00
Number of addenda: 2 
Number of bidders: 3/2
Award status: awarded 6/27/2022

Preliminary bid total results 

Apparent low: Stellar J Corporation - $1,799,799.00
Apparent 2nd: Active Construction, Inc. - $1,995,955.00

Verified bid total results

Low bidder: Stellar J Corporation
Bid amount: $1,799,799.00

Subcontractor named

  1. Stellar J Corporation
    Description of work: HVAC
  2. Mt. Hood Piping
    Description of work: plumbing 
  3. Apex Electrical Group
    Description of work: electrical
  4. Stellar J Corporation
    Description of work: structural steel
  5. Grizzly Bar and Post Tensioning
    Description of work: rebar supply/install

Small business enterprise (SBE)

  1. Washington Earthwork - sub - $152,672.07
    Description of work: utilities, grading
  2. Apex Electrical Group - sub - $112,850.00
    Description of work: electrical

SBE goal: $89,989.95
SBE total: $265,522.07

Veteran-owned business (VOB)

  1. None proposed
    Description of work: none proposed 

VOB goal: $35,995.98
VOB total: $0

2nd bidder: Active Construction, Inc.
Bid amount: $1,995,995.00

Subcontractor named

  1. American Electrical Services
    Description of work: electrical
  2. Zemek Construction
    Description of work: structural steel install, rebar install 
  3. Hawk Mechanical
    Description of work: plumbing 
     

Small business enterprise (SBE)

  1. Versatile Drilling - sub - $79,500.00
    Description of work: drilled shafts
  2. American Electrical Service - sub - $105,000.00
    Description of work: electrical

SBE goal: $99,799.75
SBE total: $184,500

Veteran-owned business (VOB)

  1. None proposed
    Description of work: none proposed 

VOB goal: $39,919.90
VOB total: $0

Item no. 2: I-90, Homestead Valley Rd to Hyak Bridge Deck Repair

Contract number: 009832
Engineer's estimate: $1,544,600.00
Number of addenda: 2
Number of bidders: 3/3
Award status: awarded 7/7/2022

Preliminary bid total results 

Apparent low: M.J. Hughes Construction, Inc. - $1,695,253.00 - rejected 6/23/2022
Apparent 2nd: N.A. Degerstrom, Inc. - $2,563,247.00
Apparent 3rd: Combined Construction, Inc. - $3,259,877.00

Verified bid total results

Low bidder: M.J. Hughes Construction, Inc. - rejected 6/23/2022
Bid amount: $1,695,253.00

Subcontractor named

  1. M.J. Hughes Construction, Inc.
    Description of work: structural steel or reinforcing steel installation

Disadvantaged business enterprise (DBE) 

  1. TBMM, LLC - sub - $179,000.00
    Description of work: traffic control

DBE goal: $288,193.01
DBE total: $179,000
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

2nd bidder: N.A. Degerstrom, Inc.
Bid amount: $2,563,247.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic - sub - $449,480.00
    Description of work: traffic control

DBE goal: $435,751.99
DBE total: $449,480.00

3rd bidder: Combined Construction, Inc.
Bid amount: $3,259,877.00

Subcontractor named

  1. Self perform
    Description of work: structural steel installation, rebar installation

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC dba Budiman Construction - sub - $555,000.00
    Description of work: traffic control

DBE goal: $554,179.09
DBE total: $555,000.00

Item no. 3: E Sunset Way Vic & NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay

Contract number: 009833
Engineer's estimate: $11,165,597.00
Number of addenda:  0
Number of bidders: 4/3
Award status: awarded 6/21/22022

Preliminary bid total results 

Apparent low: Acme Concrete Paving, Inc. - $11,998,071.67**
Apparent 2nd: Midmountain Contractors, Inc. - $12,769,418.00
Apparent 3rd: C.A. Carey Corporation - $13,292,712.00

Verified bid total results

Low bidder: Acme Concrete Paving, Inc.
Bid amount: $11,998,071.66**

Subcontractor named

  1. Combined Construction
    Description of work: structural steel & rebar installation
  2. Valley Electric
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. Advanced Traffic Control - sub - $1,831,432.00
    Description of work: traffic control
  2. Pavement Surface Control - sub - $455,551.00
    Description of work: permanent marking

DBE goal: $2,159,652.90
DBE total: $2,286,983.00

2nd bidder: Midmountain Contractors, Inc.
Bid amount: $12,769,418.00

Subcontractor named

  1. Valley Electric
    Description of work: electrical 
  2. PNW Reinforcing Inc.
    Description of work: rebar
  3. PNW Reinforcing Inc.
    Description of work: structural steel

Disadvantaged business enterprise (DBE) 

  1. Novtio Construction, Inc. - sub - $1,646,380.00
    Description of work: traffic control
  2. Pavement Surface Control, Inc. - sub - $881,832.50
    Description of work: temporary barrier and pavement markings

DBE goal: $2,298,495.24
DBE total: $2,528,212.00

3rd bidder: C.A. Carey Corporation
Bid amount: $13,292,712.00

Subcontractor named

  1. Valley Electric
    Description of work: electrical
  2. Industry Erectors, Inc.
    Description of work: structural steel
  3. C.A. Carey Corp / self perform
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. dba Pavement Surface Control - sub - $600,000.00
    Description of work: pavement markings
  2. Salinas Construction, Inc. - sub - $459,392.00
    Description of work: concrete
  3. Advanced Traffic Control LLC - sub - $1,500,000.00
    Description of work:  traffic control

DBE goal: $2,392,688.16
DBE total: $2,559,392.00

Item no. 4: US 395, Loon Lake to Hafer Rd Paving

Contract number: 009842
Engineer's estimate: $6,803,104.00
Number of addenda: 2
Number of bidders: 3/2
Award status: awarded 6/29/2022

Preliminary bid total results 

Apparent low: Shamrock Paving, Inc. - $10,350,000.00
Apparent 2nd: CPM Development Corporation - $11,895,111.00

Verified bid total results

Low bidder: Shamrock Paving, Inc.
Bid amount: $10,350,000.00

Subcontractor named

  1.  Power City Electric, Inc.
    Description of work: illumination / electrical
  2. Shamrock Paving, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $741,579.00
    Description of work: flagging, traffic control, recessed pavement marking, rumble strips, guide posts, sign erection, sweeping, joint seal
  2. Construction Ahead, Inc. dba Pavement Surface Control - sub - $332,110.04
    Description of work: paint lines, temporary/permanent pavement marking includes: striping, crack seal, temp & perm non-electrical sign erection
  3. Ditches Unlimited, Inc. - sub - $330,566.55
    Description of work: culverts, highway, road and street construction
  4. O'Bunco Engineering, Inc. - sub - $51,130.00
    Description of work: land surveying, layout/staking
  5. West Star Construction of Spokane - sub - $201,000.00
    Description of work: dump truck services

DBE goal: $1,656,000.00
DBE total: $1,656,385.59

2nd bidder: CPM Development Corporation
Bid amount: $11,895,111.00

Subcontractor named

  1.  Neppel Electric & Controls, LLC
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. dba North Star - sub - $851,867.14
    Description of work: flagging, traffic control, temp pavement marking & striping, rumble strips, misc. removal, installations, guide posts, joint sealing, sweeping, sign erection
  2. Northern Resource Consulting Inc. dba NRC, Inc. - sub - $47,700.00
    Description of work: high visibility silt fence, SPCC, erosion control, hydro seeding, environmental services, construction monitoring, CESCL, erosion control inspections, large woody debris
  3. A.M.C. Trucking, LLC - sub - $166,050.00
    Description of work: dump trucking
  4. O'Bunco Engineering Int'l, Inc. dba O'Bunco Engineering, Inc. - sub - $45,600.00
    Description of work: civil engineering, Land surveying, staking
  5. Ditches Unlimited, Inc. - sub - $305,165.00
    Description of work: culverts, highway construction, backfilling, road and street construction, construction
  6. Construction Ahead Inc. dba Pavement Surface Control - sub - $263,578.70
    Description of work: highway: paint lines, permanent pavement marking, striping, crack seal, per non-electrical sign erection limited to highway
  7. Neppel Electrical & Controls, LLC - sub - $224,440.00
    Description of work: control system installation, electrical, install electrical wiring and equipment

DBE goal: $1,903,217.76
DBE total: $1,904,290.84

Item no. 5: WSF, Systemwide On-Call Off-Shore Maintenance

Contract number: 009830
Engineer's estimate: $1,407,593.00
Number of addenda: 3
Number of bidders: 4/2
Award status: awarded 6/27/2022

Preliminary bid total results 

Apparent low: American Construction Co., Inc. - $1,530,703.00
Apparent 2nd: Manson Construction Co. - $1,582,373.00

Verified bid total results

Low bidder: American Construction Co., Inc.
Bid amount: $1,530,703.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. American Construction Co., Inc. - prime - $878,000.00
    Description of work: marine construction 

SBE goal: $76,535.15
SBE total: $878,000.00

Veteran-owned business (VOB)

  1. Mathews Lumber Inc. - supplier - $70,800.00
    Description of work: timber supplier

VOB goal: $30,614.06
VOB total: $70,800.00

2nd bidder: Manson Construction Co.
Bid amount: $1,582,373.00

Subcontractor named

  1. Self perform
    Description of work: structural steel installation

Small business enterprise (SBE)

  1. Rainier Welding, Inc. - manufacturer - $74,000.00
    Description of work: steel fabrication
  2. Hamer Environmental L.P. - sub - $6,500.00
    Description of work: protected species monitor

SBE goal: $79,118.65
SBE total: $80,500.00

Veteran-owned business (VOB)

  1. Dunlap Towing Co. - sub - $33,000.00
    Description of work: towing

VOB goal: $31,647.46
VOB total: $33,000.00

Item no. 6: SR 125, Oregon State Line to Military Rd Vic Paving, ADA & Sidewalks

Contract number: 009829
Engineer's estimate: $4,659,440.80
Number of addenda:  2
Number of bidders: 3/3
Award status: awarded 7/20/2022

Preliminary bid total results 

Apparent low: Central Washington Asphalt, Inc. - $5,945,000.00
Apparent 2nd: Interstate Concrete & Asphalt Company - $6,599,504.00
Apparent 3rd: Granite Construction Company - $6,914,123.20

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $5,945,000.00

Subcontractor named

  1. Mill Plain Electric, Inc.
    Description of work: electrical / illumination

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $46,400.00
    Description of work: sweeping
  2. O'Bunco Engineering, Inc. - sub - $43,910.00
    Description of work: land surveying: layout/staking
  3. Northwest Traffic Control, LLC - sub - $510,395.00
    Description of work: traffic control & flagging for road construction: class A & B signage
  4. Construction Ahead, Inc. dba Pavement Surface Control - sub - $328,967.00
    Description of work: paint lines, temporary/permanent pavement marking includes: striping, guardrail construction, precast concrete blocks, crack & joint seal, erosion control, silt fence, temp & perm non-electrical sign erection

DBE goal: $891,750.00
DBE total: $929,572.00

2nd bidder: Interstate Concrete & Asphalt Company
Bid amount: $6,599,504.00

Subcontractor named

  1. Mill Plain Electric
    Description of work: bid items 40, 41, 42 (electrical) 

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering - sub - $43,810.00
    Description of work: surveying
  2. Pavement Surface Control - sub - $318,317.00
    Description of work: crack & joint seal, temp/permanent pavement marking, perm sign erection
  3. NW Traffic Control - sub - $627,800.00
    Description of work:  

DBE goal: $989,925.60
DBE total: $989,927.00

3rd bidder: Granite Construction Company
Bid amount: $6,914,123.20

Subcontractor named

  1. Mill Plain Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Northwest Traffic Control - sub - $412,000.00
    Description of work: traffic control, class A & B signage, traffic control devices
  2. Pavement Surface Control - sub - $235,705.00
    Description of work: temporary/permanent pavement marking, crack & joint seal, signage
  3. Gilbert Patterson Concrete, Inc. - sub - $395,000.00
    Description of work: concrete for sidewalks, ADA, curb & gutter

DBE goal: $1,037,118.48
DBE total: $1,042,705.00

6/2/2022 bid opening - Olympia, WA

Item no. 1: SR 104, Kingston Ferry Terminal Transfer Span Overlays - Small Works Roster

Contract number: 009835
Engineer's estimate: $179,143.00
Number of addenda: 0 
Number of bidders: 3/2
Award status: awarded 6/14/2022

Preliminary bid total results 

Apparent low: Leewens Corporation - $148,668.00
Apparent 2nd: Combined Construction, Inc. - $613,383.00

Verified bid total results 

Low bidder: Leewens Corporation
Bid amount: $148,668.00

2nd bidder: Combined Construction, Inc.
Bid amount: $613,383.00

Item no. 2: I-90, Mount Baker Tunnel Heat Detection System Repair

Contract number: 009635
Engineer's estimate: $367,403.00
Number of addenda: 1
Number of bidders:  4/3
Award status: awarded 6/27/2022

Preliminary bid total results 

Apparent low: Elcon Corporation - $416,103.00
Apparent 2nd: Valley Electric Co. of Mt. Vernon, Inc. - $421,791.00 - rejected 6/16/2022
Apparent 3rd: Northeast Electric, LLC - $621,503.00

Verified bid total results 

Low bidder: Elcon Corporation
Bid amount: $416,103.00

Small business enterprise (SBE)

  1. Mobile Electric - general supplier - $25,000.00
    Description of work: supplier:  

SBE goal: $20,805.15
SBE total: $25,000.00

Veteran-owned business (VOB)

  1. Apex Electrical Group - sub - $18,000.00
    Description of work: demolition  

VOB goal: $8,322.06
VOB total: $18,000.00

2nd bidder: Valley Electric Co. of Mt. Vernon, Inc. - rejected 6/16/2022
Bid amount: $421,791.00

Small business enterprise (SBE)

  1. Advanced Traffic Control (ATC) - sub - $145,000.00
    Description of work: traffic control implementation   

SBE goal: $21,089.55
SBE total: $145,000.00

Veteran-owned business (VOB)

  1. Concrete Express - sub - $8,500.00
    Description of work: partial - concrete scanning

VOB goal: $8,435.82
VOB total: $8,500.00

3rd bidder: Northeast Electric, LLC 
Bid amount: $621,503.00

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $57,877.92
    Description of work: TCS & labor/driver  

SBE goal: $31,075.15
SBE total: $57,877.92

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $34,616.84
    Description of work: TC devices & equipment

VOB goal: $12,430.06
VOB total: $34,616.84

5/25/2022 bid opening - Olympia, WA

Item no. 1: SR 9, Northwest Region HMA Crack Seal & Pavement Repair

Contract number: 009821
Engineer's estimate: $4,902,502.30
Number of addenda: 2
Number of bidders: 4/3

Award status: awarded 6/15/2022

Preliminary bid total results 

Apparent low: C.R. Contracting LLC - $4,695,066.87 - rejected 6/7/2022
Apparent 2nd: Granite Construction Company - $6,276,691.64
Apparent 3rd: Construction Ahead, Inc. dba Pavement Surface Control - $7,450,554.07

Verified bid total results 

Low bidder: C.R. Contracting LLC - rejected 6/7/2022
Bid amount: $4,695,066.87

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. BC Traffic - sub - $660,000.00
    Description of work: traffic control

DBE goal: $657,309.36
DBE total: $660,000.00

2nd bidder: Granite Construction Company
Bid amount: $6,276,691.64

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC - sub - $1,175,000.00
    Description of work: flagging and traffic control management
  2. Reece Construction Company - sub - $60,000.00
    Description of work: asphalt milling

DBE goal: $878,736.83
DBE total: $1,235,000.00

3rd bidder: Construction Ahead, Inc. dba Pavement Surface Control
Bid amount: $7,450,554.07

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. dba PSC - prime - $1,120,000.00
    Description of work: crack & joint seal

DBE goal: $1,043,077.57
DBE total: $1,120,000.00

Item no. 2: SR 22 Et Al, Yakima & Kittitas County Bridge Deck Repair

Contract number: 009824
Engineer's estimate: $2,605,157.00
Number of addenda: 1
Number of bidders: 4/1

Award status: awarded 7/22/2022

Preliminary bid total results 

Apparent low: M.J. Hughes Construction, Inc. - $3,626,871.00

Verified bid total results 

Low bidder: M.J. Hughes Construction, Inc.
Bid amount: $3,626,871.00

Subcontractor named 

  1. M.J. Hughes Construction, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. None proposed - N/A - $0
  2. Description of work: none proposed

DBE goal: $652,836.78
DBE total: $0

Item no. 3: SR 500, NE 162nd Ave to Leadbetter Rd Paving

Contract number: 009822
Engineer's estimate: $3,336,413.77
Number of addenda: 3
Number of bidders: 2/2

Award status: awarded 6/10/2022

Preliminary bid total results 

Apparent low: Lakeside Industries, Inc. - $3,424,242.40
Apparent 2nd: Granite Construction Company - $3,499,190.45

Verified bid total results 

Low bidder: Lakeside Industries, Inc.
Bid amount: $3,424,242.40

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Reece Construction - sub - $163,288.65
    Description of work: asphalt milling
  2. Pavement Surface Control - sub - $97,452.70
    Description of work: striping & installation of flexible guide posts
  3. Northwest Traffic Control LLC - sub - $390,139.16
    Description of work: traffic control, construction sign installation, temporary pavement marking
  4. NW Construction General Contracting Inc. - sub - $36,000.00
    Description of work: trucking

DBE goal: $684,848.48
DBE total: $686,880.51

2nd bidder: Granite Construction Company
Bid amount: $3,499,190.45

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. Reece Construction Company - sub - $160.000.00
    Description of work: asphalt milling and street sweeping
  2. Pacific Rim Service and Construction Co. Inc. - sub - $15,282.00
    Description of work: guide posts
  3. Northwest Traffic Control, LLC - sub - $412,551.00
    Description of work: traffic control, class A signs and temporary pavement marking
  4. NW Construction General Contracting Inc. - sub - $117,810.00
    Description of work: dump trucking

DBE goal: $699,838.09
DBE total: $705,643.00

Item no. 4: US 101/SR 115, Olympic Peninsula Chip Seal

Contract number: 009826
Engineer's estimate: $3,846,134.48
Number of addenda: 1
Number of bidders: 2/2

Award status: awarded 6/22/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $5,489,489.00 - rejected 6/10/2022
Apparent 2nd: Doolittle Construction, LLC - $5,974,428.08

Verified bid total results 

Low bidder: Granite Construction Company - rejected 6/10/2022
Bid amount: $5,489,489.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC - sub - $760,500.00
    Description of work: project traffic control
  2. BC Traffic, LLC - sub (force account) - $17,278.54
    Description of work: traffic control for additional broom support (force account)
  3. Pacific Rim Service and Construction Co. Inc. - sub - $74,478.00
    Description of work: flexible guide post removal and installation, barrier delineators
  4. O'Bunco Engineering Int'l, Inc. - sub - $12,500.00
    Description of work: surveying
  5. Michaelis Trucking & Excavating, Inc. - sub - $117,120.00
    Description of work: hauling aggregate and asphalt (partial)
  6. Reece Construction Company - sub - $70,000.00
    Description of work: pavement repair excavation and sweeping (milling)

DBE goal: $1,043,002.91
DBE total: $1,051,876.50

2nd bidder: Doolittle Construction, LLC
Bid amount: $5,974,428.08

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. O'Bunco - sub - $8,000.00
    Description of work: structure surveying
  2. Pavement Surface Control - sub - $89,000.00
    Description of work: flexible guideposts and delineators
  3. Reece - sub - $150,000.00
    Description of work: pavement repair excavation and planing (partial, milling only)
  4. Coat - sub - $900,000.00
    Description of work: partial traffic control, excludes class A signs

DBE goal: $1,135,141.34
DBE total: $1,147,000.00

Item no. 5: SR 520, Evans Creek Temporary Bridge Removal

Contract number: 009827
Engineer's estimate: $1,015,801.52
Number of addenda: 1
Number of bidders: 5/3

Award status: awarded 6/15/2022

Preliminary bid total results 

Apparent low: Accord Contractors LLC - $879,279.00
Apparent 2nd: Shimmick Construction Company, Inc. - $914,825.00
Apparent 3rd: Max J. Kuney Company - $1,171,533.00

Verified bid total results 

Low bidder: Accord Contractors LLC
Bid amount: $879,279.00

Subcontractor named 

  1. Sawtooth Trucking
    Description of work: truck hauling
  2. C&P Fencing
    Description of work: install fencing

Small business enterprise (SBE) 

  1. Accord Contractors, LLC - prime - $826,719.00
    Description of work: complete

SBE goal: $43,963.95
SBE total: $826,719.00

Veteran owned business (VOB)

  1. Sawtooth Trucking - sub - $8,800.00
    Description of work: partial haul dirt in/out

VOB goal: $8,792.79
VOB total: $8,800.00


2nd bidder: Shimmick Construction Company, Inc.
Bid amount: $914,825.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE) 

  1. Seattle Sweeping, Inc. - sub - $8,000.00
    Description of work: street sweeping
  2. M2 Industrial, Inc. – sub - $15,708.00
    Description of work: fencing
  3. Metro Painting LLC – sub - $20,000.00
    Description of work: traffic control
  4. Birch Equipment Company, Inc. – manufacturer/supplier - $2,100.00
    Description of work: equipment rental – partial (selective equipment)

SBE goal: $45,741.25
SBE total: $45,808.00

Veteran owned business (VOB) 

  1. Northwest Linings & Geotextile Products, Inc – manufacturer/supplier - $11,164.46
    Description of work: erosion control (partial) – material supply

VOB goal: $9,148.25
VOB total: $11,164.46

3rd bidder: Max J. Kuney
Bid amount: $1,171,533.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE) 

  1. Grady Excavating, Inc. - sub - $7,800.00
    Description of work: clearing & grubbing
  2. Grady Excavating, Inc. – sub - $38,204.00
    Description of work: rem. struct. & obstruct.
  3. Grady Excavating, Inc. – sub - $2,700.00
    Description of work: backfill
  4. WA Traffic Control – sub - $11,798.00
    Description of work: temp traffic control

SBE goal: $58,576.65
SBE total: $60,502.00

Veteran owned business (VOB) 

  1. Seattle Sweeping, Inc. - sub - $5,950.00
    Description of work: street cleaning
  2. Northwest Linings – manufacturer - $831.00
    Description of work: TESC mat’l supply
  3. Pellco Construction -  sub - $5,000.00
    Description of work: dump trucking

VOB goal: $11,715.33
VOB total: $11,781.00

Item no. 6: SR 17, US 395 to Rd 170 - Paving

Contract number: 009828
Engineer's estimate: $1,499,432.00
Number of addenda: 0
Number of bidders: 3/3

Award status: awarded 6/15/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $1,463,179.57
Apparent 2nd: CPM Development Corporation - $1,949,915.50 - rejected 6/15/2022
Apparent 3rd: Central Washington Asphalt, Inc. - $1,969,000.00

Verified bid total results 

Low bidder: Granite Construction Company
Bid amount: $1,463,179.57

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises I Inc. - sub - $222,000.00
    Description of work: traffic control, rumble strips, temp stripe, recessed pavement markings, guide posts

DBE goal: $219,476.94
DBE total: $222,000.00

2nd bidder: CPM Development Corporation - rejected 6/15/2022
Bid amount: $1,949,915.50

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $295,000.00
    Description of work: flagging, traffic control, temp pavement marking, rumble strips & sign erection

DBE goal: $292,487.32
DBE total: $295,000.00

3rd bidder: Central Washington Asphalt, Inc.
Bid amount: $1,969,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $299,000.00
    Description of work: flagging, traffic control, temp pavement marking & striping, sign erection

DBE goal: $295,350.00
DBE total: $299,000.00

Item no. 7: I-90/SR 26, Interchange Ramps Paving

Contract number: 009819
Engineer's estimate: $1,110,871.50
Number of addenda: 2
Number of bidders: 2/2

Award status: awarded 6/15/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $1,179,937.91
Apparent 2nd: Central Washington Asphalt, Inc. - $1,300,000.00

Verified bid total results 

Low bidder: Granite Construction Company
Bid amount: $1,179,937.91

Subcontractor named 

  1. Knobels Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. dba Pavement Surface - sub - $90,000.00
    Description of work: striping, rumble strips, crack and joint seal, barrier removal/install
  2. TBMM, LLC – sub - $100,000.00
    Description of work: flagging (i.e., traffic control) services

DBE goal: $188,790.07
DBE total: $190,000.00

2nd bidder: Central Washington Asphalt, Inc.
Bid amount: $1,300,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises. Inc. - sub - $209,710.50
    Description of work: flagging, traffic control, temp pavement marking & striping, guide posts, sign erection

DBE goal: $208,000.00
DBE total: $209,710.50

Item no. 8: I-82,Selah Creek Bridge to Yakima Vicinity Paving & Joint Repair 

Contract number: 009820
Engineer's estimate: $5,571,902.18
Number of addenda: 3
Number of bidders: 4/3

Award status: awarded 6/15/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $5,532,854.77**
Apparent 2nd: Central Washington Asphalt, Inc. - $8,490,000.00
Apparent 3rd: Interstate Concrete & Asphalt Company - $9,899,904.08

Verified bid total results 

Low bidder: Granite Construction Company
Bid amount: $5,532,854.76**

Subcontractor named 

  1. Knobels Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Pavement Surface Control - sub - $827,000.00
    Description of work: erosion control, barrier removal/install, crack & joint seal, guideposts, temp/permanent pavement marking, rumble strip, temp signs
  2. Pavement Surface Control – sub force account - $5,000.00
    Description of work: erosion control
  3. North Star Enterprises, Inc. – sub - $59,000.00
    Description of work: sweeping (partial)

DBE goal: $885,256.76
DBE total: $891,000.00

2nd bidder: Central Washington Asphalt, Inc.
Bid amount: $8,490,000.00

Subcontractor named 

  1. Shamrock Traffic, Inc.
    Description of work: rebar

Disadvantaged business enterprise (DBE)

  1. North Star Enterprises, Inc. - sub - $617,000.00
    Description of work: flagging, traffic control, sign erection
  2. Construction Ahead, Inc. dba Pavement Surface – sub - $743,704.75
    Description of work: paint lines, temporary/permanent pavement marking includes: striping, guideposts, barrier removal/install, crack & joint seal, rumble strip

DBE goal: $1,358,400.00
DBE total: $1,360,704.75

3rd bidder: Interstate Concrete & Asphalt Company
Bid amount: $9,899,904.08

Subcontractor named 

  1. Combined Construction
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. – sub – $784,825.75
    Description of work: crack + joint seal, erosion control, barrier, guideposts, temp + perm pavement marking, sign erection/cover
  2. North Star Enterprises, Inc. - sub – 799,158.90
    Description of work: flagging, traffic control

DBE goal: $1,583,984.65
DBE total: $1,583,984.65
 

5/18/2022 bid opening - Olympia, WA

Item no. 1: SR 99, Duwamish River to S Spokane St Vic Paving & ADA Compliance

Contract number: 009804
Engineer's estimate: $2,590,156.00
Number of addenda: 1
Number of bidders: 3/2

Award status: awarded 6/7/2022

Preliminary bid total results 

Apparent low: Tucci & Sons, Inc. - $3,681,888.00
Apparent 2nd: Lakeside Industries, Inc. - $3,838,300.00**

Verified bid total results 

Low bidder: Tucci & Sons, Inc.
Bid amount: $3,681,888.00

Subcontractor named 

  1. Totem Electric of Tacoma, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $291,000.00
    Description of work: traffic control
  2. Lee's Demolition, LLC - sub - $213,000.00
    Description of work: lowering/raising utilities and sidewalk removal and prep
  3. Reece Construction Company - sub - $122,000.00
    Description of work: bituminous planing
  4. The Bag Lady - sub - $6,300.00
    Description of work: erosion control
  5. WE Coates Surveying - sub - $37,950.00
    Description of work: construction surveying

DBE goal: $622,739.84
DBE total: $670,250.00

2nd bidder: Lakeside Industries, Inc.
Bid amount: $3,838,300.90**

Subcontractor named 

  1. Totem Electric of Tacoma, Inc.
    Description of work: electrical 50, 62 and 78

Disadvantaged business enterprise (DBE) 

  1. Reece Construction - sub - $125,000.00
    Description of work: planing
  2. O'Bunco Engineering - sub - $34,735
    Description of work: survey
  3. Advanced Traffic Control - sub - $325,000.00
    Description of work: traffic control
  4. Lee's Demolition, LLC - sub - $170,000.00
    Description of work: concrete demo, subgrade preparation & road construction
  5. J & G Concrete Corp. - sub - $40,000.00
    Description of work: concrete

DBE goal: $690,894.16
DBE total: $694,736.00

Item no. 2: SR 241/I-82, North of Sunnyside and I-82 I/C - Paving

Contract number: 009817
Engineer's estimate: $3,955,541.45
Number of addenda: 2
Number of bidders: 3/3

Award status: awarded 6/7/2022

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $4,734,227.45
Apparent 2nd: Granite Construction Company - $5,187,338.10
Apparent 3rd: Central Washington Asphalt, Inc. - $5,424,000.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $4,734,227.45

Subcontractor named 

  1. Knobel's Electric
    Description of work: BI 48 - electrical 
  2. Combined Construction
    Description of work: BI 9 (rebar) bridge approach slab

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead dba Pavement Surface Control - sub - $207,343.35
    Description of work: joint seal, paint lines, permanent pavement marking, rumble strips
  2. Northwest Traffic Control, LLC - sub - $502,564.01
    Description of work: temp pvmnt marking, traffic control, flagging, PCMS, traffic control devices, atennuator, arrow board, class A signs
  3. Pacific Rim Service and Construction Co. - sub - $39,043.00
    Description of work: installation & supply guardrail and posts/blocks, barrier delineator, guide posts
  4. O'Bunco Engineering - sub - $8,885.00
    Description of work: construction surveying

DBE goal: $757,476.39
DBE total: $757,835.36

2nd bidder: Granite Construction Company
Bid amount: $5,187,338.10

Subcontractor named 

  1. Knobel's Electric, Inc.
    Description of work: electrical
  2. Harris Rebar Columbia Basin, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Pavement Surface Control - sub - $404,475.40
    Description of work: paint lines, pavement marking, guide posts, rumble strips, crack & joint seal
  2. BC Traffic, LLC - sub - $431,953.00
    Description of work: flagging and traffic control management

DBE goal: $829,974.09
DBE total: $836,428.40

3rd bidder: Central Washington Asphalt, Inc.
Bid amount: $5,424,000.00

Subcontractor named 

  1. Sierra Electric, Inc.
    Description of work: electrical/illumination 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $594,980.00
    Description of work: flagging, traffic control
  2. Construction Ahead, Inc. dba Pavement Surface - sub - $284,063.40
    Description of work: paint lines, temporary/permanent marking includes: striping, guideposts, rumble strips, crack & joint seal

DBE goal: $867,840.00
DBE total: $879,043.40

Item no. 3: I-5/US 101, Mcallister Creek & Mud Bay Bridges – Repair Bridge Piles

Contract number: 009808
Engineer's estimate: $1,058,126.20
Number of addenda: 3
Number of bidders: 8/3

Award status: awarded 6/9/2022

Preliminary bid total results 

Apparent low: Selby Bridge Company, Inc. - $670,352.00
Apparent 2nd: Massana Construction, Inc. - $1,125,437.00
Apparent 3rd: Rognlin's, Inc. - $1,900,217.00

Verified bid total results 

Low bidder: Selby Bridge Company, Inc.
Bid amount: $670,352.00

Subcontractor named 

None proposed
Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. The Traffic Control Co., Inc. - sub - $123,510.00
    Description of work: traffic control
  2. The Bag Lady - sub - $3,857.00
    Description of work: erosion control

DBE goal: $127,366.88
DBE total: $127,367.00

2nd bidder: Massana Construction, Inc.
Bid amount: $1,125,437.00

Subcontractor named 

  1. Massana Construction, Inc.
    Description of work: self perform

Disadvantaged business enterprise (DBE) 

  1. CGM Dirt Works LLC, dba CGM Dirt Works - sub - $214,120.00
    Description of work: site prep, grading, rip rap import and install, export aggregate materials, high-vis fence

DBE goal: $213,833.03
DBE total: $214,120.00

3rd bidder: Rognlin's, Inc.
Bid amount: $1,900,217.00

Subcontractor named 

  1. Rognlin's, Inc.
    Description of work: plumbing
  2. Rognlin's, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $188,000.00
    Description of work: traffic control services
  2. Northwest Grouting LLC - sub - $174,300.00
    Description of work: grouting (reinforcing with concrete)

DBE goal: $361,041.23
DBE total: $362,300.00

Item no. 4: I-90, Cabin Creek I/C to W Easton I/C Phase 3 - Add Lanes/Wildlife Bridges

Contract number: 009786
Engineer's estimate: Base + A1: $251,592,949.00
Engineer's estimate: Base + A2: $249,346,179.00
Number of addenda: 8
Number of bidders: 8/5

Award status: awarded 6/22/2022

Preliminary bid total results 

Apparent low: Scarsella Bros., Inc. - $285,464,518.80
Apparent 2nd: Skanska USA Civil West California District Inc. - $311,900,000.00
Apparent 3rd: Graham Contracting, Ltd. - $325,000,000.00 - rejected 6/16/2022

Verified bid total results 

Low bidder: Scarsella Bros., Inc.
Bid amount: $285,464,518.80

Subcontractor named 

  1. Elcon Corporation
    Description of work: electrical 
  2. SB Structures, LLC
    Description of work: structural steel 
  3. Rebar International
    Description of work: reinforcing steel  

Small business enterprise (SBE) 

  1. Construction Ahead Inc. dba Pavement Surface Control - sub - $14,503,133.45
    Description of work: mob (partial), barrier rem., rem. striping, permanent barrier, temp. barrier, guide posts, delineators, paint line, rumble strips, snow pole, perm. signs

SBE goal: $14,273,225.94
SBE total: $14,503,133.45

Veteran-owned business (VOB) 

  1. M2 Industrial, Inc. - sub - $8,295,197.50
    Description of work: guardrail removal, guardrail, cable fence, wildlife fence, wire fence, gates
  2. Northwest Linings - manufacturer - $300,000.00
    Description of work: erosion control material, supply, geotextile supply

VOB goal: $8,563,935.54
VOB total: $8,595,197.50

2nd bidder: Skanska USA Civil West California District Inc.
Bid amount: $311,900,000.00

Subcontractor named 

  1. Stetner
    Description of work: electrical/illumination
  2. Pacific Steel Group
    Description of work: furnish and install rebar
  3. Michels
    Description of work: structural steel - furnish and install soldier piles

Small business enterprise (SBE) 

  1. Grady Excavating Inc. - sub - $15,963,845.00
    Description of work: partial, roadway excavation excluding fine grade
  2. Grady Excavating Inc. - sub - $3,011,295.00
    Description of work: partial, embankment compaction excluding fine grade and water

SBE goal: $15,595,000.00
SBE total: $18,974,140.00

Veteran-owned business (VOB) 

  1. M2 Industrial - sub - $1,028,868.00
    Description of work: guardrail
  2. M2 Industrial - sub - $7,419,202.00
    Description of work: fencing, gates
  3. M2 Industrial - sub - $43,250.00
    Description of work: partial, remove wire and cable fence
  4. JJH Earthworks, LLC - sub - $3,598,890.00
    Description of work: large woody material salvage, streambed, habitat, rock for erosion and scour protection, streambed test sections
  5. JJH Earthworks, LLC - sub - $305,028.00
    Description of work: large woody material, boulder anchor

VOB goal: $9,357,000.00
VOB total: $12,395,238.00

3rd bidder: Graham Contracting, Ltd. - rejected 6/16/2022
Bid amount: $325,000,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE) 

  1. Construction Ahead, Inc. - sub - $10,000,000.00
    Description of work: barrier
  2. Grady Excavating, Inc. - sub - $8,000,000.00
    Description of work: construction, highway and road

SBE goal: $16,250,000.00
SBE total: $18,000,000.00

Veteran-owned business (VOB) 

  1. M2 Industrial, Inc. - sub - $8,000,000.00
    Description of work: fence & guardrail
  2. JJH Earthworks - sub - $2,000,000.00
    Description of work: site work

VOB goal: $9,750,000.00
VOB total: $10,000,000.00

5/11/2022 bid opening - Olympia, WA

Item no. 1: SR 9, SR 204 Intersection Improvements (Stage 3)

Contract number: 009801
Engineer's estimate: $17,157,416.25
Number of addenda: 2
Number of bidders: 6/5

Award status: awarded 5/26/2022

Preliminary bid total results 

Apparent low: Interwest Construction, Inc. - $14,088,088.00
Apparent 2nd: Walsh Construction Company II, LLC - $14,299,286.72**
Apparent 3rd: Marshbank Construction Inc. - $18,863.104.00**

Verified bid total results 

Low bidder: Interwest Construction, Inc.
Bid amount: $14,088,088.00

Subcontractor named 

  1. Service Electric Co. Inc.
    Description of work: electrical
  2. Interwest Construction Inc. - self perform
    Description of work: structural steel installation
  3. Rebar International Inc.
    Description of work: rebar installation  

2nd bidder: Walsh Construction Company II, LLC
Bid amount: $14,299,286.71**

Subcontractor named 

  1. Rebar International Inc.
    Description of work: rebar installation
  2. Valley Electric Co. of Mt. Vernon Inc.
    Description of work: electrical 

3rd bidder: Marshbank Construction Inc.
Bid amount: $18,850,822.00**

Subcontractor named 

  1. Stetner Construction Group
    Description of work: electrical
  2. Rebar International Inc.
    Description of work: rebar

Item no. 2: I-5, Kincaid Sign Structure Replacement (Small Works Roster)

Contract number: 009814
Engineer's estimate: $247,159.00
Number of addenda: 1
Number of bidders: 2/2

Award status: awarded 6/14/2022

Preliminary bid total results 

Apparent low: Massana Construction, Inc. - $269,758.00 - rejected 5/26/2022
Apparent 2nd: Northeast Electric, LLC - $336,434.00

Verified bid total results 

Low bidder: Massana Construction, Inc. - rejected 5/26/2022
Bid amount: $269,758.00

Small business enterprise (SBE)  

  1. Versatile Drilling Contractors, Inc. - sub - $34,475.00
    Description of work: cantiliver sign structure No. 1, (partial) foundation shaft drilling

SBE goal: $13,487.90
SBE total: $34,375.00

Veteran-owned business (VOB)  

  1. Versatile Drilling Contractors, Inc. - sub - $34,475.00
    Description of work: cantiliver sign structure No. 1, (partial) foundation shaft, drilling  

VOB goal: $2,697.58
VOB total: $34,375.00

2nd bidder: Northeast Electric, LLC
Bid amount: $336,434.00

Small business enterprise (SBE)  

  1. Hughes Group, LLC - sub - $25,849.92
    Description of work: TCS & labor/driver

SBE goal: $16,821.70
SBE total: $25,849.92

Veteran-owned business (VOB)  

  1. Hughes Group, LLC - sub - $13,879.28
    Description of work: TC devices & equipment

VOB goal: $3,364.34
VOB total: $13,879.28

Item no. 3: I-90, Oakes Ave I/C to Yakima River Bridge Replace Concrete Panels 

Contract number: 009813
Engineer's estimate: $8,598,995.16
Number of addenda: 2
Number of bidders: 5/2

Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Gary Merlino Construction Co., Inc. - $8,655,673.00
Apparent 2nd: Acme Concrete Paving, Inc. - $10,595,155.00

Verified bid total results 

Low bidder: Gary Merlino Construction Co., Inc.
Bid amount: $8,655,673.00

Subcontractor named 

  1. Prime Electric, Inc.
    Description of work: electrical  
  2. PSF Mechanical
    Description of work: HVAC  
  3. PSF Mechanical
    Description of work: plumbing  
  4. Gary Merlino Construction Co., Inc.
    Description of work:  structural steel
  5. Gary Merlino Construction Co., Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE)  

  1. Pavement Surface Control - sub - $111,000.00
    Description of work: permanent pavement marking
  2. Pavement Surface Control - sub - $770,000.00
    Description of work: crack & joint seal

DBE goal: $865,567.30
DBE total: $881,000.00

2nd bidder: Acme Concrete Paving, Inc.
Bid amount: $10,595,155.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE)  

  1. Advanced Traffic Control - sub - $1,100,000.00
    Description of work: traffic control

DBE goal: $1,059,515.50
DBE total: $1,100,000.00

Item no. 4: 2022 OR Region Wide Chip Seal

Contract number: 009816
Engineer's estimate: $5,130,564.00
Number of addenda: 1
Number of bidders: 2/2

Award status: awarded 6/13/2022

Preliminary bid total results 

Apparent low: Doolittle Construction, LLC - $6,863,401.20
Apparent 2nd: Granite Construction Company - $7,325,325.00

Verified bid total results 

Low bidder: Doolittle Construction, LLC
Bid amount: $6,863,401.20

Subcontractor named 

  1. None proposed
    Description of work: none proposed  

Small business enterprise (SBE)  

  1. AVC Consulting & Supply - sub - $46,025.00
    Description of work: inlet protection
  2. AVC Consulting & Supply - sub - $2,500.00
    Description of work: erosion control
  3. AVC Consulting & Supply - sub - $248,690.00
    Description of work: class A signs
  4. AVC Consulting & Supply - sub - $8,350.00
    Description of work: roadside cleanup
  5. T&T Traffic Control - sub - $190,000.00
    Description of work: temporary traffic control
  6. Seattle Sweeping - sub - $10,000.00
    Description of work: roadway sweeping

SBE goal: $343,170.06
SBE total: $505,565.00

Veteran-owned business (VOB)  

  1. None proposed
    Description of work: none proposed 

VOB goal: $137,268.02
VOB total: $0.00

2nd bidder: Granite Construction Company
Bid amount: $7,325,325.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)  

  1. BC Traffic LLC - sub - $450,000.00
    Description of work: project traffic control (excluding class A signs)

SBE goal: $366,266.25
SBE total: $450,000.00

Veteran-owned business (VOB)  

  1. Marwood General Construction - sub - $87,300.00
    Description of work: dump trucking - chip rock
  2. Seattle Sweeping, Inc. - sub - $48,600.00
    Description of work: sweeping
  3. Seattle Sweeping, Inc. - sub - $19,980.00
    Description of work: additional brooming

VOB goal: $146,506.50
VOB total: $155,880.00

5/4/2022 bid opening - Olympia, WA

Item no. 1: US 2, Stevens Pass East - Paving

Contract number: 009806
Engineer's estimate: $6,110,748.25
Number of addenda: 2
Number of bidders: 3/3

Award status: awarded 5/26/2022

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $7,467,584.00
Apparent 2nd: Central Washington Asphalt, Inc. - $9,366,000.00
Apparent 3rd: Granite Construction Company - $9,778,768.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $7,467,584.00 

Subcontractor named 

  1. Neppel Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Pro Eagle Trucking - sub - $41,760.00
    Description of work: water truck with operator
  2. Changing Directions - sub - $683,720.00
    Description of work: traffic control services
  3. Neppel Electric & Controls LLC - sub - $35,000.00
    Description of work: install electrical equipment
  4. Reece Trucking & Excavating - sub - $359,733.80
    Description of work: asphalt milling
  5. M2 Industrial - sub - $36,184.00
    Description of work: concrete barrier impact attenuator
  6. North Star Enterprises - sub - $176,950.00
    Description of work: guide posts, rumble strips, pavement marking
  7. O'Bunco - sub - $56,440.11
    Description of work: construction surveying
  8. Audi Construction - sub - 35,000.00
    Description of work: dump trucking
  9. Hawn Trucking LLC - sub - $68,730.00
    Description of work: dump trucking

DBE goal: $1,493,516.80
DBE total: $1,493,517.91

2nd bidder: Central Washington Asphalt, Inc.
Bid amount: $9,366,000.00

Subcontractor named 

  1. Neppel Electric & Controls, LLC
    Description of work: electrical / illumination

Disadvantaged business enterprise (DBE) 

  1. Changing Directions - sub - $748,690.15
    Description of work: traffic control services and temporary pavement markings
  2. Construction Ahead, Inc. dba Pavement Surface Control - sub - $1,132,544.50
    Description of work: paint lines, permanent marking includes: striping, guideposts, rumble strips, barrier removal/install

DBE goal: $1,873,200.00
DBE total: $1,881,234.65

3rd bidder: Granite Construction Company
Bid amount: $9,778,768.00

Subcontractor named 

1. Neppel Electric & Controls LLC
Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $612,640.92
    Description of work: traffic control and temporary pavement marking
  2. Pavement Surface Control - sub - $1,375,114.58
    Description of work: permanent pavement marking, guideposts, rumble strips, temp barrier removal/install, crach and joint seal

DBE goal: $1,955,753.60
DBE total: $1,987,755.50

Item no. 2: SR 500, NE 182nd Ave Intersection Improvements

Contract number: 009807
Engineer's estimate: $1,511,740.00
Number of addenda: 2
Number of bidders: 5/3

Award status: awarded 5/12/2022

Preliminary bid total results 

Apparent low: Thompson Bros. Excavating, Inc. - $1,599,374.50
Apparent 2nd: Advanced Excavating Specialists, LLC - $1,599,847.30
Apparent 3rd: McDonald Excavating, Inc. - $1,871,421.00 - rejected 5/12/2022

Verified bid total results 

Low bidder: Thompson Bros. Excavating, Inc.
Bid amount: $1,599,374.50

Subcontractor named 

  1. Scheider & Sons, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial Inc. - sub - $55,365.00
    Description of work: guardrail
  2. Schneider & Sons, Inc. - sub - $235,738.00
    Description of work: electrical, illumination & signage

DBE goal: $287,887.41
DBE total: $291,098.00

2nd bidder: Advanced Excavating Specialists, LLC
Bid amount: $1,599,847.30

Subcontractor named 

  1. Schneider & Sons, Inc.
    Description of work: electrical
  2. Schneider & Sons, Inc.
    Description of work: rebar installation
  3. Schneider & Sons, Inc.
    Description of work: structural steel

Disadvantaged business enterprise (DBE) 

  1. The Bag Lady - sub - $39,058.50
    Description of work: erosion control
  2. M2 Industrial - sub - $55,365.00
    Description of work: guardrail
  3. Schneider & Sons, Inc. - sub - $203,500.00
    Description of work: electrical

DBE goal: $287,972,51
DBE total: $297,923.50

3rd bidder: McDonald Excavating, Inc. - rejected 5/12/2022
Bid amount: $1,871,421.00

Subcontractor named 

  1. NE Electric
    Description of work: lighting/electrical 
  2. Hildebrand Concrete
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. McDonald Excavating - prime - $374,284.00
    Description of work: street construction, excavating earth moving & land clearing, grading construction sites

DBE goal: $336,855.78
DBE total: $374,284.00

Item no. 3: I-5, 21-23 SWR Regionwide Bridges Concrete Deck Patching

Contract number: 009812
Engineer's estimate: $1,622,910.00
Number of addenda: 1
Number of bidders: 5/2

Award status: awarded 6/7/2022

Preliminary bid total results 

Apparent low: M.J. Hughes Construction, Inc. - $2,539,239.63 - rejected 5/26/2022
Apparent 2nd: Granite Construction Company - $2,899,000.00

Verified bid total results 

Low bidder: M.J. Hughes Construction, Inc.  - rejected 5/26/2022
Bid amount: $2,539,239.63

Subcontractor named 

  1. M.J. Hughes Construction
    Description of work: structural steel installation and rebar installation

Disadvantaged business enterprise (DBE) 

  1. D&H Flagging - sub - $440,000.00
    Description of work: traffic control

DBE goal: $431,670,74
DBE total: $440,000.00

2nd bidder: Granite Construction Company
Bid amount: $2,899,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC, dba Budman Construction - sub - $500,000.00
    Description of work: traffic control

DBE goal: $492,830.00
DBE total: $500,000.00

Item no. 4: US 97 ET AL, 2022 SCR Region Wide Chip Seal

Contract number: 009815
Engineer's estimate: $4,159,340.28
Number of addenda: 1
Number of bidders: 3/3

Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $4,969,063.42
Apparent 2nd: Granite Construction Company - $5,012,750.50
Apparent 3rd: Central Washington Asphalt, Inc. - $5,675,000.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $4,969,063.42

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. - sub - $655,339.10
    Description of work: crack seal, guideposts, rumble strips, paint line, pavement marking (permanent)
  2. O'Bunco - sub - $5,560.00
    Description of work: construction surveying
  3. North Star Enterprises - sub - $284,000.00
    Description of work: temp. pavement marking, traffic control, sign erection

DBE goal: $944,122.05
DBE total: $944,899.10

2nd bidder: Granite Construction Company
Bid amount: $5,012,750.50

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $518,000.00
    Description of work: traffic control, temporary pavement markings
  2. Pavement Surface Control - sub - $444,465.00
    Description of work: crack and joint seal, guideposts, rumble strips, pavement markings, paint lines

DBE goal: $952,422.60
DBE total: $962,465.00

3rd bidder: Central Washington Asphalt, Inc.
Bid amount: $5,675,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $800,075.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, removal & installations (i.e., temp & paint stripes)
  2. Construction Ahead, Inc. dba Pavement Surface - sub - $285,679.10
    Description of work: paint lines, permanent pavement marking includes: striping, guideposts

DBE goal: $1,078,250.00
DBE total: $1,085,754.10

Item no. 5: SR 14, I-205 to SE 164th Avenue Auxiliary Lanes

Contract number: 009800
Max funds available: $18,500,000.00
Engineer's estimate: $18,191,934.75
Number of addenda: 2
Number of bidders: 7/3

Award status: awarded 5/9/2022

Preliminary bid total results 

Apparent low: Rotschy, Inc. - $17,122,823.75
Apparent 2nd: Selby Bridge Company, Inc. - $18,491,946.64
Apparent 3rd: Goodfellow Bros. LLC - $18,916,068.11 - rejected 5/6/2022

Verified bid total results 

Low bidder: Rotschy, Inc.
Bid amount: $17,122,823.75

Subcontractor named 

  1. Mill Plain Electric
    Description of work: electrical
  2. Rotschy, Inc. - self perform
    Description of work: structural steel installation scope
  3. Pacific Steel Group
    Description of work: rebar installation 

2nd bidder: Selby Bridge Company, Inc.
Bid amount: $18,491,946.64

Subcontractor named 

  1. Bar-M Steel Commercial
    Description of work: rebar installation
  2. Mill Plain Electric
    Description of work: electrical 

3rd bidder: Goodfellow Bros. LLC - rejected 5/6/2022
Bid amount: $18,916,068.11

Subcontractor named 

  1. Mill Plain 
    Description of work: ITS, sign bridges, illumination system, permanent signage

Item no. 6: SR 3, Belfair Area Driveway Revision (small works roster)

Contract number: 009818
Engineer's estimate: $133,793.00
Number of addenda: 0
Number of bidders: 6/5

Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Massana Construction, Inc. - $119,494.00
Apparent 2nd: Oma Construction, Inc. - $138,673.00
Apparent 3rd: Rognlin's, Inc. - $188,811.00

Verified bid total results 

Low bidder: Massana Construction, Inc.
Bid amount: $119,494.00

2nd bidder: Oma Construction, Inc.
Bid amount: $138,673.00

3rd bidder: Rognlin's, Inc.
Bid amount: $188,811.00

4/27/2022 bid opening - Olympia, WA

Item no. 1: US 2, East of Leavenworth Slope Stabilization (small works roster)

Contract number: 009802
Engineer's estimate: $192,850.50
Number of addenda: 0
Number of bidders: 4/2

Award status: awarded 5/9/2022

Preliminary bid total results 

Apparent low: Scarsella Bros. Inc. - $259,650.50
Apparent 2nd: Rock Supremacy LLC - $299,979.00 - rejected 5/6/2022

Verified bid total results 

Low bidder: Scarsella Bros. Inc.
Bid amount: $259,650.50

Disadvantaged business enterprise (DBE) 

  1. Pavement Surface Control - sub - $31,180.00
    Description of work: barrier removal/install, temporary sign erection

DBE goal: $31,158.06
DBE total: $31,180.00

2nd bidder: Rock Supremacy LLC - rejected 5/6/2022
Bid amount: $299,979.00

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - sub - $7,464.00
    Description of work: portable changeable message signs
  2. North Star Enterprises - sub - $24,000.00
    Description of work: other temporary traffic control/mobilization
  3. North Star Enterprises - sub - $19,162.00
    Description of work: flaggers
  4. North Star Enterprises - sub - $10,725.00
    Description of work: other traffic control labor
  5. North Star Enterprises - sub - $6,000.00
    Description of work: construction signs Class A

DBE goal: $35,997.48
DBE total: $67,351.00

Item no. 2: I-5, Dike Access W Br MP 22.7 & BNRR Br MP 26 – Painting

Contract number: 009805
Engineer's estimate: $3,732,165.80
Number of addenda: 0
Number of bidders: 10/7

Award status: awarded 6/3/2022

Preliminary bid total results 

Apparent low: Amari Painting & Lining LLC - $3,152,904.00 - rejected 5/20/2022
Apparent 2nd: Purcell P & C, LLC dba Purcell Painting & Coatings - $3,432,264.00 - rejected 5/20/2022
Apparent 3rd: Liberty Maintenance, Inc. - $3,754,000.00 - rejected 5/20/2022

Verified bid total results 

Low bidder: Amari Painting & Lining LLC - rejected 5/20/2022
Bid amount: $3,152,904.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Atlantic Petroleum & Mineral Resources, Inc., dba Atlantic Petroleum - sub - $150,000.00
    Description of work: cleaning and painting paint steel bridge 5/104W (partial), cleaning and painting paint steel bridge 5/105W (partial) - provide fuel and lubricant for equipment
  2. Schneider & Son, Inc., dba Schneider & Son - sub - $200,000.00
    Description of work: project temporary traffic control (partial) - provide traffic control services and equipment

DBE goal: $630,581.00
DBE total: $350,000.00

Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract. 

2nd bidder: Purcell P & C, LLC dba Purcell Painting & Coatings - rejected 5/20/2022
Bid amount: $3,432,264.00

Subcontractor named 

  1. AGS Traffic Control
    Description of work: traffic control, attentuator repair 
  2. NI Painting Construction Company
    Description of work: cleaning and painting

Disadvantaged business enterprise (DBE) 

  1. NI Painting - sub - $450,000.00
    Description of work: cleaning and painting
  2. Advanced Government Services - sub - $250,000.00
    Description of work: attentuator and traffic control

DBE goal: $686,452.80
DBE total: $700,000.00

3rd bidder: Liberty Maintenance, Inc. - rejected 5/20/2022
Bid amount: $3,754,000.00

Subcontractor named 

  1. Combined Construction, Inc.
    Description of work: structural low alloy steel, replace vacant/damaged/loose bolts with HS bolt steel repairs
  2. Structural Coatings, Inc.
    Description of work: install/dismantle work platforms
  3. Northern Resource Consulting, Inc.
    Description of work: staging area, environmental work and various plans

Disadvantaged business enterprise (DBE) 

  1. Northern Resource Consulting, Inc. - sub - $250,000.00
    Description of work: setup & remove optional staging area bridge 5105W
  2. Structural Coating, Inc. - sub - $575,000.00
    Description of work: install & remove work platform/shield bridge 5105W & 5104W

DBE goal: $750,800.00
DBE total: $825,000.00

4/20/2022 bid opening - Olympia, WA

Item no. 1: Dusty to Colfax Add Climbing Lanes

Contract number: 009803
Base engineer's estimate: $4,425,420.10
Base + A1 engineer's estimate: $5,901,635.10
Funds available: $6,266,135.10
Number of addenda: 3
Number of bidders: 5/3

Award status: awarded 4/28/2022

Preliminary bid total results 

Apparent low: Shamrock Paving, Inc. - $5,548,000.00 (base), $7,442,000.00 (base + A1)
Apparent 2nd: Scarsella Bros. Inc. - $5,885,872.11 (base), **$8,157,958.54 (base + A1)
Apparent 3rd: M. A. Deatley Construction, Inc. - $6,235,955.10 (base), $8,418,031.10 (base + A1)

Verified bid total results 

Low bidder: Shamrock Paving, Inc.
Bid amount: $5,548,000.00 (base), $7,442,000.00 (base + A1)

Subcontractor named 

  1. None proposed
    Description of work: none proposed

2nd bidder: Scarsella Bros. Inc.
Bid amount: $5,885,872.11 (base), **$8,157,958.54 (base + A1)

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

3rd bidder: M. A. Deatley Construction, Inc.
Bid amount: $6,235,955.10 (base), $8,418,031.10 (base + A1)

Subcontractor named 

  1. Johnson Electrical Contracting
    Description of work: electrical

4/13/2022 bid opening - Olympia, WA

Item no. 1: 2021 OR Region Wide Safety Features - Signing

Contract number: 009797
Engineer's estimate: $739,927.00
Number of addenda: 0
Number of bidders: 2/2

Award status: awarded 4/21/2022

Preliminary bid total results 

Apparent low: Construction Ahead, Inc. dba Pavement Surface Control - $716,052.00
Apparent 2nd: Massana Construction, Inc. - $736,077.00

Verified bid total results 

Low bidder: Construction Ahead, Inc. dba Pavement Surface Control
Bid amount: $716,052.00

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. dba Pavement Surface Control - prime - $102,200.00
    Description of work: temp & perm non-electrical sign erection

DBE goal: $100,247.28
DBE total: $102,200.00

2nd bidder: Massana Construction, Inc.
Bid amount: $736,077.00

Disadvantaged business enterprise (DBE) 

  1. Traffic Control Co., Inc - sub - $103,051.00
    Description of work: temporary traffic control (partial) flagging, other traffic control labor, traffic control supervisor, sequential & PCMS boards, temp. devices and signs

DBE goal: $103,050.78
DBE total: $103,051.00

Item no. 2: SR 20, Rocky Creek to Granite Creek BST

Contract number: 009796
Engineer's estimate: $7,467,042.04
Number of addenda: 1
Number of bidders: 3/2

Award status: awarded 5/9/2022

Preliminary bid total results 

Apparent low: Granite Construction Company - $8,305,490.70**
Apparent 2nd: Lakeside Industries, Inc. - $11,937,003.00 - rejected 5/6/2022

Verified bid total results 

Low bidder: Granite Construction Company 
Bid amount: $8,305,490.70**

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC - sub - $950,000.00
    Description of work: flagging and traffic control management
  2. Pavement Surface Control - sub - $555,000.00
    Description of work: temporary/permanent pavement marking, rumble strips, guideposts
  3. Reece Construction Company - sub - $80,000.00
    Description of work: asphalt milling

DBE goal: $1,578,043.23
DBE total: $1,585,000.00

2nd bidder: Lakeside Industries, Inc. - rejected 5/6/2022
Bid amount: $11,937,003.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Reece Trucking & Excavating - sub - $250,000.00
    Description of work: asphalt concrete crushing and grinding
  2. Budiman Construction - sub - $1,050,000.00
    Description of work: flagging (ie, traffic control) services
  3. Pavement Surface Control - sub - $1,000,000.00
    Description of work: sign erection, highway, road, street or bridge

DBE goal: $2,268,030.57
DBE total: $2,300,000.00

Item no. 3: SR 163, Tahlequah Ferry Terminal - Facility ADA Compliance Improvements (small works roster)

Contract number: 009785
Engineer's estimate: $305,920.45
Number of addenda: 0
Number of bidders: 3/2

Award status: awarded 5/4/2022

Preliminary bid total results 

Apparent low: Northwest Cascade, Inc. - $462,794.00
Apparent 2nd: Combined Construction, Inc. - $601,084.00

Verified bid total results 

Low bidder: Northwest Cascade, Inc.
Bid amount: $462,794.00

2nd bidder: Combined Construction, Inc.
Bid amount: $601,084.00

Item no. 4: I-90, Bridge Deck Preventative Preservation - Patching

Contract number: 009798
Engineer's estimate: $1,590,673.00
Number of addenda: 0
Number of bidders: 3/1

Award status: awarded 4/21/2022

Preliminary bid total results 

Apparent low: Shamrock Paving, Inc. - $2,929,292.00

Verified bid total results 

Low bidder: Shamrock Paving, Inc.
Bid amount: $2,929,292.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. dba North Star Enterprises I, Inc. - sub - $440,910.00
    Description of work: flagging, traffic control

DBE goal: $439,393.80
DBE total: $440,910.00

Item no. 5: SR 18, SR 99, SR 516, Jenkins Ck Vic & Tukwila Vic & SR 181 Vic Paving & Deck Rehab & ADA

Contract number: 009781
Engineer's estimate: $9,172,999.98
Number of addenda: 3
Number of bidders: 4/4

Award status: awarded 4/28/2022

Preliminary bid total results 

Apparent low: Tucci & Sons, Inc. - $8,793,457.60
Apparent 2nd: Lakeside Industries, Inc. - $9,608,261.50
Apparent 3rd: Miles Resources, LLC - $9,898,921.50

Verified bid total results 

Low bidder: Tucci & Sons, Inc.
Bid amount: $8,793,457.60

Subcontractor named 

  1. G & G, Inc.
    Description of work: electrical
  2. Combined Construction
    Description of work: rebar
  3. Combined Construction
    Description of work: structural steel

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $734,000.00
    Description of work: traffic control services
  2. G & G, Inc. - sub - $359,800.00
    Description of work: electrical contracting
  3. Pacific Rim Service and Construction Company, Inc. - sub - $40,765.00
    Description of work: installation of guardrail barrier & guide posts
  4. O'Bunco Engineering & International - sub - $48,645.00
    Description of work: land surveying
  5. Reece Construction Company - sub - $261,500.00
    Description of work: asphalt milling
  6. Tunista Construction LLC - sub - $110,000.00
    Description of work: dump trucking
  7. The Bag Lady - sub - $31,091.00
    Description of work: erosion control

DBE goal: $1,582,822.36
DBE total: $1,585,801.00

2nd bidder: Lakeside Industries, Inc.
Bid amount: $9,608,261.50

Subcontractor named 

  1. G & G, Inc.
    Description of work: electrical
  2. Jonnic Construction LLC
    Description of work: structural steel, rebar

Disadvantaged business enterprise (DBE) 

  1. Reece Construction - sub - $270,000.00
    Description of work: planing bituminous pavement (partial) - grinding, pavement repair excavation (partial) - grinding
  2. G & G, Inc. - sub - $349,000.00
    Description of work: electrical
  3. J & G Concrete Corp. - sub - $75,000.00
    Description of work: concrete paving
  4. O'Bunco Engineering - sub - $48,645.00
    Description of work: surveying
  5. Advanced Traffic Control - sub - $920,000.00
    Description of work: traffic control
  6. The Bag Lady, Inc. - sub - $30,000.00
    Description of work: erosion control
  7. Pacific Rim Service & Construction Co, Inc. - sub - $40,000.00
    Description of work: guardrail

DBE goal: $1,729,487.07
DBE total: $1,732,645.00

3rd bidder: Miles Resources, LLC
Bid amount: $9,898,921.50

Subcontractor named 

  1. G & G, Inc.
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $809,241.00
    Description of work: traffic control
  2. G & G, Inc. - sub - $364,000.00
    Description of work: electrical
  3. J & G Concrete Corporation - sub - $58,497.00
    Description of work: concrete
  4. O'Bunco Engineering - sub - $48,645.00
    Description of work: surveying
  5. Pacific Rim Service & Construction Co., Inc. - sub - $36,983.50
    Description of work: guardrail
  6. Reece Construction Company - sub - $292,405.20
    Description of work: planing bituminous pavement (partial)
  7. The Bag Lacey, Inc. - sub - $31,091.00
    Description of work: erosion control
  8. Tunista Construction LLC - sub - $154,976.00
    Description of work: dump trucking (partial)

DBE goal: $1,781,805.87
DBE total: $1,795,838.70
 

4/6/2022 bid opening - Olympia, WA

Item no. 1: May Cr In Vic Of Dowans Ck Rd Ground Anchor Load Testing

Contract number: 009789
Engineer's estimate: $615,612.82
Number of addenda: 0
Number of bidders: 5/3

Award status: awarded 4/21/2022

Preliminary bid total results 

Apparent low: Interwest Construction, Inc. - $891,587.10
Apparent 2nd: Donald B. Murphy Contractors, Inc. - $1,025,719.52
Apparent 3rd: Quigg Bros., Inc. - $1,415,196.00

Verified bid total results 

Low bidder: Interwest Construction, Inc.
Bid amount: $891,587.10

2nd bidder: Donald B. Murphy Contractors, Inc.
Bid amount: $1,025,719.52

3rd bidder: Quigg Bros., Inc.
Bid amount: $1,415,196.00

Item no. 2: Colville to Columbia River - Paving

Contract number: 009791
Engineer's estimate: $3,293,654.40
Number of addenda: 0
Number of bidders: 2/2

Award status: awarded 5/3/2022

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $2,910,095.80 - rejected 4/02/2022
Apparent 2nd: Central Washington Asphalt, Inc. - $3,729,000.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company - rejected 4/20/2022
Bid amount: $2,910,095.80

Subcontractor named 

  1. Colvico, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. dba Pavement Surface Co. - sub - $175,268.24
    Description of work: paint lines, permanent pavement marking includes: striping, guideposts & crack seal
  2. North Star Enterprises, Inc. - sub - $314,970.00
    Description of work: flagging, traffic control, temp pavement marking & striping, joint sealing

DBE goal: $465,615.33
DBE total: $490,238.24

2nd bidder: Central Washington Asphalt, Inc.
Bid amount: $3,729,000.00

Subcontractor named 

  1. Colvico, Inc.
    Description of work: electrical/illumination

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. dba Pavement Surface Control - sub - $196,898.44
    Description of work: paint lines, permanent pavement marking includes: striping, guideposts, crack and joint seal
  2. O'Bunco Engineering, Inc. - sub - $39,470.00
    Description of work: land surveying: layout/staking
  3. North Star Enterprises, Inc. - sub - $362,225.00
    Description of work: flagging, traffic control, temp marking & striping, rumble strips, sign erection, joint sealing

DBE goal: $596,640.00
DBE total: $598,593.44

Item no. 3: SR 506, 1.5 Miles N Of Frontage Rd to I-5 Emergency Bridge Repair

Contract number: 009795
Engineer's estimate: $952,296.77
Number of addenda: 0
Number of bidders: 10/8

Award status: awarded 4/21/2022

Preliminary bid total results 

Apparent low: SB Structures, LLC - $832,363.00
Apparent 2nd: Cascade Bridge LLC - $841,042.00
Apparent 3rd: Selby Bridge Company, Inc. - $851,557.00 - rejected 4/21/2022

Verified bid total results 

Low bidder: SB Structures, LLC
Bid amount: $832,363.00

Disadvantaged business enterprise (DBE) 

  1. Castaneda Landscaping - sub - $6,637.40
    Description of work: landscape services
  2. Schneider & Sons - sub - $49,905.00
    Description of work: lighting system installation, electric contracting
  3. MNG Construction, LLC - sub - $109,207.50
    Description of work: erosion control, excavation, earthmoving

DBE goal: $149,825.34
DBE total: $165,749.90

2nd bidder: Cascade Bridge LLC
Bid amount: $841,042.00

Disadvantaged business enterprise (DBE) 

  1. Schneider & Son, Inc. dba Schneider & Son - sub - $49,905.00
    Description of work: illumination system modification
  2. Yelm Property Development LLC dba C&C Development - sub - $115,248.50
    Description of work: excavation and embankment

DBE goal: $151,387.56
DBE total: $165,153.50

3rd bidder: Selby Bridge Company, Inc. - rejected 4/21/2022
Bid amount: $851,557.00

Disadvantaged business enterprise (DBE) 

  1. Schneider & Son, Inc. - sub - $131,000
    Description of work: electrical, traffic control
  2. Pavement Surface Control - sub - $22,970.00
    Description of work: barrier, striping

DBE goal: $153,280.26
DBE total: $153,970.00

Item no. 4: SR 142, Lyle To Little Klickitat River Br Chip Seal

Contract number: 009787
Engineer's estimate: $2,504,774.80
Number of addenda: 2
Number of bidders: 3/3

Award status: awarded 4/20/2022

Preliminary bid total results 

Apparent low: Central Washington Asphalt, Inc. - $3,014,000.00
Apparent 2nd: Interstate Concrete & Asphalt Company - $3,020,380.91
Apparent 3rd: Granite Construction Company - $3,423,989.82

Verified bid total results 

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $3,014,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

2nd bidder: Interstate Concrete & Asphalt Company
Bid amount: $3,020,380.91

Subcontractor named 

  1. None proposed
    Description of work: none proposed

3rd bidder: Granite Construction Company
Bid amount: $3,423,989.82

Subcontractor named 

  1. None proposed
    Description of work: none proposed

3/30/2022 bid opening - Olympia, WA

Item no. 1: ER Bridge Preventative Preservation – Patching

Contract number: 009792
Engineer's estimate: $2,277,403.00
Number of addenda: 0
Number of bidders: 4/1

Award status: awarded 4/13/2022

Preliminary bid total results 

Apparent low: Shamrock Paving, Inc. - $2,148,518.00

Verified bid total results 

Low bidder: Shamrock Paving, Inc.
Bid amount: $2,148,518.00

Subcontractor named 

None proposed
Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. dba North Star Enterprises I, Inc. - sub - $345,500.00
    Description of work: flagging, traffic control

DBE goal: $343,762.88
DBE total: $345,500.00

Item no. 2: SR 17 et al, NCR Seal 2022

Contract number: 009778
Engineer's estimate: $4,817,193.92
Number of addenda: 6
Number of bidders: 4/3

Award status: awarded 4/11/2022

Preliminary bid total results 

Apparent low: Central Washington Asphalt, Inc. - $4,970,000.00
Apparent 2nd: Granite Construction Company - $5,366,798.62
Apparent 3rd: Interstate Concrete & Asphalt Company - $6,343,249.97

Verified bid total results 

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $4,970,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc., dba Pavement Surface Control - sub - $623,100.70
    Description of work: paint lines, permanent pavement marking includes: striping, guideposts, crack seal
  2. O'Bunco Engineering, Inc. - sub - $4,450.00
    Description of work: surveying: layout/staking
  3. North Star Enterprises, Inc. - sub - $317,920.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, removal & installations (i.e. temp paint stripes), sign erections

DBE goal: $944,300.00
DBE total: $945,470.70

2nd bidder: Granite Construction Company
Bid amount: $5,366,798.62

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $474,700.00
    Description of work: traffic control, temporary pavement markings, rumble strips, recessed pavement markers
  2. Pavement Surface Control - sub - $605,000.00
    Description of work: crack seal, guide posts, permanent striping

DBE goal: $1,019,691.74
DBE total: $1,079,700.00

3rd bidder: Interstate Concrete & Asphalt Company
Bid amount: $6,343,249.97

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. - sub - $748,189.10
    Description of work: crack seal, guide posts, pavement marking
  2. North Star Enterprises - sub - $457,028.40
    Description of work: flagging, traffic control, rumble strips, temporary pavement marking, sign erection, recessed pavement markers

DBE goal: $1,205,217.49
DBE total: $1,205,217.50

Item no. 3: US 195, Old BNRR Bridge to Jct SR 271 PCCP Rehabilitation

Contract number: 009779
Engineer's estimate: $6,735,196.00
Number of addenda: 4
Number of bidders: 4/2

Award status: awarded 4/06/2022

Preliminary bid total results 

Apparent low: Acme Concrete Paving, Inc. - $7,916,364.65
Apparent 2nd: Kiewit Infrastructure West Co. - $9,277,049.25

Verified bid total results 

Low bidder: Acme Concrete Paving, Inc.
Bid amount: $7,916,364.65

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

2nd bidder: Kiewit Infrastructure West Co.
Bid amount: $9,277,049.25

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

3/23/2022 bid opening - Olympia, WA 

Item no. 1: I-5, Northgate Way & Maple Rd Bridges Seismic Retrofit

Contract number: 009783
Engineer's estimate: $4,552,743.20
Number of addenda: 1
Number of bidders: 10/7

Award status: awarded 4/08/2022

Preliminary bid total results 

Apparent low: Interwest Construction, Inc. - $5,296,238.00
Apparent 2nd: Combined Construction, Inc. - $5,620,563.00
Apparent 3rd: Massana Construction, Inc. - $5,666,327.00

Verified bid total results 

Low bidder: Interwest Construction, Inc.
Bid amount: $5,296,238.00

Subcontractor named 

  1. Electric West Inc.
    Description of work: electrical
  2. Interwest Construction, Inc.
    Description of work: structural steel installation - self perform
  3. Interwest Construction, Inc.
    Description of work: rebar installation - self perform

Disadvantaged business enterprise (DBE) 

  1. Meko Construction - sub - $14,000.00
    Description of work: concrete pumping
  2. Electric West Inc. - sub - $185,000.00
    Description of work: electrical
  3. O'Bunco Engineering International Inc. - sub - $20,200.00
    Description of work: surveying
  4. Advanced Government Services, Inc. - sub - $690,000.00
    Description of work: traffic control services
  5. M2 Industrial, Inc. - sub - $16,200.00
    Description of work: guard rail construction
  6. Pavement Surface Control - sub - $151,840.00
    Description of work: barrier
  7. The Bag Lady, Inc. - sub - $5,216.00
    Description of work: erosion control
  8. Briar Group, Inc. - sub - $15,541.00
    Description of work: hydroseeding

DBE goal: $1,059,247.60
DBE total: $1,097,997.00

2nd bidder: Combined Construction, Inc.
Bid amount: $5,620,563.00

Subcontractor named 

  1. Combined Construction, Inc. 
    Description of work: structural steel installation, rebar installation - self perform
  2. Elcon Corp.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead, Inc. dba Pavement Surface Co. - sub - $151,840.00
    Description of work: highway street and bridge - barrier
  2. Yelm Property Devel. dba C&C Development - sub - $719,985.17
    Description of work: earthwork and excavation - site civil
  3. Advanced Government Services, Inc. - sub - $254,000.00
    Description of work: temporary traffic control

DBE goal: $1,124,112.60
DBE total: $1,125825.17

3rd bidder: Massana Construction, Inc.
Bid amount: $5,666,327.00

Subcontractor named 

  1. Pacific Steel Group
    Description of work: rebar installation 
  2. Golden Gate Construction LLC, dba Golden Gate Electric
    Description of work: electrical
  3. Massana Construction, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. The Bag Lady, Inc. - sub - amount not proposed
    Description of work: inlet protection, compost sock, high visibility fence, high visibility silt fence
  2. M2 Construction - sub - $16,330
    Description of work: guardrail construction
  3. Construction Ahead Inc., dba Pavement Surface Control - sub - $151,840.00
    Description of work: barrier removal/install, precast concrete blocks
  4. Golden Gate Construction LLC, dba Golden Gate Electric - sub - $343,164.00
    Description of work: electric
  5. Hughes Group, LLC - sub - $660,985.00
    Description of work: temporary traffic control (partial) flagging, other traffic control labor, traffic control supervisor, sequential & PCMS boards, temporary devices

DBE goal: $1,133,265.40
DBE total: $1,172,319.00

Item no. 2: 2022 Eastern Region Chip Seal - South

Contract number: 009784
Engineer's estimate: $9,327,813.49
Number of addenda: 1
Number of bidders: 2/1

Award status: awarded 4/08/2022

Preliminary bid total results 

Apparent low: Central Washington Asphalt, Inc. - $12,979,000.00

Verified bid total results 

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $12,979,000.00

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. West Star Construction of Spokane - sub - $71,400.00
    Description of work: dump truck services
  2. O'Bunco Engineering, Inc. - sub - $3,925.00
    Description of work: land surveying: construction, layout/staking
  3. North Star Enterprises, Inc. - sub - $1,423,646.70
    Description of work: flagging, traffic control, temp & recessed pavement marking, rumble strips, removal temp stripes, guideposts, sign erection, sweeping, joint sealing
  4. M2 Industrial, Inc. - sub - $16,562.50
    Description of work: guardrail construction of all types
  5. Construction Ahead, Inc. dba Pavement Surface Control - sub - $951,173.50
    Description of work: paint lines, temporary/permanent pavement marking includes striping, crack and joint seal

DBE goal: $2,466,010.00
DBE total: $2,466,707.70

Item no. 3: SR 7, SR 507 to S of S 38th St - Paving 

Contract number: 009771
Engineer's estimate: $1,652,575.00
Number of addenda: 3
Number of bidders: 5/3

Award status: awarded 4/7/2022

Preliminary bid total results 

Apparent low: Tucci & Sons, Inc. - $1,623,409.60
Apparent 2nd: Miles Resources, LLC - $1,666,202.16
Apparent 3rd: Puget Paving and Construction, Inc. - $1,690,690.00

Verified bid total results 

Low bidder: Tucci & Sons, Inc.
Bid amount: $1,623,409.60

Subcontractor named 

  1. Totem Electric of Tacoma, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $165,000.00
    Description of work: traffic control
  2. Reece Construction Company - sub - $80,000.00
    Description of work: asphalt milling
  3. Lee's Demolition, LLC - sub - $119,000.00
    Description of work: lowering and raising utilities

DBE goal: $357,150.11
DBE total: $364,000.00

2nd bidder: Miles Resources, LLC
Bid amount: $1,666,202.16

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $192,532.00
    Description of work: traffic control
  2. Reece Construction Co. - sub - $85,656.60
    Description of work: planing and pavement repair excavation
  3. Lee's Demolition - sub - $116,358.00
    Description of work: adjust hardware 

DBE goal: $366,564.48
DBE total: $394,546.60

3rd bidder: Puget Paving and Construction, Inc.
Bid amount: $1,690,690.00

Subcontractor named 

  1. Advanced Government Services
    Description of work: traffic control
  2. Pavement Surface Control, Inc.
    Description of work: Permanent Striping

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services - sub - $183,964.00
    Description of work: traffic control
  2. Pavement Surface Control, Inc. - sub - $188,550.50
    Description of work: permanent striping

DBE goal: $371,951.80
DBE total: $372,515.50

3/16/2022 bid opening - Olympia, WA

Item no. 1:  SR 104, Edmonds Ferry Terminal Paving Preservation

Contract number: 009782
Engineer's estimate: $255,877.00
Number of addenda: 2
Number of bidders: 2/2

Award status: awarded 3/22/2022

Preliminary bid total results

Apparent low: Lakeside Industries, Inc. - $357,600.00
Apparent 2nd: Granite Construction Company - $362,869.50

Verified bid total results 

Low bidder: Lakeside Industries, Inc.
Bid amount: $357,600.00
2nd bidder: Granite Construction Company
Bid amount: $362,869.50

Item no. 2:  US 101, Hoquiam River, Riverside Bridge – Machinery Room & Operator House Rehabilitation

Contract number: 009780
Engineer's estimate: $1,382,584.00
Number of addenda: 2
Number of bidders: 5/2

Award status: awarded 3/29/2022

Preliminary bid total results

Apparent low: Rognlin's, Inc. - $1,657,564.00
Apparent 2nd: Massana Construction, Inc. - $1,783,704.00

Verified bid total results 

Low bidder: Rognlin's, Inc.
Bid amount: $1,657,564.00

Subcontractor named 

  1. Rognlin's, Inc.
    Description of work: structural steel installation 

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services Inc. - sub - $244,000.00
    Description of work: traffic control services
  2. Burly Products Inc. - supplier - $21,555.07
    Description of work: fabrication of metal railing

DBE goal: $265,210.24
DBE total: $265,555.07

2nd bidder: Massana Construction, Inc.
Bid amount: $1,783,704.00

Subcontractor named 

  1. Massana Construction Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. The Traffic Control Co. Inc. - sub - $186,000.00
    Description of work: temporary traffic control (partial) flagging, other traffic control labor, traffic control supervisor, sequential & PCMS boards, temp. devices and signs
  2. The Rodriguez Corporation, dba The Rodriguez Group in WA & CA - sub - $67,775.00
    Description of work: painting
  3. Burley Products, Inc. dba JR Construction - manufacturer - $35,925.12
    Description of work: railing, metal, manufacturing

DBE goal: $285,392.64
DBE total: $289,700.12

Item no. 3:  SR 9, SR 204 Intersection Improvements Demo #2

Contract number: 21A831
Engineer's estimate: $40,520.00
Number of addenda: 1 
Number of bidders:  6/2

Award status: awarded 3/24/2022

Preliminary bid total results

Apparent low: Skycorp, Ltd - $25,533.00
Apparent 2nd: Interwest Construction, Inc. - $115,115.00

Verified bid total results 

Low bidder: Skycorp, Ltd 
Bid amount: $25,533.00
2nd bidder: Interwest Construction, Inc.
Bid amount: $115,115.00

3/9/2022 bid opening - Olympia WA

Item no. 1: OR Strategic Bridge Preservation 21-23 Bridge Deck Patching

Contract number: 009777
Engineer's estimate: $1,047,981.00
Number of addenda: 1
Number of bidders: 6/3

Award status: awarded 3/23/2022

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $1,158,042.00
Apparent 2nd: M.J. Hughes Construction, Inc. - $1,487,350.00 rejected 3/24/2022
Apparent 3rd: Combined Construction, Inc. - $2,005,598.25 rejected 3/24/2022

Verified bid total results

Low bidder: Massana Construction, Inc.
Bid amount: $1,158,042.00

Subcontractor named

  1. Massana Construction Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE)

  1. The Traffic Control Co. Inc. - sub - $197,000.00
    Description of work: temporary traffic control (partial) flagging, other traffic control labor, traffic control supervisor, flagging, sequential & PCMS boards, temp. devices and signs

DBE goal: $196,867.14
DBE total: $197,000.00

Second bidder: M.J. Hughes Construction, Inc.
Bid amount: $1,487,350.00

Subcontractor named

  1. M.J. Hughes Construction, Inc. rejected 3/24/2022
    Description of work: rebar installation

Disadvantaged business enterprise (DBE)

  1. The Traffic Control Co - sub - $208,000.00
    Description of work: traffic control
  2. Commercial Contracting Supplies, LLC - supplier - $45,000.00
    Description of work: supply materials for containment

DBE goal: $252,849.50
DBE total: $253,000.00

Third bidder: Combined Construction, Inc. rejected 3/24/2022
Bid amount: $2,005,598.25

Subcontractor named

  1. Combined Construction, Inc.|
    Description of work: structural steel, rebar

Disadvantaged business enterprise (DBE)

  1. Pavement Surface Control - sub - $115,415.50
    Description of work: highway street and bridge - paint lines and pavement marking
  2. BC Traffic - sub - $206,000.00
    Description of work: traffic control

DBE goal: $340,951.70
DBE total: $321,415.00

Item no. 2: Coffin Rd Vicinity Paving

Contract number: 009776
Engineer's estimate: $421,678.00
Number of addenda: 1
Number of bidders: 3/3

Award status: awarded 3/22/2022

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $434,000.00
Apparent 2nd: Granite Construction Company - $464,720.30
Apparent 3rd: CPM Development Corporation - $557,324.80

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $434,000.00

Disadvantaged business enterprise (DBE)

  1. Construction Ahead, Inc. dba Pavement Surface Control - sub - $75,020.50
    Description of work: highway, street & bridge: paint lines, temporary/permanent pavement marking includes: striping guideposts; temp & perm non-electrical sign erection limited to highway/street/parking lots. 

DBE goal: $69,440.00
DBE total: $75,020.50

Second bidder: Granite Construction Company
Bid amount: $464,720.30

Disadvantaged business enterprise (DBE)

  1. Construction Ahead, Inc. dba Pavement Surface Control - sub - $76,133.00
    Description of work: temporary/permanent pavement markings, guideposts, temporary construction signs

DBE goal: $74,355.25
DBE total: $76,133.00

Third bidder: CPM Development Corporation
Bid amount: $557,324.80

Disadvantaged business enterprise (DBE)

  1. Construction Ahead, Inc. dba Pavement Surface Control - sub force account - $5,225.00
    Description of work: crack seal
  2. Construction Ahead, Inc. dba Pavement Surface Control - sub - $86,978.00
    Description of work: highway, street & bridge: paint lines, temporary/permanent pavement marking includes: striping, guideposts, joint sea & temporary non-electrical sign erection

DBE goal: $89,171,97
DBE total: $92,203.00

Item no. 3: SR 204 Intersection Improvement Demo #2

Contract number: 21A831
Number of bidders: 6/0

Award status: no bids received

Item no. 4: Murden Creek Remove Fish Barrier

Contract number: 009774
Engineer's estimate: $5,485,327.50
Number of addenda: 2
Number of bidders: 11/2

Award status: pending

Preliminary bid total results

Apparent low: Kraemer North America, LLC. - $7,691,568.00
Apparent 2nd: Active Construction, Inc. - $8,579,579.00

Verified bid results

Low bidder: Kraemer North America, LLC.
Bid amount: $7,691,568.00

Subcontractor named

  1. Pacific Steel Group
    Description of work: rebar installation
  2. Totem Electric of Tacoma, Inc.
    Description of work: electrical
  3. Kraemer North America, LLC
    Description of work: structural steel

Second bidder: Active Construction, Inc
Bid amount: $8,579,579.00

Subcontractor named

  1. Totem Electric
    Description of work: electrical
  2. Zemek Construction
    Description of work: structural steel install
  3. Zemek Construction
    Description of work: rebar install

3/2/2022 bid opening - Olympia, WA

Item no. 1: E Sunset Way Vic & NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay

Contract number: 009762
Engineer's estimate: $10,293,106.00
Number of addenda: 4
Number of bidders: 6/3

Award status: all bids rejected 3/11/2022

Preliminary bid total results

Apparent low: Midmountain Contractors, Inc. - $13,388,942.50
Apparent 2nd: Acme Concrete Paving, Inc. - $13,657,990.11
Apparent 3rd: Graham Contracting, Ltd. - $15,713,430.50

Verified bid total results

Low bidder: Midmountain Contractors, Inc.
Bid amount: $13,388,942.50

Subcontractor named

  1. Totem Electric of Tacoma Inc.
    Description of work: electrical
  2. PNW Reinforcing, Inc.
    Description of work: reinforcing steel
  3. Midmountain Contractors, Inc./self perform
    Description of work: structural steel

Disadvantaged business enterprise (DBE)

  1. O'Bunco Engineering - sub - $69,320.00
    Description of work: survey
  2. Novtio Construction Inc. - sub - $1,844,640.00
    Description of work: traffic control
  3. Pavement Surface Control - sub - $134,829.50
    Description of work: erosion control, joint seal, temp barrier
  4. PNW Reinforcing Inc. - sub - $46,800.00
    Description of work: reinforcing steel
  5. Atlas Construction Specialties - regular dealer - $59,400.20
    Description or work: dowels and tie bars
  6. Silver Streak Trucking - sub - $160,000.00
    Description of work: dump trucking
  7. Black Diamond Concrete Cutting Inc. - sub - $160,000.00
    Description of work: sawcutting

DBE goal: $2,410,009.65
DBE total: $2,414,989.00

2nd bidder: Acme Concrete Paving, Inc.
Bid amount: $13,657,990.11

Subcontractor named

  1. None proposed
    Description of work: none 

Disadvantaged business enterprise (DBE)

  1. O'Bunco Engineering - sub - $69,320.00
    Description of work: surveying
  2. Advanced Traffic Control - sub - $2,015,000.00
    Description of work: traffic control
  3. Tunista Construction - sub - $350,000.00
    Description of work: trucking
  4. Pavement Surface Control - sub - $103,365.00
    Description of work: pavement marking

DBE goal: $2,458,438.22
DBE total: $2,537,685.00

3rd bidder: Graham Contracting, Ltd.
Bid amount: $15,713,430.50

Subcontractor named

  1. Salinas Construction, Inc.
    Description of work: rebar & dowel installation
  2. Totem Electric
    Description of work: electrical 
  3. Graham Contracting, Ltd.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE)

  1. Salinas Construction, Inc. - sub - $470,000.00
    Description of work: concrete paving
  2. Pavement Surface Control - sub - $130,000.00
    Description of work: temporary barrier and attenuator, saw & seal
  3. O'Bunco Engineering, Inc. - sub - $69,000.00
    Description of work: land surveying
  4. Advanced Traffic Control - sub - $2,000,000.00
    Description of work: traffic control
  5. Ball & Son Excavation, LLC - sub - $170,000.00
    Description of work: dump trucking

DBE goal: $2,828,417.49
DBE total: $2,839,000.00

Item no. 2: Jackson St & S Forest St Vic Fiber Repair (small works roster)

Contract number: 009773
Engineer's estimate: $281,557.00
Number of addenda: 3
Number of bidders: 2/2

Award status: awarded 3/11/2022

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $490,000.00
Apparent 2nd: Elcon Corporation - $641,729.02

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $490,000.00

Disadvantaged business enterprise (DBE)

  1. The Fiber Guys - sub - $98,000.00
    Description of work: fiber splicing & pulling 

DBE goal: $98,000.00
DBE total: $98,000.00

2nd bidder: Elcon Corporation
Bid amount: $641,604.82**

Disadvantaged business enterprise (DBE)

  1. Advanced Government Services - sub - $120,000.00
    Description of work: traffic control

DBE goal: $128,320.96
DBE total: $120,000.00

Item no. 3: Delphi Rd to I-5 Paving and Concrete Barrier

Contract number: 009772
Engineer's estimate: $1,355,873.30
Number of addenda: 1
Number of bidders: 7/3

Award status: awarded 3/11/2022

Preliminary bid total results

Apparent low: Tucci & Sons, Inc. - $1,602,395.65
Apparent 2nd: Granite Construction Company - $1,742,658.90
Apparent 3rd: Lakeside Industries, Inc. - $1,975,536.25

Verified bid total results

Low bidder: Tucci & Sons, Inc.
Bid amount: $1,602,395.65

Subcontractor named

  1. Totem Electric of Tacoma
    Description of work: electrical
  2. Combined Construction
    Description of work: rebar
  3. Combined Construction
    Description of work: structural steel

Disadvantaged business enterprise (DBE)

  1. Advanced Government Services - sub - $216,000.00
    Description of work: traffic control
  2. John-Wayne Construction Company - sub - $73,600.00
    Description of work: concrete barrier
  3. O'Bunco International Engineering - sub - $3,990.00
    Description of work: survey

DBE goal: $288,431.22
DBE total: $293,590.00

2nd bidder: Granite Construction Company
Bid amount: $1,742,658.90

Subcontractor named

  1. Pacific Steel Group
    Description of work: rebar for bridge approach and moment slab and traffic barrier 
  2. Totem Electric of Tacoma, Inc.
    Description of work: electrical removal

Disadvantaged business enterprise (DBE)

  1. Tunista Construction, LLC - sub - $13,000.00
    Description of work: dump trucking
  2. Advanced Government Services, Inc. - sub - $295,000.00
    Description of work: traffic control services
  3. Pacific Rim Service and Construction Co. Inc. - sub - $11,750.00
    Description of work: installation/supplier of guardrail and guide posts

DBE goal: $313,678.60
DBE total: $319,750.00

3rd bidder: Lakeside Industries, Inc.
Bid amount: $1,975,536.25

Subcontractor named

  1. Totem Electric of Tacoma
    Description of work: electrical
  2. Zemek Construction
    Description of work: rebar and concrete

Disadvantaged business enterprise (DBE)

  1. Advanced Traffic Control - sub - $288,190.00
    Description of work: traffic control
  2. C&C Development - sub - $37,393.00
    Description of work: demolition, earthwork & excavation
  3. Pacific Rim Service & Construction Co. - sub - $11,951.00
    Description of work: guardrail, guideposts
  4. Pavement Surface Control - sub - $20,971.00
    Description of work: concrete barrier (temp) saw cutting joint
  5. O'Bunco Engineering - sub - $8,100.00
    Description of work: survey

DBE goal: $355,596.53
DBE total: $366,605.00

Slow down – lives are on the line.

In 2022, speeding continued to be a top reason for work zone crashes.

Even one life lost is too many.

Each year about 670 people are killed nationally in highway work zones. In 2022, Washington had six fatal work zone crashes on state roads.

It's in EVERYONE’S best interest.

95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.