Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Contracting opportunities
124 results
I-90/SR 26, Interchange Ramps Paving
Publication date:
Contract number: 009819
Submittal due:
Pavement repair, fog seal, planing bituminous pavement, centerline rumble strip, recessed pavement marker, pavement markings, traffic control and other work. Involves 37 items and 19 working days.
2022 OR Region Wide – Chip Seal
Publication date:
Contract number: 009816
Submittal due:
Applying a bituminous surface treatment, pavement repair, placing hot mix asphalt (HMA), installing centerline rumble strip, installing recessed and raised pavement markings, paint line, plastic pavement markings, traffic control and other work. Involves 35 items and 56 working days.
I-90, Oakes Ave I/C to Yakima River Bridge Replace Concrete Panels
Publication date:
Contract number: 009813
Submittal due:
Replacing cement concrete pavement panels, cement concrete pavement grinding, partial depth spall repair, dowel bar retrofit slot repair, random crack sealing, sealing existing longitudinal and transverse joints, patching hot mix asphalt (HMA) shoulders, planing bituminous pavement, delineation,…
I-5. Kincaid Sign Structure Replacement (Small Works Roster)
Publication date:
Contract number: 009814
Submittal due:
Construction of a cantilever sign structure, foundation removal, sign location, shaft drilling, traffic control and other work. Involves 15 items and 12 Working days.
US 97 ET AL, 2022 SCR Region Wide Chip Seal
Publication date:
Contract number: 009815
Submittal due:
Rehabilitating the existing roadway including chip sealing, updating delineation, patch repair, planing, paving intersections and severely distressed areas, bridge deck work, replacing centerline rumble strips, traffic control and other work. Involves 48 items and 45 working days.
I-5, 21-23 SWR Regionwide Bridges Concrete Deck Patching
Publication date:
Contract number: 009812
Submittal due:
Patching, installing pavement markings, traffic control and other work. Involves 37 items and 70 Working days.
SR 99, Duwamish River to S Spokane St Vic Paving & ADA Compliance
Publication date:
Contract number: 009804
Submittal due:
Grinding and inlaying hot mix asphalt (HMA) replacing damaged traffic signal loops and pedestrian curb ramps, temporary erosion control, traffic control and other work. Involves 85 items and 76 working days.
SR 500, NE 182nd Ave Intersection Improvements
Publication date:
Contract number: 009807
Submittal due:
Constructing a compact roundabout at the intersection of SR 500 and NE 182nd Ave, full-depth pavement rebuild, grind and hot mix asphalt (HMA) inlay, HMA overlay, pigmented cement concrete pavement, curbing, guardrail, drainage, striping, new illumination system including new junction boxes,…
US 2, Stevens Pass East - Paving
Publication date:
Contract number: 009806
Submittal due:
Roadway excavation, pavement repair, replace and modify grate inlet, shoulder finishing, crack sealing, planning bituminous pavement, hot mix asphalt (HMA) planning shoulder drainage cutout, removing and resetting existing permanent barrier, pavement markings, centerline and shoulder rumble strips…
I-5/US 101, Mcallister Creek & Mud Bay Bridges – Repair Bridge Piles
Publication date:
Contract number: 009808
Submittal due:
Furnishing and installing column jacket systems encapsulating the piles of five bridges, erosion and water pollution control measures, traffic control and other work. Involves 19 items and 110 working days.
I-5, Dike Access W Br MP 22.7 & BNRR Br MP 26 – Painting
Publication date:
Contract number: 009805
Submittal due:
Cleaning and painting the metal surfaces of Bridge No. 5/104W & Bridge No. 5/105W. Involves 24 items and 117 working days.
US 2, East of Leavenworth Slope Stabilization (Small Works Roster)
Publication date:
Contract number: 009802
Submittal due:
Force Account rock slope scaling, rock slope scaling debris removal including haul and pavement patching. erosion control and water pollution prevention, removing and resetting permanent barrier, shotcrete, rock dowel, traffic control and other work. Involves 22 items and 13 working days.
SR 9, SR 204 Intersection Improvements (Stage 3)
Publication date:
Contract number: 009801
Submittal due:
Adding two multi-lane roundabouts on SR 9, two single lane roundabouts at adjacent intersections, grading, paving with hot mix asphalt (HMA), pigmented Portland cement concrete pavement (PCCP) installation, drainage, planting, illumination, intelligent transportation system (ITS), American…
SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Publication date:
Contract number: 009800
Submittal due:
Constructing a noise barrier wall and concrete barrier, furnishing and installing overhead sign structures, paving, landscaping, drainage, storm sewer, intelligent transportation system (ITS), traffic control and other work. Involves 139 items and 400 working days.
SR 26, Dusty to Colfax Add Climbing Lanes
Publication date:
Contract number: 009803
Submittal due:
Roadway excavation, embankment compaction, drainage improvements, detention ponds, crushed surfacing, planing bituminous pavement, paving with hot mix asphalt (HMA), erosion control, seeding and planting, guardrail, guideposts, pavement markings, signing, traffic control and other work. Involves…
2022 Bridge & Structures Office Staff Augmentation
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide the services for engineering work, hereafter referred to as the CONSULTANT, for the purposes of staff…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide the services for engineering work, hereafter referred to as the CONSULTANT, for the purposes of staff…
SR 163, Tahlequah Ferry Terminal - Facility ADA Compliance Improvements (Small Works Roster)
Publication date:
Contract number: 009785
Submittal due:
Constructing ADA compliant parking stalls and a walkway between the ADA parking stalls and bus stop, traffic control other work. Involves 29 items and 50 working days.
I-90, Bridge Deck Preventative Preservation - Patching
Publication date:
Contract number: 009798
Submittal due:
Bridge deck repair, containment system, erosion control, traffic control and other work. Involves 29 items and 48 working days.
SR 20, Rocky Creek to Granite Creek BST
Publication date:
Contract number: 009796
Submittal due:
Placing bituminous surface treatment, planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, grading, roadway excavation, crack sealing, pavement markings, flexible guideposts, erosion control, traffic control and other work. Involves 48 items and 72 Working days.
2021 OR Region Wide Safety Features - Signing
Publication date:
Contract number: 009797
Submittal due:
Removing, relocating and installing permanent signs, traffic control and other work. Involves 8 items and 40 Working days.
SR 506, 1.5 Miles N Of Frontage Rd to I-5 Emergency Bridge Repair
Publication date:
Contract number: 009795
Submittal due:
Removing portion of an existing prestressed concrete girder, reconstructing a prestressed concrete girder bridge span, constructing and removing a temporary staging area, illumination system modification, pavement markings, traffic control and other work. Involves 27 items and 50 working days.
ER Bridge Preventative Preservation – Patching
Publication date:
Contract number: 009792
Submittal due:
Bridge deck repair, erosion control, traffic control and other work. Forty two working days. Involves 17 items.
Colville to Columbia River - Paving
Publication date:
Contract number: 009791
Submittal due:
Planing bituminous pavement, pavement repair excavation, crack sealing, paving with hot mix asphalt (HMA), pavement repair, inlet protection, erosion/water pollution control, centerline rumble strips, pavement markings, replacing detection loops, traffic control and other work. Forty working days.…
May Cr In Vic Of Dowans Ck Rd Ground Anchor Load Testing
Publication date:
Contract number: 009789
Submittal due:
Excavating for structure, constructing face stabilization piles, soil nail wall and concrete slab, conducting ground anchor sacrificial pullout tests, ground anchor pullout with creep tests, soil nail proof tests, backfilling, seeding and compost, erosion control, traffic control and planting.…
I-90, Cabin Creek I/C to W Easton I/C Phase 3 - Add Lanes/Wildlife Bridges
Publication date:
Contract number: 009786
Submittal due:
Replacing the existing four lane facility (two lanes in each direction) with a six lane facility (three lanes in each direction, with truck climbing lanes in select locations). Install new culverts, new bridges, wildlife undercrossing and overcrossing, constructing hydraulic connectivity zones (HCZ…
SR 142, Lyle To Little Klickitat River Br Chip Seal
Publication date:
Contract number: 009787
Submittal due:
Rehabilitating the existing roadway including pavement repair, crack seal, bituminous surface treatment (BST) and fog sealing, guidepost installation, pavement markings, recessed pavement markers, traffic control and other work. Forty Working days. Involves thirty seven items.
SR 9, SR 204 Intersection Improvements Demo #2
Publication date:
Submittal due:
Abatement of asbestos materials, removal and disposal of building and contents, foundations, business sign, fencing, backflow preventer, some landscape materials, miscellaneous debris and other work. Sixteen working days. Involves 10 items.
2022 Eastern Region Chip Seal - South
Publication date:
Contract number: 009784
Submittal due:
Constructing bituminous surface treatment, planning bituminous pavement, crack sealing, hot mix asphalt (HMA) paving, pavement repair and prelevel, removing existing overlay from bridge deck, bridge deck repair, placing waterproof membrane, crushed surfacing top course, centerline rumble strips,…
I-5, Northgate Way & Maple Rd Bridges Seismic Retrofit
Publication date:
Contract number: 009783
Submittal due:
Seismic retrofitting bridges 5/588E, 5/588W, and 5/613, installing steel column jackets, crossbeam bolsters, girder stops, erosion and pollution control, removing and replacing pavement markings, concrete sidewalk, traffic barriers, guardrail and fencing, traffic control and other work. One hundred…
2022 Olympic Region Design Consultant Engineering Services – SR 3/SR 16/SR 160/Gorst Vicinity – Remove Fish Barriers
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants to evaluate and consider providing Engineering Services for Design Approval/Project Development Approval of the Design documentation Package, Design…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants to evaluate and consider providing Engineering Services for Design Approval/Project Development Approval of the Design documentation Package, Design…
Zero emission electric vehicle registrations in Washington
increased 192% between 2017 and 2021.
45 projects to improve freight rail structures and freight movement
were underway as of December 31, 2021.
Washington state leveraged $100,000 to secure $27 million
in funding for airport investments in Fiscal Year 2022.