COVID-19
For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.
This project includes installation of enhanced striping and signage at selected intersections on US 2 and US 395.
Why is WSDOT addressing these intersections?
Enhanced signage and striping may assist drivers as they approach intersections of local roads with high-speed highways.
The End Result
Higher visibility for busy intersections to assist drivers.
Reduction in collision frequency.
Financial Data for PIN 600025I
Amount ($ in thousands)
Chad Simonson, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207
509-324-6000
simonsc@wsdot.wa.gov