COVID-19
For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.
In summer 2018, contractor crews from Cadman Materials, Inc. repaved both directions of SR 530 between I-5 and SR 9 in Arlington. Five sidewalk ramps at the SR 9 intersection were also upgraded, creating a wider ramp and more gradual slope.
The cost of this project was $2.8 million.