In summer 2017, crews working for the Washington State Department of Transportation resurfaced the eastbound bridge deck of the SR 432 Cowlitz River Bridge, also known by its official name; the Harry E. Morgan Bridge, located in Cowlitz County.
Over time, a combination of heavy traffic and weather conditions were deteriorating the bridge deck surface. Cracks and rutting in the pavement were visible and in need of repair. Resurfacing work preserved the integrity and extended the life of the highway, as we well as provided a cost-effective fix before the underlying road and bridge deck were permanently damaged.
The End Result
This resurfacing project rehabilitated the existing pavement and preserved this important transportation infrastructure that services approximately 35,000 vehicles a day.
Project Benefits
Spring 2017: Project went to competitive bid
July 6, 2017: Hamilton Construction Co. was awarded this contract
Summer 2017: Construction began
Fall 2017: Project complete
Financial Data for PIN 443214B
Funding Source Amount ($ in thousands)
Joanna Lowrey
WSDOT Project Engineer
360-442-1350 or toll free 1-800-545-1393
Tamara Greenwell
WSDOT Communications
Phone: 360-905-2056