This project used the existing highway footprint to extend the second lane of southbound SR 3 for roughly one mile. Crews also repaved southbound SR 3 between milepost 36 to 36.8.
The project improves traffic flow on southbound SR 3. Traffic cameras were also installed at the intersections of SR 3 and SR 304 and Loxie Eagans Boulevard.
Pre-Existing Funds (PEF): $4.2 million
WSDOT Project Engineer
360-874-3010