Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

5/30/2024 bid opening - Olympia, WA

Item no. 1: I-5, SB I-205 to Ridgefield Interchange Replace Deteriorated Concrete

Contract number: XE3544
Engineer's estimate: $1,870,682.60
Number of addenda: 0
Number of bidders: 5/5
Award status: pending

Preliminary bid total results

Apparent low: Granite Construction Company -  $1,396,422.00
Apparent second: Kerr Contractors Oregon, LLC - $1,656,161.16
Apparent third: Midmountain Contractors, Inc. - $1,763,148.00

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $1,396,422.00

Subcontractor named

  1. Roger Langeliers Construction Company
    Description of work: rebar installation

Small business enterprise (SBE)

  1. (AGS) Advanced Govt Services - sub - $15,000.00
    Description of work: transportable attenuator
  2. (AGS) Advanced Govt Services - sub - $10,000.00
    Description of work: operation of queue warning system
  3. (AGS) Advanced Govt Services - sub - $750.00
    Description of work: radar speed display sign
  4. n(AGS) Advanced Govt Services - sub - $20,000.00
    Description of work: other temp. traffic control
  5. (AGS) Advanced Govt Services - sub - $35,580.00
    Description of work: other traffic control labor
  6. (AGS) Advanced Govt Services - sub - $15,000.00
    Description of work: traffic control supervisor
  7. (AGS) Advanced Govt Services - sub - $32,463.00
    Description of work: patrol and maintain traffic control

SBE goal: $69,821.1‬0
SBE total: $128,793.00

Veteran-owned business (VOB)

  1. MLC Trucking LLC - sub - $6,000.00
    Description of work: dump trucking, HMA, millings
  2. C&J Contracting Services - sub - $9,800.00
    Description of work: ESC lead
  3. C&J Contracting Servicese - sub - $1,920.00
    Description of work: inlet protection
  4. C&J Contracting Services - sub - $16,000.00
    Description of work: erosion and water pollution prevention

VOB goal: $27,928.44
VOB total: $33,720.00

Second bidder: Kerr Contractors Oregon, LLC
Bid amount: $1,656,161.16

Subcontractor named

  1. ACME
    Description of work: rebar installation replace concrete panel

Small business enterprise (SBE)

  1. Construction Ahead, dba Pavement Surface Control - sub - $100,937.00
    Description of work: crack sealing

SBE goal: $82,808.056
SBE total: $100,937.00

Veteran-owned business (VOB)

  1. American Veterans Construction, LLC - sub - $5,000.00
    Description of work: replace uncompactible material
  2. American Veterans Construction, LLC - sub - $14,000.00
    Description of work: other traffic control devices
  3. American Veterans Construction, LLC - sub - $10,000.00
    Description of work: work zone safety contingency
  4. American Veterans Construction, LLC - sub - $5,000.00
    Description of work: class A signs

VOB goal: $33,123.22
VOB total: $34,000.00

Third bidder: Midmountain Contractors, Inc.
Bid amount: $1,763,148.00

Subcontractor named

  1. Midmountain Contractors, Inc.
    Description of work: rebar

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $95,000
    Description of work: traffic control

SBE goal: $88,157.40
SBE total: $95,000.00

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $40,000
    Description of work: traffic control

VOB goal: $35,262.96‬
VOB total: $40,000.00

Item no. 2: SR 302, Victor Creek - Remove Fish Barrier

Contract number: XE3512
Engineer's estimate: $4,973,544.50
Number of addenda: 6
Number of bidders: 14/3
Award status: pending

Preliminary bid total results

Apparent low: Johansen Construction Company, LLC - $4,770,310.00
Apparent second: Goodfellow Bros. LLC - $5,690,115.45
Apparent third: Rognlin's, Inc. - $5,943,262.50

Verified bid total results

Low bidder: Johansen Construction Company, LLC
Bid amount: $4,770,310.00

Subcontractor named

  1. Pacific Steel Group
    Description of work: rebar installation
  2. MB Electric, LLC.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors - sub - $765,000.00
    Description of work: bridge construction

DBE goal: $763,249.6‬0
DBE total: $765,000.00

Second bidder: Goodfellow Bros. LLC
Bid amount: $5,690,115.45

Subcontractor named

  1. MB Electric
    Description of work: electrical
  2. Franklin Pacific Construction Company
    Description of work: structural steel installation
  3. Pacific Northwest Reinforcing, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. The Bag Lady - sub - $11,718.95
    Description of work: erosion control installation
  2. O'Bunco Engineering - sub - $43,220.00
    Description of work: survey/layout
  3. WCCL Systems - sub - $17,600.00
    Description of work: install pigmented sealer
  4. PNW Rebar - sub - $367,777.00
    Description of work: furnish/install rebar
  5. Bella Terra - sub - $68,788.00
    Description of work: install landscape
  6. M2 Industrial - sub - $120,829.50
    Description of work: guardrail install
  7. John-Wayne Construction - sub - $74,050.00
    Description of work: F/P/S CIP barrier
  8. Burly Products - sub - $27,010.14
    Description of work: furnish/install bridge railing
  9. Allegiance Trucking - sub - $30,000.00
    Description of work: trucking
  10. A-1 Asphalt Paving, Inc. - sub - $158,215.00
    Description of work: asphalt paving

DBE goal: $910,418.47
DBE total: $919,208.59

Third bidder: Rognlin's, Inc. - $5,943,262.50
Bid amount: $

Subcontractor named

  1. MB Electric of Grays Harbor, LLC
    Description of work: electrical
  2. Rognlin's, Inc.
    Description of work: structural steel installation
  3. Rognlin's, Inc.
    Description of work: rebar Installation

Disadvantaged business enterprise (DBE) 

  1. Highmark Concrete Contractors, LLC. - sub - $557,585.00
    Description of work: concrete construction, bridge construction, flat work
  2. PNW Reinforcing, Inc. - sub - $367,777.00
    Description of work: installation, placing and tying reinforcing steel
  3. Burly Products, Inc. dba Burly Products - sub - $27,010.14
    Description of work: install and supply bridge railing

DBE goal: $950,922‬.00
DBE total: $952,372.14
 

5/22/2024 bid opening - Olympia, WA

Item no. 1: SR 26 and I-90, Eastern Region 2024 Bridge Repair

Contract number: XE3537
Engineer's estimate: $1,998,096.58
Number of addenda: 1
Number of bidders: 6/1
Award status: all bids rejected 5/28/2024

Preliminary bid total results

Apparent low: Combined Construction, Inc. - $3,562,373.00

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $3,562,373.00

Subcontractor named

  1. Self perform
    Description of work: structural steel installation

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $3,562,373.00

Subcontractor named

  1. Self perform
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - sub - $414,340.00
    Description of work: traffic control, inlet protection temp striping
  2. M2 Industrial - sub - $77,000.00
    Description of work: temporary concrete barrier
  3. O'Bunco Engineering - sub - $11,900.00
    Description of work: survey
  4. TTC Construction - sub - $32,000.00
    Description of work: 

DBE goal: $534,355.95‬
DBE total: $535,240.00

Item no. 2: WSF, Maritime Security Infrastructure Preservation (Small Works Roster)

Contract number: XE3534
Engineer's estimate: $337,197.00
Number of addenda: 2
Number of bidders: 5/2
Award status: pending

Preliminary bid total results

Apparent low: Prime Electric, LLC - $232,000.32   
Apparent second: Kaige Electrical Solutions, LLC DBA Kaige Industrial Contractors - $318,451.75**

Verified bid total results

Low bidder: Prime Electric, LLC
Bid amount: $232,000.32   

Second bidder: Kaige Electrical Solutions, LLC DBA Kaige Industrial Contractors
Bid amount: $318,451.75**

5/15/2024 bid opening - Olympia, WA

Item no. 1: US 395, NSC 2024 Demo No 1

Contract number: XE3533
Engineer's estimate: $685,794.00
Number of addenda: 0
Number of bidders: 6/2
Award status: Awarded 5/28/2024

Preliminary bid total results

Apparent low: Rob's Demolition Inc. - $615,263.77 
Apparent second: N.W. Construction General Contracting, Inc. - $788,389.60 - rejected 5/20/2024

Verified bid total results

Low bidder: Rob's Demolition Inc.
Bid amount: $615,263.77 

Small business enterprise (SBE)

  1. Rob's Demolition Inc. - prime - $281,000.00
    Description of work: removal of structures & obstructions

SBE goal: $30,763.19
SBE total: $281,000.00

Veteran-owned business (VOB)

  1. Wm. Winkler Company - sub - $15,437.50
    Description of work: common borrow including haul

VOB goal: $12,305.28
VOB total: $15,437.50

Second bidder: N.W. Construction General Contracting, Inc.  - rejected 5/20/2024
Bid amount: $788,389.60

Small business enterprise (SBE)

  1. N.W. Construction General Contracting, Inc. - prime - $605,701.85
    Description of work: demolition, site work, grading

SBE goal: $39,419.48‬
SBE total: $605,701.85

Veteran-owned business (VOB)

  1. GFE
    Description of work: GFE

VOB goal: $15,767.79
VOB total: $-

Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

Item no. 2: SR 7, Pacific Highway Crossing and Signalization

Contract number: XE3536
Engineer's estimate: $3,506,313.00
Number of addenda: 1
Number of bidders: 4/2
Award status: pending

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $5,898,000.00   
Apparent second: Titan Earthwork, LLC - $8,093,394.00

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $5,898,000.00 

Subcontractor named

  1. LaRusso Concrete
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Cannon Companies - sub - $400,600.00
    Description of work: fiber pulling & splicing

SBE goal: $294,900‬.00
SBE total: $400,600.00

Veteran-owned business (VOB)

  1. Mobile Electrical Dist., Inc. - manufacturer/supplier - $120,000.00
    Description of work: electrical supplier

VOB goal: $117,960‬.00
VOB total: $120,000.00

Second bidder: Titan Earthwork, LLC
Bid amount: $8,093,394.00

Subcontractor named

  1. Titan Earthwork, LLC (Self Perform)
    Description of work: electrical
  2. Titan Earthwork, LLC (Self Perform)
    Description of work: structural steel installation
  3. Titan Earthwork, LLC (Self Perform)
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Mobile Electrical Dist., Inc. -manufacturer/supplier - $450,000.00
    Description of work: materials supplier (partial)

SBE goal: $404,669.7‬0
SBE total: $450,000.00

Veteran-owned business (VOB)

  1. Mobile Electrical Dist., Inc. -manufacturer/supplier - $200,000.00
    Description of work: materials supplier (partial)

VOB goal: $161,867.88‬
VOB total: $200,000.00

Item no. 3: I-5, Slater Road Interchange Roundabout

Contract number: XE3532
Engineer's estimate: $4,658,327.24
Number of addenda: 3
Number of bidders: 5/4
Award status: pending

Preliminary bid total results

Apparent low: Granite Construction Company - $3,949,197.71   
Apparent second: Interwest Construction, Inc. - $4,962,367.00
Apparent third: Faber Construction Corp. - $5,449,532.90

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $3,949,197.71  

Subcontractor named

  1. Sail Electric
    Description of work: electrical

Small business enterprise (SBE)

  1. Matia Contractors, Inc. - sub - $50,000.00
    Description of work: full - landscaping
  2. Matia Contractors, Inc. - sub - $40,000.00
    Description of work: full - landscaping
  3. Matia Contractors, Inc. - sub - $40,000.00
    Description of work: full - landscaping
  4. Matia Contractors, Inc. - sub - $120,000.00
    Description of work: full - landscaping

SBE goal: $197,459.89
SBE total: $250,000.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $3,600.00
    Description of work: partial - mobilization
  2. M2 Industrial, Inc. - sub - $36,800.00
    Description of work: full - guardrails
  3. Sawtooth Trucking & Excavating, Inc. - sub - $45,000.00
    Description of work: partial - dump truck hauling

VOB goal: $78,983.95
VOB total: $85,400.00

Second bidder: Interwest Construction, Inc.
Bid amount: $4,962,367.00

Subcontractor named

  1. Sail Electric, Inc.
    Description of work: electrical
  2. Interwest Construction, Inc.
    Description of work: structural steel installation
  3. Interwest Construction, Inc.
    Description of work: rebar installation

Small business enterprise (SBE)

  1. Matia Contractors, Inc. - sub - $345,575.64
    Description of work: landscaping, mob (partial)

SBE goal: $248,118.35‬
SBE total: $345,575.64

Veteran-owned business (VOB)

  1. Mobile Electrical Distributors, Inc. - manufacturer/supplier - $69,606.00
    Description of work: electrical supply (partial)
  2. M2 Industrial, Inc. - sub - $36,959.25
    Description of work: mob (partial), guardrail

VOB goal: $99,247.34‬
VOB total: $106,565.25

Third bidder: Faber Construction Corp.
Bid amount: $5,449,532.90

Subcontractor named

  1. American Electrical Services
    Description of work: electrical
  2. Faber Construction Corp.
    Description of work: rebar installation
  3. Faber Construction Corp.
    Description of work: structural steel installation

Small business enterprise (SBE)

  1. Daramola, Inc. - sub - $454,155.00
    Description of work: landscaping

SBE goal: $272,476.65
SBE total: $454,155.00

Veteran-owned business (VOB)

  1. AES, Inc. - sub - $466,662.68
    Description of work: electrical

VOB goal: $108,990.66
VOB total: $466,662.68

5/8/2024 bid opening - Olympia, WA

Item no. 1: SR 20, S Fork Mill Creek Rd to Tiger - Paving

Contract number: XE3535
Engineer's estimate: $4,870,223.00
Number of addenda: 1
Number of bidders: 2/2
Award status: awarded 5/17/2024

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $5,295,000.00   
Apparent second: Interstate Concrete & Asphalt Company- $5,494,004.28

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $5,295,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. A&H Roadwurx - sub - $152,770.00
    Description of work: asphalt milling, bituminous planing
  2. Audi Construction, LLC - sub - $31,000.00
    Description of work: the hauling of grindings and asphalt
  3. M2 Industrial, Inc. - sub - $91,174.00 
    Description of work: guardrail construction of all types
  4. North Star Enterprises I, Inc. - sub - $467,685.00
    Description of work: flagging, traffic control, temp marking, rumble strips, guide posts, sign erection, sweeping, joint sealing
  5. O'Bunco Engineering, Inc. - sub - $41,125.00
    Description of work: land surveying: GPS control, layout/staking
  6. Wheeler Excavation, LLC - sub - $124,750.00
    Description of work: business specializes in heavy civil construction

DBE goal: $900,150‬.00
DBE total: $908,504.00

Second bidder: Interstate Concrete & Asphalt Company
Bid amount: $5,494,004.28

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $800,294.00
    Description of work: flagging, traffic control, temp pavement marking & striping, guide posts, high visibility fence, rumble strip, sweeping, joint sealing
  2. North Star Enterprises 1, Inc. - sub (force account) - $1,500.00
    Description of work: crack sealing
  3. Northern Resource Consulting Inc. DBA NRC, Inc. - sub - $34,395.00
    Description of work: high visibility fence, silt fence, erosion control, flexible guide post
  4. M2 Industrial, Inc. - sub - $83,174.00
    Description of work: guardrail construction of all types 
  5. O'Bunco Engineering, Inc. - sub - $21,000.00
    Description of work: land surveying

DBE goal: $933,980.73
DBE total: $940,363.00

Item no. 2: SR 503, NE Rock Creek Rd - Intersection Improvements

Contract number: XE3527
Engineer's estimate: $1,643,067.24
Number of addenda: 5
Number of bidders: 6/1
Award status: awarded 5/29/2024

Preliminary bid total results

Apparent low: Tapani, Inc. - $1,529,251.00

Verified bid total results

Low bidder: Tapani, Inc.
Bid amount: $1,529,251.00

Subcontractor named

  1. Mill Plain Electric
    Description of work: electrical
  2. JRT Mechanical
    Description of work: plumbing
  3. JRT Mechanical
    Description of work: HVAC
  4. Tapani, Inc. - self perform
    Description of work: structural steel
  5. Olson Concrete Construction, LLC
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. Olson Concrete Construction, LLC - sub - $151,074.68
    Description of work: commercial and industrial structural concrete contractor for foundations, flatwork, rebar placement, and retaining wall, concrete finishing, resurfacing, repairing, grouting, sealing, polishing, and restoration, pervious concrete construction, commercial hand setting curb and gutter construction
  2. C&R Tractor & Landscape, Inc. sub - $124,260.00
    Description of work: highway, street and bridge construction, landscape related work, other construction and environmental related work

DBE goal: $275,265.18
DBE total: $275,334.68

5/1/2024 bid opening - Olympia, WA

Item no. 1: 2024 OR Region Wide Chip Seal

Contract number: XE3531
Engineer's estimate: $4,541,073.80
Number of addenda: 0
Number of bidders: 3/2
Award status: awarded 5/20/2024

Preliminary bid total results

Apparent low: Doolittle Construction, LLC - $5,279,476.50
Apparent second: Granite Construction Company - $6,278,759.31

Verified bid total results

Low bidder: Doolittle Construction, LLC
Bid amount: $5,279,476.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Hi Grade Asphalt & Seal Coat, Inc. - sub - $600,000.00
    Description of work: pave repair excavation incl. haul; placing HMA for preleveling; placing HMA for pave repair
  2. T&T Traffic Control, LLC - sub - $420,000.00
    Description of work: traffic control (excluding class A signs) - partial

DBE goal: $1,003,100.54
DBE total: $1,020,000.00

Second bidder: Granite Construction Company
Bid amount: $6,278,759.31

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Budiman Construction - sub - $641,832.85
    Description of work: traffic control
  2. Hi Grade Asphalt & Seal Coat, Inc. - $609,000.00
    Description of work: asphalt paving, asphalt repair, and asphalt grinding

DBE goal: $1,192,964.27
DBE total: $1,250,832.85

Item no. 2: SR 24 et al, SCR 2024 Region Wide Chip Seal and Rumble Strips

Contract number: XE3530
Engineer's estimate: $3,821,583.25
Number of addenda: 1
Number of bidders: 4/3
Award status: awarded 5/20/2024

Preliminary bid total results

Apparent low: Interstate Concrete & Asphalt Company - $3,968,734.30
Apparent second: Granite Construction Company - $4,040,400.00
Apparent third: Central Washington Asphalt, Inc. - $4,388,000.00

Verified bid total results

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $3,968,734.30

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $756,198.00
    Description of work: traffic control, rumble strips, RPMs, temporary striping
  2. Pacific Rim Service and Construction Co., Inc. - sub - $0
    Description of work: guardrail construction, guidepost installation
  3. KB Markings, LLC - sub - $0
    Description of work: painting lines on highway

DBE goal: $595,310.15
DBE total: $756,198.00

Second bidder: Granite Construction Company
Bid amount: $4,040,400.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $610,000.00
    Description of work: traffic control, temp & recessed pavement marking, rumble strips 

DBE goal: $606,060‬.00
DBE total: $610,000.00

Third bidder: Central Washington Asphalt, Inc.
Bid amount: $4,388,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $700,310.00
    Description of work: flagging, traffic control, recessed pavement marking, rumble strips, sign erection, sweeping

DBE goal: $658,200‬.00
DBE total: $700,310.00

 

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down – lives are on the line. 

In 2023, speeding continued to be a top reason for work zone crashes.

Even one life lost is too many.

Fatal work zone crashes doubled in 2023 - Washington had 10 fatal work zone crashes on state roads.

It's in EVERYONE’S best interest.

95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.