Skip Top Navigation

SR 270 - Jct US 195 to Bishop Blvd - Paving

Status

August 2017

  • Weekly Construction Update
  • Minor items remain.
  • Awarded to Poe Asphalt Paving of Clarkston, WA  with a construction bid of $2,324,173.

SR 270 will be resurfaced with Hot Mix Asphalt.  This will include Davis Way, a short section of Grand Ave., Main Street, and Paradise Street.

Why is WSDOT resurfacing this highway?
High traffic volumes with normal wear and tear has deteriorated the pavement surface.

The End Result
A smoother roadway and protection for the underlying highway structure.

Project Benefits
A better experience for drivers with a reduced need for repairs and patching.

What is the project timeline?
The project will be designed, advertised for bids and constructed during 2017.

Financial Information

Financial Data for PIN 627000U
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $2,299
CWA $0
Total $2,299

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Larry Larson, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA  99207
509-324-6000

back to top