Memorandum |
TO: |
All Design Section Staff |
FROM: |
J. Kapur |
DATE: |
June 18, 2001 |
SUBJECT: |
Pretensioned Anchorage Zones |
The distribution length of h/5 for the vertical in the end of pretensioned girders as specified in the AASHTO-LRFD article 5.10.10.1 is overly conservative and results in impractical spacing of vertical reinforcing at the end of pretensioned girders, particularly for longer spans prestressed girders where higher prestressing forces are required. The distribution zone of h/4 in accordance with the AASHTO Standard Specifications Article 9.22.1 has been successfully used for many years. The AASHTO Subcommittee on Concrete Bridges in their May 2001 meeting in Seattle approved the above modification to the AASHTO-LRFD Bridge Design Specifications article 5.10.10.1.
If you have any questions regarding this design issue, please contact Bijan Khaleghi at 705-7181.
JK:dsb
BK
cc: J. A. Weigel, Bridge
and Structures - 47340
E. H. Henley, Bridge
and Structures - 47340
H.
L. Coffman, Bridge Preservation - 47341
F.
Higgins, Bridge and Structures - 47340
R.
Lewis, Construction - 47354
Z.
Fahoum, Bridge and Structures 47340