SR 169: Slide repair near Green River
Work is now underway on stabilizing a landslide at the southeast end of the SR 169 bridge over the Green River near Black Diamond. The bridge will be reduced to one lane during this work. North and southbound traffic will alternate. This work is expected to last until mid-September. The second phase of repairs will begin in late September.