Traffic changes planned at Peace Arch
Beginning May 19, the GSA will
close west side inspection booths at the Peace Arch crossing so utilities can be installed. Traffic will be diverted to inspection booths on the east side of the U.S. facility until June 27. Three general purpose lanes and one Nexus lane will be available during construction – the same number normally open to travelers.