US 12 - Frenchtown Vicinity to Walla Walla - Add Lanes

Quarterly Project Report Update for Quarter Ending December 2004

Project Title & Location
US 12/McDonald Road to Walla Walla - Add Lanes, Walla Walla County

Project Description
This project is phase six of eight phases that improve US 12 from SR 124 (Burbank) to Walla Walla. This approximately eight mile project will reconstruct US 12 from McDonald Road to Walla Walla as a four lane divided highway, with improved capacity and enhanced safety.

Contractor/Consultant
Project not yet advertised or awarded

Recent Progress
In 2003 and 2004, the US Highway 12 Coaltiion successfully lobbied for $8.2 million in Federal Earmark Funds to continue development of design and contract plans, and for the acquisition of right of way for US 12 between McDonald Rd and Walla Walla.  Recent progress includes surveying, field investigation, data research, and preliminary borings for soil conditions.  An Open House will be held in late March to answer questions about the project and schedule.  The Transpo Group has been hired to conduct a traffic analysis.

Design Construction Impacts
At the request of the US 12 Highway Coalition, an agressive schedule has been developed to prepare a contract by November 2006.  Senator Patty Murray and Representative Nethercutt  are supporting the Coalitions request for additional federal funding to construct this project.

Environmental Impacts / Compliance
The Interagency Project Team (IPT), formed for the Phase 4 Planning Study, will assist the WSDOT to identify the environmental impacts within a likely corridor.  David Evans and Associates has been hired to conduct  the Resource Studies.

Impacts to Traffic

Project Milestones Scheduled Attained Milestone Outlook
Environmental Documentation April 05
Design Documentation  April 05
Environmental Permits Oct 06
Right of Way Oct 06
Copntract Advertisement Nov 06
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering
Right-of-Way
Construction
Funded Project Costs

Nickel funds included in above costs

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Kerry Grant, WSDOT Project Engineer @ (509) 577-1760 or E- Mail: grantk@wsdot.wa.gov