SR 101/t3ba'das Parkway Intersection and Safety Improvements

Project location map

Overview
The t3ba'das Parkway and SR 101 intersection improvements are two projects included from the north end of the Tribe's Master Plan for the US Highway 101 Corridor on the Skokomish Reservation (Jones and Jones). Phase II will complete the intersection, widen SR 101 by 14 feet, add a 2-way left turn lane, an east entry to Potlach Park, two right turn tapers, intersection illumination, a pedestrian actuated signal to warn motorists of crossing foot traffic, a fish culvert on Potlach Creek, improved storm water drainage, an asphalt overlay, landscaping, road signs, and striping.

Why are we Building This Project?
This project will improve safety for motorists and pedestrians while addressing existing environmental impacts.