Sprague Avenue Resurfacing Project #1

Project location map

Overview
The project will grind and inlay 2 inches of Hot Mix Asphalt. Traffic island modifications, handicap ramp upgrades, signal loops and interconnect conduit installation along with stormwater upgrades will take place.

Why are we Building This Project?
Sprague Avenue has the highest traffic volume of any east - west principal arterial in the City.  The existing pavement condition is at a level that preservation is required to prevent total reconstruction of the roadway.  The resurfacing project will extend the pavement life.