Overview
Includes construction of a dedicated 5 foot wide bicycle path on the east side of the roadway and the relocation of the existing sidewalk to accommodate said bicycle path. 

Why are we Building This Project?
Capitol Boulevard between "E" Street and "M" Street is currently a median separated four-lane arterial. This arterial segment currently has a designated bike lane for southbound traffic but no bike facility for northbound traffic. This route is part of the City's backbone bike route and would connect to the bike route on Deschutes parkway at "E" Street.

How can I get more information?
Contact:

Jay C. Eaton, P.E.
360-754-4140