Skip Top Navigation

Capitol Boulevard Preservation Project - Dennis to Israel

Project location map

Overview
This project involves minor structural roadway repair, asphalt planing, and overlaying the existing roadway with a new wearing course of asphalt as well as modification to signal detection and adjustment of utilities to new elevations.

Why are we Building This Project?
This preservation project is proposed for this major arterial roadway which was last overlaid more than 20 years ago. Current traffic volumes are estimated to be between 18,000 and 20,000 trips per day.

How can I get more information?
Contact:

Jay C. Eaton, P.E.
360-754-4140
jeaton@ci.tumwater.wa.us