Skip Top Navigation

I-405 Congestion Relief & Bus Rapid Transit Projects - Renton To Bellevue Environmental Assessment

I-405, SR 169 to I-90 - Renton to Bellevue Project Environmental Assessment

We published the Finding of No Significant Impact (FONSI) for the Renton to Bellevue Project on November 20, 2008. Below you can download the FONSI in Adobe Acrobat portable document format (pdf).

Renton to Bellevue FONSI (pdf 3.6 mb)

Chapters 1 - 3 (pdf 1.72 mb)
Chapter 4 (pdf 4.57 mb)
Chapter 5 (pdf 5.88 mb)
Chapters 6 - 8 (pdf 1.11 mb)

Appendix A:  Project Design Features (pdf 4.79 mb)
Appendix B:  Glossary (pdf 40 kb)
Appendix C:  Proposed Construction (pdf 43 kb)
Appendix D:  NEPA Elements (pdf 37 kb)
Appendix E:  Concurrence Letters (pdf 5.34 mb)
Appendix F:  Commitments (pdf 109 kb)

Discipline Reports, I-405 Renton to Bellevue Project
SR 169 - I-90

The Discipline Reports are available at local libraries or you may purchase a CD with all 21 reports by contacting the I-405 Corridor Program Office, 425-456-8585.