﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - April</title>
    <link>http://wsdot.wa.gov/News/2012/04/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 23 May 2013 04:20:18 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - April</title>
      <url>http://wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://wsdot.wa.gov/News/2012/04/</link>
    </image>
    <item>
      <title>SR 99 tunnel construction brings big changes to Seattle’s downtown waterfront</title>
      <pubDate>Tue, 01 May 2012 06:02:46 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/30_waterfrontchanges.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/30_waterfrontchanges.htm</guid>
      <description>It’s not yet time for the downtown waterfront’s big makeover, but it is make-room time for the State Route 99 Tunnel project. Crews clearing space for tunnel construction are preparing to reroute six blocks of waterfront traffic from Alaskan Way to a newly improved road beneath the Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>WSDOT awards contract for I-5 congestion relief in Centralia</title>
      <pubDate>Tue, 01 May 2012 05:26:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/30_I-5MellenToBlakesleeAward.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/30_I-5MellenToBlakesleeAward.htm</guid>
      <description>CENTRALIA – Interstate 5 drivers are one step closer to faster, safer trips through north Lewis County.</description>
    </item>
    <item>
      <title>New electronic information signs go live on I-90 near Bellevue</title>
      <pubDate>Tue, 01 May 2012 04:59:31 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/30_NewI90ATMSigns.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/30_NewI90ATMSigns.htm</guid>
      <description>BELLEVUE – Interstate 90 drivers heading eastbound near Bellevue will have more real-time information available on Tuesday, May 1, when 36 new electronic highway signs go live in time for the morning commute.</description>
    </item>
    <item>
      <title>SR 520 reopened after weekend construction</title>
      <pubDate>Mon, 30 Apr 2012 18:26:55 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/30_SR520_ReopenedAfterWeekendConstruction.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/30_SR520_ReopenedAfterWeekendConstruction.htm</guid>
      <description>SEATTLE – Another batch of girders is in place over State Route 520 and the highway has reopened after a busy weekend of construction.</description>
    </item>
    <item>
      <title>Roundabout construction begins on SR 9 near Arlington</title>
      <pubDate>Sat, 28 Apr 2012 03:13:20 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/27_SR9SR531RoundaboutConstruction.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/27_SR9SR531RoundaboutConstruction.htm</guid>
      <description>Crews kick off construction next week on a new roundabout at the intersection of State Route 9 and SR 531 near Arlington.</description>
    </item>
    <item>
      <title>Aviation economic benefits soar in Washington</title>
      <pubDate>Fri, 27 Apr 2012 05:33:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/26_AviationEconomicBenefits.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/26_AviationEconomicBenefits.htm</guid>
      <description>Washington’s 135 public airports are continuing to help local economies take flight, generating thousands of jobs and millions of dollars for cities and counties throughout the state.</description>
    </item>
    <item>
      <title>Two more northbound lanes coming to Sumas border crossing</title>
      <pubDate>Fri, 27 Apr 2012 00:00:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/25_sr9twonewlanes.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/25_sr9twonewlanes.htm</guid>
      <description>Cross-border travelers will soon find shorter lines at the State Route 9 border crossing in Sumas thanks to a little lane adjustment and some new striping.</description>
    </item>
    <item>
      <title>New drawspan rules keep SR 520 peak traffic flowing</title>
      <pubDate>Thu, 26 Apr 2012 06:37:51 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/25_NewSR520DrawspanOperations.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/25_NewSR520DrawspanOperations.htm</guid>
      <description>SEATTLE – Under new rules published today, the State Route 520 floating bridge drawspan will not open to boats from 6-9 a.m. or 4-7 p.m. on weekdays – a move that keeps peak commute traffic flowing between Seattle and the Eastside.</description>
    </item>
    <item>
      <title>SR 520 bridge, highway closing April 27-30 for construction</title>
      <pubDate>Wed, 25 Apr 2012 05:35:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/24_SR520_WeekendClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/24_SR520_WeekendClosure.htm</guid>
      <description>Cranes will hoist 42 huge concrete girders into position over State Route 520 this weekend, part of a project to build lidded overpasses and widen the highway to six laneson the Eastside. To do the latest round of work, crews will close the highway and floating bridge between Seattle and Bellevue at 11 p.m. Friday, April 27.</description>
    </item>
    <item>
      <title>Second new 144-car ferry in progress</title>
      <pubDate>Wed, 25 Apr 2012 04:03:03 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/144_042412.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/144_042412.htm</guid>
      <description>Second new 144-car ferry in progress</description>
    </item>
    <item>
      <title>Prepare for daytime closures of SR 522 in Monroe this week</title>
      <pubDate>Tue, 24 Apr 2012 00:30:10 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/23_SR522closures.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/23_SR522closures.htm</guid>
      <description>Drivers on State Route 522 near Monroe should plan for full closures of the highway Wednesday and Thursday morning. Crews widening SR 522 between the Snohomish River Bridge and US 2 are removing trees in preparation for rock blasting in May.</description>
    </item>
    <item>
      <title>Open house planned April 24 for roundabouts on SR 92</title>
      <pubDate>Fri, 20 Apr 2012 23:30:31 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/20_SR92RoundaboutMeeting.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/20_SR92RoundaboutMeeting.htm</guid>
      <description>WSDOT will host an open house from 5:30 to 7:30 p.m. Tuesday, April 24, to discuss roundabouts being built on SR 92 in Lake Stevens.</description>
    </item>
    <item>
      <title>Northbound I-5/Tacoma City Center exit changes</title>
      <pubDate>Fri, 20 Apr 2012 21:56:45 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/20_I-5+Exit+to+Tacoma+Changing.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/20_I-5+Exit+to+Tacoma+Changing.htm</guid>
      <description>TACOMA - The northbound I-5 exit to the Tacoma City Center will change for three months starting Saturday, April 28, 2012.</description>
    </item>
    <item>
      <title>Show your support for Washington’s road workers – Go Orange for Work Zone Safety</title>
      <pubDate>Thu, 19 Apr 2012 03:08:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/18_2012_workzone_safety.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/18_2012_workzone_safety.htm</guid>
      <description>OLYMPIA – It’s simple really: See orange, slow down.</description>
    </item>
    <item>
      <title>Emergency culvert replacement ahead of schedule in Winlock</title>
      <pubDate>Tue, 17 Apr 2012 23:23:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/17_SR505Repairs.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/17_SR505Repairs.htm</guid>
      <description>WINLOCK – Contractor crews installed a concrete box culvert beneath State Route 505 this weekend, shaving a week off the timeline for emergency repairs on the undermined highway in Winlock. The Washington State Department of Transportation plans to reopen SR 505 by Saturday, April 21.</description>
    </item>
    <item>
      <title>SR 99 tunnel tolling committee meets today</title>
      <pubDate>Tue, 17 Apr 2012 22:38:29 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/17_SR99-tolling-committee.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/17_SR99-tolling-committee.htm</guid>
      <description>The SR 99 Tunnel Project’s Advisory Committee on Tolling and Traffic Management meets today to discuss ways to minimize diversion from the SR 99 tunnel and to review potential toll scenarios that will be analyzed this year.</description>
    </item>
    <item>
      <title>Pugnetti Park reopens for public use</title>
      <pubDate>Sat, 14 Apr 2012 00:26:17 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/13_pugnettiparkreopens.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/13_pugnettiparkreopens.htm</guid>
      <description>A parcel of land at the corner of Pacific Avenue and South 21st Street in downtown Tacoma, known as Pugnetti Park, reopens for public use today, April 13.</description>
    </item>
    <item>
      <title>US 2 roundabout opens to traffic in Sultan</title>
      <pubDate>Fri, 13 Apr 2012 12:44:48 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/041212_US2_RiceRoadRoundabout.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/041212_US2_RiceRoadRoundabout.htm</guid>
      <description>New roundabout opens ahead of schedule on US 2 at Rice Road.</description>
    </item>
    <item>
      <title>It’s time: Studded tire deadline is April 16</title>
      <pubDate>Fri, 13 Apr 2012 05:13:01 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/12_studsoff2012.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/12_studsoff2012.htm</guid>
      <description>After extending the studded tire deadline to Monday, April 16, the Washington State Department of Transportation reminds drivers to remove their studded tires.</description>
    </item>
    <item>
      <title>Plan for full weekend closure of SR 529 in Marysville</title>
      <pubDate>Fri, 13 Apr 2012 01:00:07 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/12_SR529trafficshift.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/12_SR529trafficshift.htm</guid>
      <description>Commuters on State Route 529 should bid their farewells to the Ebey Slough Bridge when they cross it on Friday, before the 87-year-old bridge is retired from service and crews ready the adjacent new bridge to carry Monday morning traffic.</description>
    </item>
    <item>
      <title>Southbound Aurora Avenue North back to normal, Broad Street ramp to close for 60 days</title>
      <pubDate>Thu, 12 Apr 2012 22:47:25 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/12_BroadStreet.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/12_BroadStreet.htm</guid>
      <description>One lane opens, but the Broad Street exit ramp closes. That's what State Route 99 drivers can expect tonight, April 12, when crews reopen the far right lane of southbound Aurora Avenue North between Republican and John streets. The lane has been closed since early March for utility relocation related to the SR 99 tunnel project.</description>
    </item>
    <item>
      <title>West-half repairs mean nighttime closures for Hood Canal Bridge in May</title>
      <pubDate>Thu, 12 Apr 2012 03:27:23 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/11-SR104HoodCanalBridgeWestHalfRepairs.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/11-SR104HoodCanalBridgeWestHalfRepairs.htm</guid>
      <description>West-half repairs mean nighttime closures for Hood Canal Bridge in May</description>
    </item>
    <item>
      <title>Emergency culvert replacement moves forward on SR 505 in Winlock</title>
      <pubDate>Wed, 11 Apr 2012 05:43:25 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/10_CulvertReplacement.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/10_CulvertReplacement.htm</guid>
      <description>WINLOCK – A brand-new box culvert will replace the crumbling, century-old concrete pipe that opened a sinkhole in the middle of State Route 505 two weeks ago.</description>
    </item>
    <item>
      <title>SR 520 design open house in Seattle April 12</title>
      <pubDate>Wed, 11 Apr 2012 02:17:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/10_SR520_SeattleDesignOpenHouse.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/10_SR520_SeattleDesignOpenHouse.htm</guid>
      <description>SEATTLE – The Washington State Department of Transportation is leading public discussions to refine designs for the future six-lane State Route 520 corridor in the Seattle area. WSDOT staff will share updated design options at an interactive open house from 4:30 to 7:30 p.m. Thursday, April 12, at the Museum of History &amp; Industry, 2700 24th Ave. E., Seattle.</description>
    </item>
    <item>
      <title>WSDOT begins new toll enforcement program</title>
      <pubDate>Tue, 10 Apr 2012 23:05:53 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/10_WSDOTbeginsnewtollenforcementprogram.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/10_WSDOTbeginsnewtollenforcementprogram.htm</guid>
      <description>WSDOT begins new toll enforcement program</description>
    </item>
    <item>
      <title>New roundabouts, local road improvements coming to Ridgefield Junction</title>
      <pubDate>Tue, 10 Apr 2012 01:20:20 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/09_NewRoundaboutsRidgefieldJunction.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/09_NewRoundaboutsRidgefieldJunction.htm</guid>
      <description>RIDGEFIELD – Construction begins this spring on two roundabouts flanking Interstate 5 near its junction with State Route 501, three miles east of Ridgefield.</description>
    </item>
    <item>
      <title>WSDOT recruits new aviation capital improvement project planner</title>
      <pubDate>Mon, 09 Apr 2012 23:29:37 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/09_NewAviationCapitalImprovProjPlanner.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/09_NewAviationCapitalImprovProjPlanner.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Emergency repairs begin on damaged culvert beneath SR 505 in Winlock</title>
      <pubDate>Fri, 06 Apr 2012 22:22:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/06_WinlockRepairsBegin.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/06_WinlockRepairsBegin.htm</guid>
      <description>WINLOCK – Emergency work begins, Friday, April 6, to repair a damaged culvert undermining State Route 505 in Winlock.</description>
    </item>
    <item>
      <title>SR 520 bridge construction brings changes on Lake Washington</title>
      <pubDate>Fri, 06 Apr 2012 04:19:04 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/05_SR520_Construction_Drawspan.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/05_SR520_Construction_Drawspan.htm</guid>
      <description>SEATTLE – Construction crews are removing trees in Medina and prepping to install anchors in Lake Washington for a new State Route 520 floating bridge. With more work in the water, drivers on SR 520 could see occasional intermittent closures of the highway for boat traffic.</description>
    </item>
    <item>
      <title>All US 2 traffic funneled into one lane next week in Sultan, Index</title>
      <pubDate>Fri, 06 Apr 2012 03:30:17 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/04_US2RiceAndersonConstruction.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/04_US2RiceAndersonConstruction.htm</guid>
      <description>Major construction is expected to cause traffic delays on US 2 starting Sunday evening, April 8. Drivers headed east or west between Sultan and Index should plan extra travel time once crews funnel all traffic on the two-lane highway into one lane.</description>
    </item>
    <item>
      <title>Aging vessels moving slower as they make their way toward retirement</title>
      <pubDate>Thu, 05 Apr 2012 04:33:13 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/aging_040412.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/aging_040412.htm</guid>
      <description>Aging vessels moving slower as they make their way toward retirement</description>
    </item>
    <item>
      <title>WSDOT and ODOT work toward goal of integrated passenger rail corridor between Eugene and B.C.</title>
      <pubDate>Thu, 05 Apr 2012 04:30:22 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/4_wa_or_integratedcorridor.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/4_wa_or_integratedcorridor.htm</guid>
      <description>Washington and Oregon are creating a new partnership and will develop a plan for managing passenger-rail service between Eugene, Ore., and Vancouver, B.C., as one continuous rail corridor rather than two separate state operations. Transportation officials for each state signed an agreement today as another step toward offering faster, more frequent Amtrak Cascades service.</description>
    </item>
    <item>
      <title>SR 99 Alaskan Way Viaduct to close this weekend, April 6-9</title>
      <pubDate>Wed, 04 Apr 2012 05:50:38 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/3_viaductweekend.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/3_viaductweekend.htm</guid>
      <description>Crews will close the State Route 99 Alaskan Way Viaduct this weekend to reinforce a two-block section of the structure located above the path of the future SR 99 tunnel.</description>
    </item>
    <item>
      <title>Ferry fares to increase in May</title>
      <pubDate>Wed, 04 Apr 2012 03:19:49 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/fares_040312.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/fares_040312.htm</guid>
      <description>Ferry fares to increase in May</description>
    </item>
    <item>
      <title>Construction resumes on I-90 east of Snoqualmie Pass</title>
      <pubDate>Tue, 03 Apr 2012 02:03:46 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2012/04/2_ConstructionresumesonI-90.htm</link>
      <guid>http://wsdot.wa.gov/News/2012/04/2_ConstructionresumesonI-90.htm</guid>
      <description>After a long winter break, construction is getting ready to resume on two major Interstate 90 projects east of Snoqualmie Pass. And that means drivers who cross the pass should prepare for construction related closures and delays.</description>
    </item>
  </channel>
</rss>