﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - July</title>
    <link>http://wsdot.wa.gov/News/2011/07/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Sun, 26 May 2013 07:52:10 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - July</title>
      <url>http://wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://wsdot.wa.gov/News/2011/07/</link>
    </image>
    <item>
      <title>Take the scenic route to avoid 2-hour delays on US 12 this summer</title>
      <pubDate>Tue, 30 Aug 2011 22:50:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</guid>
      <description>Rock blasting operations have been completed on US 12 near White Pass


The roadway is open in both directions</description>
    </item>
    <item>
      <title>WSDOT completes paving work on I-5 in downtown Vancouver</title>
      <pubDate>Sat, 20 Aug 2011 00:26:55 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/19_I-5_DowntownPavingComplete.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/19_I-5_DowntownPavingComplete.htm</guid>
      <description>VANCOUVER – Six weeks of work, 14,000 tons of fresh asphalt and two miles of new lane lines add up to a smoother and safer drive on Interstate 5 through downtown Vancouver.</description>
    </item>
    <item>
      <title>US 97A slope stabilization project open house scheduled in Entiat</title>
      <pubDate>Tue, 16 Aug 2011 05:51:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/15US97AEntiatOpenHouse.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/15US97AEntiatOpenHouse.htm</guid>
      <description>An August 24 Open House in Entiat will help US 97A South of Rocky Reach Slope Stabilization Project Team members find out which traffic control plan will work best.</description>
    </item>
    <item>
      <title>I-5 preservation work near Woodland begins Sunday night</title>
      <pubDate>Fri, 05 Aug 2011 03:06:17 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/04_I5WoodlandPavingStarts.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/04_I5WoodlandPavingStarts.htm</guid>
      <description>WOODLAND – Drivers in Cowlitz County will see orange construction barrels on Interstate 5 next week as work begins on a Washington State Department of Transportation (WSDOT) project to improve safety and preserve the heavily traveled freight corridor between Woodland and Kalama.</description>
    </item>
    <item>
      <title>Seattle’s floating bridges to close to traffic for Blue Angels, Seafair</title>
      <pubDate>Thu, 04 Aug 2011 00:02:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/03_I90ClosuresForBlueAngels.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/03_I90ClosuresForBlueAngels.htm</guid>
      <description>When the U.S. Navy Blue Angels jets begin zipping over Lake Washington this week, drivers won’t be cruising across the Interstate 90 floating bridge at the same time.</description>
    </item>
    <item>
      <title>Ribbon cutting unties traffic through Selah</title>
      <pubDate>Tue, 02 Aug 2011 03:40:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/SR823ribboncutting.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/SR823ribboncutting.htm</guid>
      <description>State Route 823 through Selah is rerouted and open for smoother traffic. Traffic engineers estimate the new route will reduce traffic congestion on First Street by one-third.</description>
    </item>
    <item>
      <title>WSDOT awards $1.1 million in first round of 2011-2013 Airport Aid grants</title>
      <pubDate>Tue, 02 Aug 2011 03:11:22 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/01_airportgrants.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/01_airportgrants.htm</guid>
      <description>ARLINGTON– Twenty-six Washington airports will receive a share of nearly $12 million in federal, state and local funds to maintain airport pavements, improve safety and enhance security. Of that amount the Washington State Department of Transportation (WSDOT) contributed $1.1 million through its Airport Aid Program, and used $433,290 in state funds to leverage more than $9 million in federal grants.</description>
    </item>
    <item>
      <title>Northbound I-5 reopens near Burlington</title>
      <pubDate>Fri, 29 Jul 2011 23:09:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/29_I5secnd87HourOver.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/29_I5secnd87HourOver.htm</guid>
      <description>During the 87-hour I-5 lane closure, WSDOT replaced two bridge approaches, repaired several bridge decks and reinforced 2.5 miles of aging concrete panels by tying them together with 6,000 steel dowel bars.</description>
    </item>
    <item>
      <title>Rail agreement expected to generate jobs and lead to improved Amtrak Cascades service</title>
      <pubDate>Fri, 29 Jul 2011 00:32:21 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</guid>
      <description>An agreement signed today by the Washington State Department of Transportation (WSDOT) and BNSF Railway clears the way for work to begin on rail improvements that ultimately will generate hundreds of jobs and improve Amtrak Cascades service between Seattle and Portland.</description>
    </item>
    <item>
      <title>Environment and transportation go hand-in-hand</title>
      <pubDate>Thu, 28 Jul 2011 23:10:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</guid>
      <description>It’s not always just about building roads and bridges. Often, transportation projects also help rebuild communities and improve the surrounding environment. The Washington State Department of Transportation (WSDOT) was recently recognized for its successes in sustainable transportation and environmental protection.</description>
    </item>
    <item>
      <title>Amtrak Cascades ‘Cash Train’ Scratch ticket partnership with Washington’s Lottery a success</title>
      <pubDate>Wed, 27 Jul 2011 06:43:19 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</guid>
      <description>Amtrak Cascades Cash Train Scratch ticket promotion with Lottery a success.</description>
    </item>
    <item>
      <title>New I-5 on-ramp at SR 432 opens July 27</title>
      <pubDate>Wed, 27 Jul 2011 04:36:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/26_I5_SR432_SBOnRampOpens.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/26_I5_SR432_SBOnRampOpens.htm</guid>
      <description>KELSO – After 18 months of closures, detours and delays, drivers will get to use the latest piece of the Longview Wye interchange overhaul tomorrow, July 27.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct closes for construction and Torchlight Run this weekend</title>
      <pubDate>Tue, 26 Jul 2011 04:47:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/25_SR99weekendclosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/25_SR99weekendclosures.htm</guid>
      <description>A full slate of weekend activities, including closures in both directions of the State Route 99 Alaskan Way Viaduct, could mean delays for drivers heading into downtown Seattle. The Washington State Department of Transportation (WSDOT) urges drivers to map out routes in advance, allow extra time and prepare for more congestion than usual</description>
    </item>
    <item>
      <title>I-5 reduced to one lane all week from Burlington to Bellingham</title>
      <pubDate>Fri, 22 Jul 2011 03:14:14 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/21_2ndI5Closure87Hour.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/21_2ndI5Closure87Hour.htm</guid>
      <description>Twelve miles of Interstate 5 will be reduced to one lane from Burlington to Bellingham for a week starting Monday, July 25. And it could take an hour or more to drive through the construction.</description>
    </item>
    <item>
      <title>Travelers choosing Amtrak Cascades in record numbers</title>
      <pubDate>Thu, 21 Jul 2011 03:24:13 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</guid>
      <description>Amtrak Cascades second quarter ridership for 2011.</description>
    </item>
    <item>
      <title>Provide feedback on SR 6 bridge projects at Pe Ell open house</title>
      <pubDate>Wed, 20 Jul 2011 05:13:04 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/19_SR6BridgeReplacementsOpenHouse.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/19_SR6BridgeReplacementsOpenHouse.htm</guid>
      <description>PE ELL – In 1924, many people traveled our nation’s highways and byways by horse and wagon or Model-T. It’s also the same year the Washington State Department of Transportation (WSDOT) built two bridges to carry SR 6 over Rock Creek, just west of Pe Ell.</description>
    </item>
    <item>
      <title>Transportation Commission proposes changes to ferry fares</title>
      <pubDate>Tue, 19 Jul 2011 23:29:15 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/TransCommission_071511.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/TransCommission_071511.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Toll vendor identifies new, minor glitch as it completes toll backlog on Tacoma Narrows Bridge</title>
      <pubDate>Tue, 19 Jul 2011 06:24:07 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/18_MinorTNBTollGlitch.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/18_MinorTNBTollGlitch.htm</guid>
      <description>Toll vendor Electronic Transaction Consultants Corp. (ETCC), the Texas firm now handling the Tacoma Narrows Bridge tolling, has nearly caught up on a backlog of toll transactions but encountered a new problem involving Good To Go! customers who manually replenish their accounts and often carry low balances. Some accounts in good standing were charged an incorrect rate.</description>
    </item>
    <item>
      <title>WSDOT's innovative management on I-5 wins award</title>
      <pubDate>Tue, 19 Jul 2011 04:22:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/18_WSDOTsInnovativeMngtonI5wins.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/18_WSDOTsInnovativeMngtonI5wins.htm</guid>
      <description>WSDOT’s innovative management on I-5 wins award</description>
    </item>
    <item>
      <title>Hitachi Zosen selected to build SR 99 tunnel boring machine</title>
      <pubDate>Tue, 19 Jul 2011 00:52:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/18_tbm-contractor.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/18_tbm-contractor.htm</guid>
      <description>Seattle Tunnel Partners, the Washington State Department of Transportation’s (WSDOT) design-build contractor for the proposed SR 99 bored tunnel, has selected Hitachi Zosen Corporation to supply the machine that will construct the tunnel. Hitachi Zosen will be responsible for designing, manufacturing, assembling, testing and commissioning the machine as well as training Seattle Tunnel Partners’ personnel.</description>
    </item>
    <item>
      <title>Four-month Manette Bridge closure starts next Sunday</title>
      <pubDate>Sat, 16 Jul 2011 04:41:03 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/15_303_ManetteClosingSoon.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/15_303_ManetteClosingSoon.htm</guid>
      <description>Manette Bridge closes July 24.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on Disadvantaged Business Enterprise contracting goals</title>
      <pubDate>Sat, 16 Jul 2011 04:37:42 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</guid>
      <description>Contractors, trade and labor organizations, small and disadvantaged businesses, and others who are interested in doing business with the Washington State Department of Transportation (WSDOT) are invited to comment on the agency’s proposed interim Disadvantaged Business Enterprise (DBE) goals.</description>
    </item>
    <item>
      <title>Dirt from SR 520 pontoon project benefits Hoquiam</title>
      <pubDate>Sat, 16 Jul 2011 04:15:09 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/SR520Dirt2Hoquiam.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/SR520Dirt2Hoquiam.htm</guid>
      <description>ABERDEEN – The Washington State Department of Transportation (WSDOT) and Kiewit-General (K-G) have the dirt on the city of Hoquiam. And Hoquiam couldn’t be happier about it.</description>
    </item>
    <item>
      <title>Traffic changes at Fauntleroy ferry terminal start Sunday, July 17</title>
      <pubDate>Sat, 16 Jul 2011 01:09:03 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/Fauntleroy_071511.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/Fauntleroy_071511.htm</guid>
      <description>Traffic changes at Fauntleroy ferry terminal start Sunday, July 17</description>
    </item>
    <item>
      <title>Washington selects AeroVironment to light up nation’s first electric highway</title>
      <pubDate>Wed, 13 Jul 2011 22:04:24 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</guid>
      <description>The Washington Department of Transportation (WSDOT) announces that within six months, drivers will have the ability to charge their electric cars (like the Nissan LEAF and Chevrolet Volt) at charge stations along Washington’s “electric highways” (I-5 and US 2).  Now it’s easy to plug in your electric car while you’re on the go in Washington!</description>
    </item>
    <item>
      <title>New roundabout in the works on Mount Baker Highway</title>
      <pubDate>Wed, 13 Jul 2011 01:23:47 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/12_sr542roundabout.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/12_sr542roundabout.htm</guid>
      <description>Construction began this week on a new roundabout that will soon make it easier and safer to turn on and off State Route 542, Mount Baker Highway, at the busy Smith Road intersection near Deming.</description>
    </item>
    <item>
      <title>SR 520 reopened after weekend of inspections, construction</title>
      <pubDate>Mon, 11 Jul 2011 19:06:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/11_SR520_Reopened.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/11_SR520_Reopened.htm</guid>
      <description>SEATTLE – Crews reopened State Route 520 this morning after successfully completing a busy weekend of inspections and repairs on the floating bridge in preparation for the next storm season.</description>
    </item>
    <item>
      <title>First pour complete in SR 520 pontoon casting basin</title>
      <pubDate>Sat, 09 Jul 2011 04:21:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</guid>
      <description>First pour complete in SR 520 pontoon casting basin</description>
    </item>
    <item>
      <title>Smooth sailing on SR 24 east of Yakima is just a few weeks away</title>
      <pubDate>Fri, 08 Jul 2011 22:48:11 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/smooth_sailing_on_SR24.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/smooth_sailing_on_SR24.htm</guid>
      <description>Smooth sailing on SR 24 east of Yakima is just a few weeks away</description>
    </item>
    <item>
      <title>Ten years in the making: final environmental impact statement completed for Alaskan Way Viaduct replacement</title>
      <pubDate>Fri, 08 Jul 2011 04:09:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/7_AWVfeis.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/7_AWVfeis.htm</guid>
      <description>The culmination of 10 years of technical analysis and public, agency and tribal review came to fruition today when the Federal Highway Administration (FHWA), Washington State Department of Transportation (WSDOT) and city of Seattle released the State Route 99 Alaskan Way Viaduct replacement project’s final environmental impact statement (EIS).</description>
    </item>
    <item>
      <title>Last round of I-5 closures in Lakewood this weekend</title>
      <pubDate>Fri, 08 Jul 2011 00:47:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/07_I5CloverCreeknorthbound+Closure.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/07_I5CloverCreeknorthbound+Closure.htm</guid>
      <description>Last round of I-5 closures in Lakewood this weekend
Drivers should plan for big delays during construction</description>
    </item>
    <item>
      <title>SR 3 hillside work rocks the commute near Bremerton</title>
      <pubDate>Thu, 07 Jul 2011 03:56:55 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/6_3_SlopeWorkBegins.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/6_3_SlopeWorkBegins.htm</guid>
      <description>Slope stablization work begins on SR 3 this summer.</description>
    </item>
    <item>
      <title>Possible travel delays July 9 and 10 for STP bike ride</title>
      <pubDate>Wed, 06 Jul 2011 02:51:47 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/05_SeattletoPortland_2011ride.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/05_SeattletoPortland_2011ride.htm</guid>
      <description>Drivers should leave themselves extra time July 9 and 10 as 10,000 cyclists use Washington’s state and local roads for the 2011 Group Health Seattle to Portland Bicycle Classic (STP).</description>
    </item>
    <item>
      <title>Plan ahead for construction, congestion this weekend in the Puget Sound area</title>
      <pubDate>Wed, 06 Jul 2011 02:07:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2011/07/05_SR520JulyWeekendClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2011/07/05_SR520JulyWeekendClosure.htm</guid>
      <description>SEATTLE – Expect region-wide congestion this weekend as workers close State Route 520 between Montlake Boulevard in Seattle and Interstate 405 in Bellevue. Crews plan to install a fish-passable culvert beneath all lanes of the highway and conduct annual maintenance of the floating bridge. Also, the city of Seattle will close the Interstate 5 ramps to and from Mercer Street.</description>
    </item>
  </channel>
</rss>