﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - August</title>
    <link>http://wsdot.wa.gov/News/2009/08/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Wed, 25 Nov 2009 01:56:16 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - August</title>
      <url>http://wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://wsdot.wa.gov/News/2009/08/</link>
    </image>
    <item>
      <title>Crews wrap up paving on SR 169 in Maple Valley</title>
      <pubDate>Tue, 01 Sep 2009 06:03:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/083109_169.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/083109_169.htm</guid>
      <description>rivers in Maple Valley are traveling on smoother pavement this week. Crews wrapped up work on Friday, August 28th between SR 169 between Witte Road and SE 264th Street. Crews working for WSDOT began work in May to repair 1.6 miles of deteriorated roadway and repave the highway with new asphalt.</description>
    </item>
    <item>
      <title>Two-boat service restored on Seattle/Bremerton route</title>
      <pubDate>Tue, 01 Sep 2009 05:07:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/Bremerton_083109.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/Bremerton_083109.htm</guid>
      <description>WSDOT Ferries Division supplements Bremerton one-boat service with passenger-only ferries</description>
    </item>
    <item>
      <title>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow</title>
      <pubDate>Tue, 01 Sep 2009 04:57:41 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</guid>
      <description>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow

More than 135 highway projects awarded or under way in Washington state.</description>
    </item>
    <item>
      <title>Crews reopen Renton’s I-405 carpool lane on schedule</title>
      <pubDate>Mon, 31 Aug 2009 21:30:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/31_I405HOVLaneReopened.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/31_I405HOVLaneReopened.htm</guid>
      <description>Crews in Renton and Tukwila reopened the carpool lane on southbound I-405 at 4:48 a.m. on, Aug. 31 on schedule.</description>
    </item>
    <item>
      <title>Wenatchee returns to service; two-boat service restored on Seattle/Bremerton route</title>
      <pubDate>Mon, 31 Aug 2009 06:18:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/30_BremertonOneBoat.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/30_BremertonOneBoat.htm</guid>
      <description>The Seattle/Bremerton ferry route has been reduced to one-boat service. Capacity on the Edmonds/Kingston route has been reduced by 58 vehicles.</description>
    </item>
    <item>
      <title>US 12 Black River Bridge goes green</title>
      <pubDate>Sat, 29 Aug 2009 01:28:24 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/US12_BlackRiverPainting.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/US12_BlackRiverPainting.htm</guid>
      <description>Bridge painting on US 12 requires a full week of alternating, one-way traffic control near the Grays Harbor/Thurston county border.</description>
    </item>
    <item>
      <title>First North Spokane Corridor segment opens to traffic</title>
      <pubDate>Sat, 29 Aug 2009 00:34:15 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</guid>
      <description>First US 395 North Spokane Corridor segment opens to traffic</description>
    </item>
    <item>
      <title>Watch for I-5, Mill Plain closures this weekend, Aug. 29-30</title>
      <pubDate>Fri, 28 Aug 2009 22:59:24 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/28_I-5SignInspectionClosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/28_I-5SignInspectionClosures.htm</guid>
      <description>VANCOUVER – Multiple lane and shoulder closures on northbound I-5 and Mill Plain Blvd. this weekend will allow crews to perform routine inspections on seven sign structures along the interstate in Clark County.</description>
    </item>
    <item>
      <title>Slope repairs on US 12 near White Pass begin Tuesday, Sept. 1</title>
      <pubDate>Fri, 28 Aug 2009 21:46:29 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/28_US12SlopeRepairsBeginSep1.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/28_US12SlopeRepairsBeginSep1.htm</guid>
      <description>WHITE PASS – Crews will repair a slope beneath US 12 near White Pass starting Tuesday, Sept. 1.</description>
    </item>
    <item>
      <title>Major lane closure this weekend, expect congestion on I-405 and SR 167</title>
      <pubDate>Fri, 28 Aug 2009 01:51:46 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/27_I-405RentonWeekendClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/27_I-405RentonWeekendClosure.htm</guid>
      <description>WSDOT is reaching out to drivers in preparation for a weekend full of sporting events and a major closure on southbound I-405 in Renton and Tukwila.</description>
    </item>
    <item>
      <title>New loop ramp opens Friday at I-5 / SR 531 interchange near Arlington</title>
      <pubDate>Thu, 27 Aug 2009 23:12:49 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/26_i5newloopramp.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/26_i5newloopramp.htm</guid>
      <description>Crews will open a new on-ramp to southbound Interstate 5 at the I-5/SR 531 (Smokey Point) interchange in Arlington at 5 a.m. Friday, Aug. 28, nearly six months ahead of schedule. The new ramp will help relieve heavy backups on SR 531 (172nd Street NE) during peak commute times.</description>
    </item>
    <item>
      <title>WSDOT gears up for a major I-405 lane closure and big backups this weekend</title>
      <pubDate>Wed, 26 Aug 2009 01:49:19 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/25_I-405RentonWeekendClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/25_I-405RentonWeekendClosure.htm</guid>
      <description>If you’re planning to take southbound I-405 through Renton to get to the Mariners or Sounders game this weekend or possibly the airport, prepare to use alternate routes or expect long delays.  Traffic will be funneled into two lanes as crews close the southbound I-405 carpool lane between SR 167 and the West Valley Highway to pave the I-405 bridge over Oakesdale Avenue SW in Renton.</description>
    </item>
    <item>
      <title>Crews to repave SR 525 in Clinton a second time</title>
      <pubDate>Wed, 26 Aug 2009 00:03:52 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/25_sr525repavinghighway.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/25_sr525repavinghighway.htm</guid>
      <description>Crews will return the first week of September to repave portions of State Route 525 in Clinton for a second time. The highway was first repaved in June, but the pavement failed to meet compaction standards and now has to be removed and replaced.</description>
    </item>
    <item>
      <title>Drivers should expect nighttime delays on SR 520 in Redmond</title>
      <pubDate>Tue, 25 Aug 2009 16:05:58 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/25_SR520Girders.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/25_SR520Girders.htm</guid>
      <description>Drivers should expect nighttime delays on SR 520 in Redmond</description>
    </item>
    <item>
      <title>WSDOT seeks proposals from three design-build contractors for SR 520 pontoon construction</title>
      <pubDate>Tue, 25 Aug 2009 05:44:42 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/24-520proposals.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/24-520proposals.htm</guid>
      <description>WSDOT is moving forward with a design-build contract to build pontoons to replace the aging SR 520 floating bridge. Three pre-qualified contractor teams were selected to submit proposals for this $300 million to $600 million contract that is expected to create approximately 2,000 project-related jobs at the height of construction in 2013.</description>
    </item>
    <item>
      <title>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</title>
      <pubDate>Tue, 25 Aug 2009 03:40:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</guid>
      <description>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</description>
    </item>
    <item>
      <title>WSDOT completes first SR 704 Cross Base Highway segment in Spanaway</title>
      <pubDate>Tue, 25 Aug 2009 02:25:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/24_704_Opens1stSection.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/24_704_Opens1stSection.htm</guid>
      <description>WSDOT is ready to open the first segment of the SR 704 Cross base highway in Spanaway.</description>
    </item>
    <item>
      <title>Crews wrap up repaving work on SR 520 between Bellevue and Redmond</title>
      <pubDate>Sat, 22 Aug 2009 04:42:58 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/21_08520complete.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/21_08520complete.htm</guid>
      <description>Early this morning, crews working for WSDOT laid the last few feet of permanent striping on newly-repaved lanes of SR 520 between Bellevue and Redmond. Crews have been working since March to repave nearly four miles of the freeway and replace bridge approaches on SR 520.</description>
    </item>
    <item>
      <title>WSDOT selects contractor to build $19.3 million congestion relief project on I-405 in Bothell</title>
      <pubDate>Sat, 22 Aug 2009 04:19:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/21_I405NewBothellLaneContractor.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/21_I405NewBothellLaneContractor.htm</guid>
      <description>BOTHELL – The Washington State Department of Transportation is moving forward to ease congestion and improve safety on I-405 by selecting Kiewit Pacific Co., of Renton to design and build a new northbound freeway lane in Bothell.</description>
    </item>
    <item>
      <title>WSDOT warns drivers of nighttime ramp closures on I-5 near Castle Rock</title>
      <pubDate>Sat, 22 Aug 2009 01:33:11 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/21_I-5NorthboundRampClosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/21_I-5NorthboundRampClosures.htm</guid>
      <description>CASTLE ROCK – Concrete panel replacement and paving work will close the on- and off-ramps at three locations on northbound I-5 next week near Castle Rock. WSDOT recommends drivers consider alternate routes during these closures, which will occur nightly between 10 p.m. and 6 a.m.</description>
    </item>
    <item>
      <title>Construction closures and first Seahawks game will test traveler’s planning skills this weekend</title>
      <pubDate>Sat, 22 Aug 2009 00:29:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/21_Aug21-23+weekend+travel+advisory.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/21_Aug21-23+weekend+travel+advisory.htm</guid>
      <description>If you’re planning on leaving the house this weekend, WSDOT wants you to be prepared so you can get to your destination on time. Several construction closures in and around Seattle, and a Saturday night Seahawks game could give you a traffic migraine if you don’t know before you go.</description>
    </item>
    <item>
      <title>Pavement repair on SR 507 and SR 510 means three days of delays for drivers</title>
      <pubDate>Fri, 21 Aug 2009 00:06:03 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/20_SR507_SR510Delays.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/20_SR507_SR510Delays.htm</guid>
      <description>Pavement repair on SR 507 and SR 510 means three days of delays for drivers</description>
    </item>
    <item>
      <title>Pedestrian tunnel construction slows traffic on SR 14</title>
      <pubDate>Thu, 20 Aug 2009 23:35:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/20_SR14TunnelSpeedReduction.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/20_SR14TunnelSpeedReduction.htm</guid>
      <description>WASHOUGAL – Drivers on SR 14 will encounter a temporary speed reduction from 55 mph to 25 mph in Washougal beginning Tuesday, August 25, as the City of Washougal continues construction on the stimulus-funded SR 14 Pedestrian Tunnel project.</description>
    </item>
    <item>
      <title>WSDOT awards stimulus contract to replace I-5 interchange in Ridgefield</title>
      <pubDate>Thu, 20 Aug 2009 23:29:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/20_SR501InterchangeContractAwarded.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/20_SR501InterchangeContractAwarded.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) this week awarded Tapani Underground, Inc. of Battle Ground a $15.79 million contract to build a new I-5, SR 501 Ridgefield interchange.</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge Project anchor connections complete</title>
      <pubDate>Thu, 20 Aug 2009 22:48:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/HCB+anchors+complete.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/HCB+anchors+complete.htm</guid>
      <description>SR 104 HCB anchors complete</description>
    </item>
    <item>
      <title>Glacier ski cabins sold for as little as $5 each at WSDOT auction</title>
      <pubDate>Thu, 20 Aug 2009 08:09:25 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/19_GlacierCabinAuction.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/19_GlacierCabinAuction.htm</guid>
      <description>It was an exciting morning near Glacier when WSDOT auctioned off 14 cabins, one storage shed, one manufactured home and one large lodge. Some cabins were multi-units. Only one storage shed did not receive a bid.</description>
    </item>
    <item>
      <title>I-5 reduced to one lane in Fife for HOV widening project</title>
      <pubDate>Wed, 19 Aug 2009 23:20:18 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/19_I5Fifelaneclosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/19_I5Fifelaneclosures.htm</guid>
      <description>Northbound I-5 in Fife reduced to one lane Saturday night.</description>
    </item>
    <item>
      <title>WSDOT thanks drivers for their patience during massive delays caused by weekend I-405 quieter pavement work</title>
      <pubDate>Tue, 18 Aug 2009 08:04:36 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/17_I-405QuieterPavementCompletion.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/17_I-405QuieterPavementCompletion.htm</guid>
      <description>The Washington State Department of Transportation today thanked motorists for their patience after contractors wrapped up a long weekend of highway construction on I-405 through Bellevue.</description>
    </item>
    <item>
      <title>The hottest housing deal in Western Washington is in Glacier on Wednesday – $10 for a ski cabin!</title>
      <pubDate>Mon, 17 Aug 2009 08:37:33 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/16_SR542Cabins.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/16_SR542Cabins.htm</guid>
      <description>The hottest housing deal in Western Washington is in Glacier on Wednesday – $10 for a ski cabin!</description>
    </item>
    <item>
      <title>WSDOT contractor crews make good progress on I-405 Bellevue paving</title>
      <pubDate>Sun, 16 Aug 2009 07:16:48 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/15_OneMoreDayI405.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/15_OneMoreDayI405.htm</guid>
      <description>WSDOT contractor crews are paving a test section of quieter asphalt on I-405 to determine if changes in the additives, application temperature and foundation material affect durability and noise reduction properties.</description>
    </item>
    <item>
      <title>Roundabout to open Sunday night at SR 539/Pole Road intersection near Lynden</title>
      <pubDate>Sat, 15 Aug 2009 02:39:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/14_539PoleRoundaboutOpensSunday.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/14_539PoleRoundaboutOpensSunday.htm</guid>
      <description>Crews will open the SR 539/Pole Road roundabout Sunday night, Aug. 16.</description>
    </item>
    <item>
      <title>WSDOT contractor crews close lanes on northbound I-405 in Bellevue this weekend to pave</title>
      <pubDate>Fri, 14 Aug 2009 06:54:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/13_08_405laneclosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/13_08_405laneclosures.htm</guid>
      <description>WSDOT contractor crews will close all but one lane on northbound I-405 in Bellevue this weekend to pave the highway between 112th Avenue SE and NE 6th Street. Only one northbound lane will be open between 5 a.m. Sat. Aug. 15 and 5 a.m. Monday, Aug. 17.</description>
    </item>
    <item>
      <title>WSDOT contractor crews to lay down quieter pavement test sections through Bellevue</title>
      <pubDate>Fri, 14 Aug 2009 01:41:17 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/13_I405QueterPavement.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/13_I405QueterPavement.htm</guid>
      <description>WSDOT’s study into the use of “quieter” pavement on Western Washington highways continues this weekend on northbound I-405 through Bellevue. Crews will funnel traffic down to one northbound lane to place quieter asphalt pavement test sections.</description>
    </item>
    <item>
      <title>WSDOT picks the Aberdeen Log Yard as its preferred site for SR 520 pontoon construction</title>
      <pubDate>Thu, 13 Aug 2009 05:41:28 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/8-Aberdeen.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/8-Aberdeen.htm</guid>
      <description>The Washington State Department of Transportation announced today that the Aberdeen Log Yard is the preferred location for a new construction facility to build SR 520 bridge pontoons.</description>
    </item>
    <item>
      <title>Second Amtrak Cascades train to Vancouver, B.C. begins service August 19</title>
      <pubDate>Thu, 13 Aug 2009 01:55:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</guid>
      <description>Second Amtrak Cascades train to Vancouver, B.C. 
begins service August 19</description>
    </item>
    <item>
      <title>Annual survey needs volunteers to count bicyclists and pedestrians</title>
      <pubDate>Wed, 12 Aug 2009 23:16:05 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</guid>
      <description>Annual survey needs volunteers throughout WA to count bicyclists and pedestrians</description>
    </item>
    <item>
      <title>WSDOT kicks off construction of the I-90 Snoqualmie Pass East project to improve safety and reliability of vital cross-state route</title>
      <pubDate>Wed, 12 Aug 2009 05:30:14 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</guid>
      <description>The Washington State Department of Transportation today began construction on the I-90 Snoqualmie Pass East project (I-90 Project), a project that will build five miles of wider, safer and more reliable highway for east-west travelers.</description>
    </item>
    <item>
      <title>August construction milestones on I-405 mean quicker commutes this fall</title>
      <pubDate>Wed, 12 Aug 2009 05:26:58 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/11_I405MilestoneAndClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/11_I405MilestoneAndClosure.htm</guid>
      <description>BELLEVUE – This weekend’s planned lane closure on northbound I-405 in south Bellevue is just another in a month of milestones for widening work that includes new lanes, new pavement and new striping.</description>
    </item>
    <item>
      <title>WSDOT adds new tools to deliver real-time traffic information</title>
      <pubDate>Tue, 11 Aug 2009 02:26:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</guid>
      <description>OLYMPIA – Now it is even easier to know before you go. The Washington State Department of Transportation has added new tools to deliver real-time traffic and incident information to Northwest motorists.</description>
    </item>
    <item>
      <title>WSDOT seeks bids for up to three more new ferries</title>
      <pubDate>Sat, 08 Aug 2009 06:26:45 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/7_wsdot-seeks-bids-for-ferries.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/7_wsdot-seeks-bids-for-ferries.htm</guid>
      <description>SEATTLE – The plan to improve Washington's ferry fleet takes another step forward with the advertisement today, Aug. 7, of a contract to build at least two new 64-car ferries.</description>
    </item>
    <item>
      <title>WSDOT wins national recognition for durable, long-lasting pavement</title>
      <pubDate>Fri, 07 Aug 2009 05:06:38 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/06_PavementAward.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/06_PavementAward.htm</guid>
      <description>To the motoring public, smoothness is chief among the factors of what makes a good roadway pavement. To the Washington State Department of Transportation (WSDOT), it is smooth pavement that lasts.</description>
    </item>
    <item>
      <title>WSDOT on fast-track to repair 84th Avenue bridge on SR 532 next week in Stanwood</title>
      <pubDate>Fri, 07 Aug 2009 02:39:09 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/6_SR532at84thRepairBegins.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/6_SR532at84thRepairBegins.htm</guid>
      <description>Drivers should plan for a weekend-long closure of SR 532 in both directions of SR 532 in Stanwood, August 14-17 for bridge deck repairs.</description>
    </item>
    <item>
      <title>WSDOT closes SR 122 for culvert installation Aug. 17-21</title>
      <pubDate>Thu, 06 Aug 2009 22:35:06 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/06_SR122ClosureCulvertInstallation.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/06_SR122ClosureCulvertInstallation.htm</guid>
      <description>MOSSYROCK – Beginning at noon on Monday, Aug. 17, the Washington State Department of Transportation (WSDOT) will close SR 122 between Flynn Road and Steelhead Drive (mile posts 4.55 to 5.92) for one week to install a culvert underneath the highway.</description>
    </item>
    <item>
      <title>Diamond debut: I-5 HOV lanes coming soon to Pierce County</title>
      <pubDate>Thu, 06 Aug 2009 04:02:28 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/05_I5HOVInPierceCounty.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/05_I5HOVInPierceCounty.htm</guid>
      <description>Bellevue-based Tri-State Construction, Inc. and WSDOT begin work next week on a project that builds the first I-5 HOV lanes in Pierce County.</description>
    </item>
    <item>
      <title>Stimulus-funded preservation project in Long Beach wraps up</title>
      <pubDate>Wed, 05 Aug 2009 00:27:23 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/04_US101SR103_ConstructionComplete.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/04_US101SR103_ConstructionComplete.htm</guid>
      <description>LONG BEACH – Drivers traveling US 101 near Chinook and SR 103 on the Long Beach peninsula now have a smoother and safer driving surface, new pavement markings and ADA enhancements in Long Beach thanks in part to the 2009 American Recovery and Reinvestment Act.</description>
    </item>
    <item>
      <title>WSDOT awards next major NSC construction contract</title>
      <pubDate>Tue, 04 Aug 2009 22:12:52 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/04_us395nscaward.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/04_us395nscaward.htm</guid>
      <description>WSDOT awards next major NSC construction contract</description>
    </item>
    <item>
      <title>Project means delays and speed-limit reduction on US 101</title>
      <pubDate>Tue, 04 Aug 2009 21:40:46 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/04_US101delaysandspeedreductions.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/04_US101delaysandspeedreductions.htm</guid>
      <description>Project means delays and speed-limit reduction on US 101</description>
    </item>
    <item>
      <title>WSDOT wraps up US 12, White Pass paver this week</title>
      <pubDate>Tue, 04 Aug 2009 04:31:12 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</guid>
      <description>WHITE PASS – Drivers on US 12 will enjoy a smoother, safer drive over White Pass as the Washington State Department of Transportation wraps up a paving project on Wednesday, Aug. 5.</description>
    </item>
    <item>
      <title>Lynnwood and WSDOT improve safety for pedestrians and bicyclists at I-5 and 196th Street SW</title>
      <pubDate>Mon, 03 Aug 2009 23:52:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2009/08/3_I5LynnwoodPedImprovement.htm</link>
      <guid>http://wsdot.wa.gov/News/2009/08/3_I5LynnwoodPedImprovement.htm</guid>
      <description>rews start work today on a stimulus-funded city of Lynnwood project to improve safety for pedestrians and bicyclists at the I-5/196th Street SW interchange in Lynnwood. Crews will build a new walkway on the 196th Street SW overpass and a pedestrian bridge over the existing southbound I-5 off-ramp. The 2009 American Recovery and Reinvestment Act (ARRA) provided $1.25 million toward the $5.65 million project, which will support an estimated 60 jobs.</description>
    </item>
  </channel>
</rss>