﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 10</title>
    <link>http://wsdot.wa.gov/News/2008/10/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Tue, 24 Nov 2009 16:54:10 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 10</title>
      <url>http://wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://wsdot.wa.gov/News/2008/10/</link>
    </image>
    <item>
      <title>WSDOT crews closing US 12  near Randle due to flooding</title>
      <pubDate>Thu, 13 Nov 2008 22:46:47 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/12_US12ClosesNearRandle.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/12_US12ClosesNearRandle.htm</guid>
      <description>RANDLE - WSDOT maintenance crews are in the process of closing both directions of US 12 near Randle in Lewis county (milepost 115) due to flooding. Rising water from nearby Davis Creek and Cowlitz River is flooding the roadway after steady rainfall Wednesday.</description>
    </item>
    <item>
      <title>48-car Rhododendron to return to Point Defiance/Tahlequah route starting Saturday, Nov. 1</title>
      <pubDate>Sat, 01 Nov 2008 04:56:19 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/103108_Rhododendronreturn.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/103108_Rhododendronreturn.htm</guid>
      <description>48-car Rhododendron to return to Point Defiance/Tahlequah route starting Saturday, Nov. 1</description>
    </item>
    <item>
      <title>WSDOT drilling crews begin testing soil on SR 520 corridor</title>
      <pubDate>Sat, 01 Nov 2008 04:08:41 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/31_SR520drilling.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/31_SR520drilling.htm</guid>
      <description>On Monday, Nov. 3, crews working for the Washington State Department of Transportation (WSDOT) will begin the second stage of a geotechnical drilling program to test soil conditions for the design of the new SR 520 corridor. There will be both daytime and nighttime drilling work depending on the location. Residents and travelers are likely to see drill rigs in the SR 520 corridor through March 2009.</description>
    </item>
    <item>
      <title>Drivers: Prepare yourself and your car for winter driving</title>
      <pubDate>Sat, 01 Nov 2008 03:32:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/31_winter_reminder.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/31_winter_reminder.htm</guid>
      <description>OLYMPIA – WSDOT starts its 24-hour winter reports at midnight and advises drivers to be ready for winter weather.</description>
    </item>
    <item>
      <title>WSDOT contractors finish replacing damaged I-405 culvert in Renton</title>
      <pubDate>Sat, 01 Nov 2008 03:16:23 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/31_I405ThunderHillsCulvert.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/31_I405ThunderHillsCulvert.htm</guid>
      <description>On Friday, Oct. 31 crews finished installing a new culvert to carry Thunder Hills Creek underneath Interstate 405 in Renton.</description>
    </item>
    <item>
      <title>I-5 Maytown Safety Rest area opening delayed until Dec. 12</title>
      <pubDate>Fri, 31 Oct 2008 23:44:02 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/31_maytown_delay.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/31_maytown_delay.htm</guid>
      <description>OLYMPIA - Limited services at the Maytown Safety Rest Area on southbound I-5 south of Olympia will remain through early December.</description>
    </item>
    <item>
      <title>End of Daylight Savings means dark days, greater risk of pedestrian fatalities</title>
      <pubDate>Fri, 31 Oct 2008 22:48:53 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/30_DaylightSavings.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/30_DaylightSavings.htm</guid>
      <description>As our daylight hours grow shorter, the Washington State Department of Transportation reminds motorists and pedestrians to pay extra attention to pedestrian safety. November 2 marks the end of Daylight Savings Time and begins the most difficult time of year for drivers to see walkers and bikers.</description>
    </item>
    <item>
      <title>WSDOT travel information and 5-1-1 service not available late Saturday</title>
      <pubDate>Fri, 31 Oct 2008 22:28:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/31_websiteoutage.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/31_websiteoutage.htm</guid>
      <description>WSDOT’s traffic information will be unavailable for four hours late Saturday.</description>
    </item>
    <item>
      <title>The Iron Goat Interpretive Site Closes for Winter November 3rd</title>
      <pubDate>Fri, 31 Oct 2008 04:56:07 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/30US2IronGoatCloses.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/30US2IronGoatCloses.htm</guid>
      <description>The US 2 Iron Goat Interpretive site and rest area, west of Stevens Pass, closes for the winter next Monday.</description>
    </item>
    <item>
      <title>SR 16 to I-5 ramp closures Saturday east of Nalley Valley viaduct</title>
      <pubDate>Thu, 30 Oct 2008 21:12:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/30_SR16toI5closure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/30_SR16toI5closure.htm</guid>
      <description>SR 16 to I-5 ramp closures Saturday east of Nalley Valley viaduct</description>
    </item>
    <item>
      <title>Utility work on SR 4 to slow traffic Friday and into next week</title>
      <pubDate>Thu, 30 Oct 2008 03:09:58 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/29_UtilityWorkonSR4.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/29_UtilityWorkonSR4.htm</guid>
      <description>SKAMOKAWA – Motorists traveling eastbound on SR 4 between the Naselle River and Skamokawa (mile posts 6 to 22) will encounter delays for four weekdays, beginning on Friday, October 31.</description>
    </item>
    <item>
      <title>WSDOT crews to close lanes on I-5 Ship Canal Bridge in Seattle tonight</title>
      <pubDate>Thu, 30 Oct 2008 01:29:01 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/29_ShipCanalBarrierWork.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/29_ShipCanalBarrierWork.htm</guid>
      <description>WSDOT maintenance crews will close one left lane in both directions of the Interstate 5 Ship Canal Bridge tonight, Wednesday, Oct. 29.</description>
    </item>
    <item>
      <title>Speed enforcement cameras out of Chehalis work zone</title>
      <pubDate>Wed, 29 Oct 2008 06:52:10 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/28_camera_out_Chehalis.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/28_camera_out_Chehalis.htm</guid>
      <description>CHEHALIS – Automated traffic safety cameras (ATSC) are no longer active in a Lewis County work zone.</description>
    </item>
    <item>
      <title>US 101 Simpson Avenue Bridge closes tomorrow</title>
      <pubDate>Wed, 29 Oct 2008 06:48:12 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/US101SimpsonClosesTomorrow.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/US101SimpsonClosesTomorrow.htm</guid>
      <description>US 101 Simpson Avenue Bridge closes tomorrow</description>
    </item>
    <item>
      <title>Weekend lane closures planned for SR 16 in Kitsap County</title>
      <pubDate>Wed, 29 Oct 2008 03:51:54 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/SR16BurleyOlallalaneclosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/SR16BurleyOlallalaneclosures.htm</guid>
      <description>Weekend lane closures planned for SR 16 in Kitsap County</description>
    </item>
    <item>
      <title>Travel Washington Apple Line provides needed bus service in North Central Washington</title>
      <pubDate>Wed, 29 Oct 2008 01:44:35 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/28US97AppleLine.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/28US97AppleLine.htm</guid>
      <description>A ribbon cutting ceremony in Omak celebrated bus service from Omak to Wenatchee and Ellensburg on Tuesday morning.</description>
    </item>
    <item>
      <title>SR 302 Corridor Study focus of open houses</title>
      <pubDate>Tue, 28 Oct 2008 01:40:38 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/27_SR302_openhouses.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/27_SR302_openhouses.htm</guid>
      <description>SR 302 corridor study open houses set for Oct. 27 and Oct. 29.</description>
    </item>
    <item>
      <title>Damaged I-5 overpass in Burlington gets money for replacement</title>
      <pubDate>Mon, 27 Oct 2008 23:24:36 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/27_i5bridgerepairsgetmoney.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/27_i5bridgerepairsgetmoney.htm</guid>
      <description>More than $1 million is now available to replace a damaged portion of the Chuckanut Drive (SR 11) overpass at the I-5 interchange in Burlington. During construction, I-5 will be closed at night and Chuckanut Drive may be closed for up to two months.</description>
    </item>
    <item>
      <title>WSDOT calls for Regional Mobility Grant project proposals to reduce delay and improve connectivity</title>
      <pubDate>Sat, 25 Oct 2008 06:54:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/24_RegionalMobilityGrant.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/24_RegionalMobilityGrant.htm</guid>
      <description>SEATTLE - WSDOT is now accepting Regional Mobility Grant project proposals from cities, counties, transit systems through December 18, 2008.</description>
    </item>
    <item>
      <title>90-car ferry Sealth to serve Anacortes-San Juan Islands route</title>
      <pubDate>Sat, 25 Oct 2008 05:47:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/24_SealthFerryRoute.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/24_SealthFerryRoute.htm</guid>
      <description>ANACORTES – The 90-car ferry Sealth is scheduled to begin service on the Anacortes/San Juan Islands route on Sunday, Oct. 26. This means a slight reduction in vehicle capacity for the route.</description>
    </item>
    <item>
      <title>No new settlement on the Alaskan Way Viaduct</title>
      <pubDate>Sat, 25 Oct 2008 00:48:37 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/24-awvsettlement.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/24-awvsettlement.htm</guid>
      <description>WSDOT bridge inspection crews reported that they found no new settlement or structural damage from last week's inspection of the Alaskan Way Viaduct. In April, WSDOT completed work to strengthen four column foundations between Columbia Street and Yesler Way that had settled approximately 5.5 inches since the 2001 Nisqually Earthquake.</description>
    </item>
    <item>
      <title>WSDOT completes emergency repair to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Fri, 24 Oct 2008 22:57:38 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/24_SR531EmergencyRepairComplete.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/24_SR531EmergencyRepairComplete.htm</guid>
      <description>Crews working for the Washington State Department of Transportation have reopened both lanes of SR 531 over Cougar Creek on Lakewood Road.</description>
    </item>
    <item>
      <title>Freight and local economy get a boost as SR 519 project kicks off near Seattle’s sports stadiums</title>
      <pubDate>Fri, 24 Oct 2008 07:04:36 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/23-sr519.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/23-sr519.htm</guid>
      <description>WSDOT broke ground Thursday on a $67 million project to improve traffic, freight mobility and pedestrian safety on SR 519 near the sports stadiums in Seattle’s SODO neighborhood. This project will help keep drivers moving as construction gets underway to replace the south end of the Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>Sign work, rumble strips cause lane closures on I-5 next week</title>
      <pubDate>Fri, 24 Oct 2008 07:01:06 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/23_I5SR502SignsandRumbleStrips.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/23_I5SR502SignsandRumbleStrips.htm</guid>
      <description>BATTLE GROUND – Final sign work and rumble strip installation will cause day time single lane closures and night time double lane closures on I-5 near the new SR 502 Interchange next week, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Weekend closure of westbound SR 522 in Bothell may cause delays on I-405</title>
      <pubDate>Fri, 24 Oct 2008 04:22:48 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/23_SR522westboundclosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/23_SR522westboundclosure.htm</guid>
      <description>All roads may lead to delays for drivers traveling on I-405 or SR 522 in Bothell this weekend.  Crews working for WSDOT contractor Mowat Construction will close all lanes of westbound SR 522 between I-405 and Kaysner Way from 11 p.m. Friday, Oct. 24 through 5 a.m. Monday, Oct. 27. During the closure, crews will connect the westbound lanes to a newly built and lower roadway.</description>
    </item>
    <item>
      <title>US 101 Simpson Avenue Bridge closes next week</title>
      <pubDate>Thu, 23 Oct 2008 04:46:13 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/US101SimpsonBridgeClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/US101SimpsonBridgeClosure.htm</guid>
      <description>US 101 Simpson Avenue Bridge closes next week</description>
    </item>
    <item>
      <title>Final Aurora Bridge Fence advisory committee meeting Tuesday in Seattle</title>
      <pubDate>Wed, 22 Oct 2008 05:54:49 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/17_SR99FinalAuroraMeeting.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/17_SR99FinalAuroraMeeting.htm</guid>
      <description>SEATTLE –The Aurora Bridge Fence Project advisory committee will meet for the sixth and last time on Tuesday, Oct. 21. 

The meeting will be held from 6 p.m. to 8 p.m. in Room 109 at Seattle Pacific University's Otto Miller Hall, located at 3469 Third Ave. W. in Seattle.</description>
    </item>
    <item>
      <title>Northbound ramp from I-5 to SR 502 will close for sign work Thursday and Friday</title>
      <pubDate>Wed, 22 Oct 2008 05:14:51 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/21_SR502SignWorkClosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/21_SR502SignWorkClosures.htm</guid>
      <description>BATTLE GROUND – The new interchange at I-5 and SR 502 is open to traffic, but WSDOT crews will need to temporarily close the off-ramp from northbound I-5 to the interchange and the adjacent Gee Creek Rest Area entrance to install overhead directional signs.</description>
    </item>
    <item>
      <title>Road sensor repairs on eastbound I-90, Cabin Creek, October 22</title>
      <pubDate>Wed, 22 Oct 2008 02:40:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/RoadSensorRepairsOn_Eastbound_I90.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/RoadSensorRepairsOn_Eastbound_I90.htm</guid>
      <description>WSDOT repairs road sensors on eastbound I-90, Cabin Creek, Oct. 22 

Drivers can expect to slow down through the work zone</description>
    </item>
    <item>
      <title>SR 108 in Mason County closes overnight Friday</title>
      <pubDate>Wed, 22 Oct 2008 01:15:42 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/21_108_Cls24Hrs.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/21_108_Cls24Hrs.htm</guid>
      <description>WSDOT and PSP Railroad are closing SR 108 for 24 hours this Friday.</description>
    </item>
    <item>
      <title>Road sensor repairs on US 12, SR 410 Oct. 21 near Naches</title>
      <pubDate>Tue, 21 Oct 2008 06:52:20 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/RoadSensorRepairsOnUS12_SR410.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/RoadSensorRepairsOnUS12_SR410.htm</guid>
      <description>WSDOT repairs road sensors on US 12 and SR 410 west of Naches, Oct. 21 

Drivers can expect delays of up to 15 minutes</description>
    </item>
    <item>
      <title>Vehicle knocks off section of guardrail at Seneca off-ramp</title>
      <pubDate>Tue, 21 Oct 2008 03:42:30 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/20_AWVGuardrailDamaged.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/20_AWVGuardrailDamaged.htm</guid>
      <description>A vehicle hit a 30-foot section of guardrail on the Seneca Street off-ramp from the Alaskan Way Viaduct today at 10:45 a.m.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Mon, 20 Oct 2008 23:14:49 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/20_AWVReopened.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/20_AWVReopened.htm</guid>
      <description>WSDOT maintenance crews re-opened both northbound and southbound lanes on the Alaskan Way Viaduct around 12:30 p.m., more than five hours ahead of schedule.</description>
    </item>
    <item>
      <title>Speed limit on I-5 to return to 70 MPH at SR 502 interchange</title>
      <pubDate>Sat, 18 Oct 2008 05:00:24 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/17_SR502SpeedLimitRevision.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/17_SR502SpeedLimitRevision.htm</guid>
      <description>BATTLE GROUND – Starting Monday, October 20, motorists traveling on I-5 in the vicinity of Battle Ground will notice the speed limit return to 70 MPH, after a reduction to 60 MPH through the SR 502 Interchange work zone.</description>
    </item>
    <item>
      <title>Crews begin emergency repair to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Sat, 18 Oct 2008 03:46:07 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/17_SR531Closure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/17_SR531Closure.htm</guid>
      <description>Washington State Department of Transportation crews will close SR 531 over Cougar Creek on Lakewood Road beginning Tuesday to make emergency repairs to a collapsed culvert.</description>
    </item>
    <item>
      <title>Lanes restricted on I-182 and SR 240 Oct. 20, 21 in Tri-Cities</title>
      <pubDate>Sat, 18 Oct 2008 03:35:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/LanesRestricted_on_I182andSR240.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/LanesRestricted_on_I182andSR240.htm</guid>
      <description>WSDOT restricts lanes on I-182 and SR 240 for sign inspections Oct. 20, 21 in the Tri-Cities 

Drivers should plan for delays and consider alternate routes.</description>
    </item>
    <item>
      <title>188-car ferry Walla Walla returns to service after necessary repairs</title>
      <pubDate>Sat, 18 Oct 2008 00:58:51 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/Wallawallareturn_101708.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/Wallawallareturn_101708.htm</guid>
      <description>188-car ferry Walla Walla returns to service after necessary repairs</description>
    </item>
    <item>
      <title>Bridge Inspection Work Causes Lane Closures in Cowlitz, Pacific and Wahkiakum Counties Next Week</title>
      <pubDate>Fri, 17 Oct 2008 06:48:23 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/16_CowPacWahkBridgeInspections.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/16_CowPacWahkBridgeInspections.htm</guid>
      <description>VANCOUVER – Motorists traveling through Cowlitz, Pacific and Wahkiakum counties early next week should expect single lane closures on I-5, SR 4, SR 6, SR 505 and US 101 as bridge maintenance crews conduct routine inspections on seven of the region’s bridges.</description>
    </item>
    <item>
      <title>Spanaway Loop Road at SR 7 closes again</title>
      <pubDate>Fri, 17 Oct 2008 06:04:32 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/SR7SpanawayLoopRoadclosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/SR7SpanawayLoopRoadclosure.htm</guid>
      <description>Spanaway Loop Road at SR 7 closes again</description>
    </item>
    <item>
      <title>Several I-405 lane closures this weekend in Renton</title>
      <pubDate>Fri, 17 Oct 2008 01:12:28 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/I405_WeekendClosures%29101608.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/I405_WeekendClosures%29101608.htm</guid>
      <description>Construction crews will close several lanes of Interstate 405 in Renton this weekend. During the closures, crews will retrofit the NE 44th Street overpass to meet current seismic standards and to better withstand earthquakes.</description>
    </item>
    <item>
      <title>US 2/97 Peshastin East Interchange Opens this Weekend</title>
      <pubDate>Thu, 16 Oct 2008 23:11:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/16US2_97PeshastinEIchgOpens.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/16US2_97PeshastinEIchgOpens.htm</guid>
      <description>Traffic will be using the new US 2/97 Peshastin East Interchange when the new ramps and overpass are opened in stages, this weekend.</description>
    </item>
    <item>
      <title>Report confirms WSDOT roads are key to freight economics</title>
      <pubDate>Thu, 16 Oct 2008 22:43:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/16_freighteconomicimpactreport.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/16_freighteconomicimpactreport.htm</guid>
      <description>WSDOT Releases Freight Transportation Economic Report on I-5 and I-90 Closures</description>
    </item>
    <item>
      <title>WSDOT and the community cut the ribbon on new SR 502 interchange</title>
      <pubDate>Thu, 16 Oct 2008 06:03:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/15_SR502InterchangeOpens.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/15_SR502InterchangeOpens.htm</guid>
      <description>At noon today, WSDOT, Kerr Contractors and the local community joined together to officially open the new SR 502 Interchange.</description>
    </item>
    <item>
      <title>Repairs coming next year for Battery Street Tunnel</title>
      <pubDate>Thu, 16 Oct 2008 06:00:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/15-Repairs.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/15-Repairs.htm</guid>
      <description>Repairs will begin next fall for the aging Battery Street Tunnel connecting the north end of the Alaskan Way Viaduct to Aurora Avenue N. As part of the Alaskan Way Viaduct and Seawall Replacement Program, this work will improve driver safety in the Battery Street Tunnel by installing a new fire alarm system, a new sprinkler system, tunnel closure signs and signals, new ventilation fan controls, and new lighting. Crews will also reinforce the roof beam connections and add an emergency exit stairw</description>
    </item>
    <item>
      <title>Trucks and cars should prepare now for winter driving; Big rigs need chains onboard by Nov. 1</title>
      <pubDate>Thu, 16 Oct 2008 05:59:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/15_winter_driving_prepare.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/15_winter_driving_prepare.htm</guid>
      <description>OLYMPIA – The Washington State Department of Transportation (WSDOT) and Washington State Patrol (WSP) advise drivers to plan now for winter driving.</description>
    </item>
    <item>
      <title>Crews complete work on SR 528 in Marysville</title>
      <pubDate>Thu, 16 Oct 2008 03:53:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/528_workcomplete.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/528_workcomplete.htm</guid>
      <description>Today, WSDOT and contractor Granite Northwest crews finished a $1.4 million project to repave half a mile of State Route 528 (4th Street) in Marysville and replace a water main beneath the roadway.</description>
    </item>
    <item>
      <title>Crews remove I-90 flammable cargo restriction</title>
      <pubDate>Thu, 16 Oct 2008 03:51:20 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/15_FlammableCargo.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/15_FlammableCargo.htm</guid>
      <description>WSDOT crews have lifted the flammable cargo restriction in both directions of Interstate 90 from the Mount Baker Tunnel through the Mercer Island Lid. The restriction began at 7 a.m. on Monday, Oct. 6.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for Thursday on I-5 through Lynnwood and south Everett</title>
      <pubDate>Thu, 16 Oct 2008 00:07:36 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/15_I-5LaneClosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/15_I-5LaneClosures.htm</guid>
      <description>Drivers can expect delays on Interstate 5 through Lynnwood and south Everett on Thursday night for roadwork.</description>
    </item>
    <item>
      <title>Lanes more visible on I-90 near Snoqualmie Pass</title>
      <pubDate>Wed, 15 Oct 2008 22:58:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/LanesMoreVisibleOn_I90.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/LanesMoreVisibleOn_I90.htm</guid>
      <description>WSDOT makes lane markers more visible on I-90 near Snoqualmie Pass</description>
    </item>
    <item>
      <title>Lanes more visible on I-90 near Snoqualmie Pass</title>
      <pubDate>Wed, 15 Oct 2008 22:46:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/Lanes_more_visible_0n_I90_Snoqualmie_Pass.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/Lanes_more_visible_0n_I90_Snoqualmie_Pass.htm</guid>
      <description>FOR IMMEDIATE RELEASE October 15, 2008 

WSDOT makes lane markers more visible on I-90 near Snoqualmie Pass</description>
    </item>
    <item>
      <title>WSDOT and city of Toppenish host open house for new safety project on SR 22 between I-82 and Toppenish</title>
      <pubDate>Wed, 15 Oct 2008 22:18:42 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/ToppenishOpenHouse101508.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/ToppenishOpenHouse101508.htm</guid>
      <description>and the city of Toppenish will be hosting an open house to share information regarding the SR 22 – I-82 Toppenish Safety Improvements project on Tuesday, Oct. 21 at the Toppenish Middle School.</description>
    </item>
    <item>
      <title>SR 520 floating bridge maintenance closures Wednesday and Thursday mornings</title>
      <pubDate>Wed, 15 Oct 2008 04:33:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/14_SR520MaintenanceClosures.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/14_SR520MaintenanceClosures.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct maintenance work on the SR 520 Evergreen Point floating bridge Wednesday and Thursday mornings.</description>
    </item>
    <item>
      <title>Daytime delays on the ramp from southbound I-405 to eastbound I-90 in Bellevue tomorrow</title>
      <pubDate>Tue, 14 Oct 2008 06:05:34 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/I405_closure_Oct14.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/I405_closure_Oct14.htm</guid>
      <description>Drivers can expect delays on the ramp from southbound I-405 to eastbound I-90 tomorrow while crews pour concrete for the deck of the new southbound I-405 bridge over I-90. Drivers should expect delays while crews use a pilot car to guide concrete trucks safely into and out of the work zone on the ramp from southbound I-405 to eastbound I-90 from 8 a.m. to 1 p.m.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct closed this weekend for semiannual inspections</title>
      <pubDate>Tue, 14 Oct 2008 05:45:10 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/13-Viaductclosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/13-Viaductclosure.htm</guid>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspection on Oct. 18 and 19 to ensure the structure remains safe for drivers. Crews will close both decks of the viaduct from 6 a.m. on Saturday, Oct. 18 to 6 p.m. on Sunday, Oct. 19. The viaduct will be closed between Spokane Street through the Battery Street Tunnel. The closure is extended overnight on Saturday to provide extra time for crews to repair damaged concrete roadway panels near Spokane Street.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-405 near Bothell</title>
      <pubDate>Tue, 14 Oct 2008 04:31:22 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/13_I405MaintenanceClosure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/13_I405MaintenanceClosure.htm</guid>
      <description>Drivers can expect delays on Interstate 405 near Bothell on Tuesday and Wednesday nights for maintenance of the freeway.</description>
    </item>
    <item>
      <title>Know before you go: WSDOT installs traffic cameras on north end of Vashon Island</title>
      <pubDate>Tue, 14 Oct 2008 03:54:04 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/Vashontrafficcamera_101308.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/Vashontrafficcamera_101308.htm</guid>
      <description>Know before you go: WSDOT installs traffic cameras on north end of Vashon Island</description>
    </item>
    <item>
      <title>Northbound I-5 an uphill climb this weekend</title>
      <pubDate>Sat, 11 Oct 2008 20:07:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/9_5_WkendWork.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/9_5_WkendWork.htm</guid>
      <description>Northbound I-5 work expected to cause delays this weekend.</description>
    </item>
    <item>
      <title>North Central Region Administrator Don Senn Retires</title>
      <pubDate>Sat, 11 Oct 2008 05:52:38 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10NCRAdministratorRetires.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10NCRAdministratorRetires.htm</guid>
      <description>After 42 years, North Central Region Administrator Don Senn is retiring</description>
    </item>
    <item>
      <title>Final repairs begin on unstable slope on SR 169 over Green River</title>
      <pubDate>Sat, 11 Oct 2008 04:19:16 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10_SR169GreenRiver.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10_SR169GreenRiver.htm</guid>
      <description>The second phase of repair work to stabilize a landslide near the SR 169 bridge over the Green River will begin on Monday, Oct. 13 when contractor Tri-State Construction shuts down one lane of the bridge as early as 6 a.m. to begin moving equipment onto the site.</description>
    </item>
    <item>
      <title>WSDOT prepares for emergency repairs to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Sat, 11 Oct 2008 04:05:27 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10_CulvertCollapse.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10_CulvertCollapse.htm</guid>
      <description>Drivers can expect short delays on SR 531 north of Smokey Point on Monday, Oct. 13, when WSDOT engineers begin boring exploratory holes into a collapsed culvert.</description>
    </item>
    <item>
      <title>Federal agency gives I-90 Snoqualmie Pass widening project green light for construction</title>
      <pubDate>Sat, 11 Oct 2008 01:48:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/I90ROD.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/I90ROD.htm</guid>
      <description>The Federal Highway Administration (FHWA) has signed an Environmental Impact Statement Record of Decision (ROD) giving the Washington State Department of Transportation’s (WSDOT) long-awaited I-90 Snoqualmie Pass East Project (I-90 Project) the green light to move forward with construction in the spring.</description>
    </item>
    <item>
      <title>WSDOT reminds campaigns of rules for posting signs</title>
      <pubDate>Sat, 11 Oct 2008 00:52:49 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10_PoliticalSignReminder.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10_PoliticalSignReminder.htm</guid>
      <description>OLYMPIA – As local and national elections heat up across the state and country, more and more political signs start appearing along Washington roadsides.</description>
    </item>
    <item>
      <title>Daytime delays on the ramp from southbound I-405 to eastbound I-90 in Bellevue today</title>
      <pubDate>Fri, 10 Oct 2008 22:22:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10_I90405Delays.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10_I90405Delays.htm</guid>
      <description>Drivers can expect delays on the ramp from southbound I-405 to eastbound I-90 on Friday, Oct. 10 while crews pour concrete for the deck of the new southbound I-405 bridge over I-90.</description>
    </item>
    <item>
      <title>Drivers face busy weekend on Puget Sound highways</title>
      <pubDate>Fri, 10 Oct 2008 21:01:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/10_BusyTravelWeekend.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/10_BusyTravelWeekend.htm</guid>
      <description>Drivers will want to prepare for possible delays and some big changes on area highways beginning today:</description>
    </item>
    <item>
      <title>WSDOT crews begin test drilling in Lake Washington for new SR 520 bridge</title>
      <pubDate>Fri, 10 Oct 2008 03:37:52 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/9-520testdrilling.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/9-520testdrilling.htm</guid>
      <description>On Monday, Oct. 13, crews working for the Washington State Department of Transportation (WSDOT) will begin a geotechnical drilling program to test soil conditions for the design of the new SR 520 corridor.</description>
    </item>
    <item>
      <title>New Bellevue-to-Mercer Island HOV lane opens on I-90 as partners complete first phase of expansions</title>
      <pubDate>Fri, 10 Oct 2008 02:33:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/9-newhovI90.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/9-newhovI90.htm</guid>
      <description>The first stage of a three-stage project to add new high-occupancy vehicle (HOV) lanes in both directions of Interstate 90 between Bellevue and Seattle is complete, with the new westbound HOV lane opening overnight and welcoming commuters Friday morning.</description>
    </item>
    <item>
      <title>Plan ahead for full closure of eastbound US 2 near Everett on Friday</title>
      <pubDate>Fri, 10 Oct 2008 01:00:58 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/9_US2TrestleRestripe.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/9_US2TrestleRestripe.htm</guid>
      <description>Weather permitting, crews will completely close eastbound US 2 between I-5 and SR 204 overnight on Friday, Oct. 10 while they restripe the eastbound trestle. During the closure, crews will remove more than two miles of striping and restripe the trestle to create two lanes of traffic and a wider, 14-foot right shoulder. Drivers should prepare for a long detour and add extra time for their trips.</description>
    </item>
    <item>
      <title>Redmond’s intersection construction will affect SR 520 this weekend</title>
      <pubDate>Fri, 10 Oct 2008 00:12:11 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/09_RedmondConstructionAffectsSR520.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/09_RedmondConstructionAffectsSR520.htm</guid>
      <description>Construction work at a major city of Redmond intersection will affect drivers on SR 520 this weekend.</description>
    </item>
    <item>
      <title>Overnight lane closure planned for I-5 in Marysville</title>
      <pubDate>Thu, 09 Oct 2008 05:28:23 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/08_NorthboundI-5Closure.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/08_NorthboundI-5Closure.htm</guid>
      <description>Drivers can expect travel disruptions on Interstate 5 near Marysville tonight as crews perform maintenance on the Union Slough Bridge</description>
    </item>
    <item>
      <title>WSDOT awards Westbound Nalley Valley contract</title>
      <pubDate>Thu, 09 Oct 2008 03:08:13 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/08_SR16WBNV_award.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/08_SR16WBNV_award.htm</guid>
      <description>WSDOT awards contract for Westbound Nalley Valley.</description>
    </item>
    <item>
      <title>Monthly maintenance closure of SR 520 floating bridge this Thursday</title>
      <pubDate>Thu, 09 Oct 2008 01:09:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/SR520_MonthlyMaintOpening100808.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/SR520_MonthlyMaintOpening100808.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Spanaway Loop Road at SR 7 closes next two weekends</title>
      <pubDate>Wed, 08 Oct 2008 23:07:43 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/SpanawayLoopRoadatSR7closes.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/SpanawayLoopRoadatSR7closes.htm</guid>
      <description>Spanaway Loop Road at SR 7 closes next two weekends</description>
    </item>
    <item>
      <title>Aberdeen’s ‘Hart’ of transportation retires</title>
      <pubDate>Wed, 08 Oct 2008 22:38:15 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/8_Hart_Retires.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/8_Hart_Retires.htm</guid>
      <description>Aberdeen PE retires after 50+ years of state service.</description>
    </item>
    <item>
      <title>New HOV lane opens on Westbound I-90 at Bellevue Way this Friday</title>
      <pubDate>Wed, 08 Oct 2008 05:16:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/7-NewHOV-I90.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/7-NewHOV-I90.htm</guid>
      <description>`Beginning Friday, Oct. 10, westbound I-90 carpoolers, vanpoolers and transit will be traveling in a new HOV lane between Bellevue and Mercer Island. With the new lane comes a number of changes for drivers.</description>
    </item>
    <item>
      <title>Expect delays on US 12 west of Naches Oct. 8 and 9</title>
      <pubDate>Tue, 07 Oct 2008 22:26:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/US12_Delays_October_8_9_Near_Naches.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/US12_Delays_October_8_9_Near_Naches.htm</guid>
      <description>TRAFFIC ADVISORY October 7, 2008 
WSDOT installs traffic recorders on US 12 west of Naches, Oct. 8-9 
Drivers can expect delays of up to 15 minutes</description>
    </item>
    <item>
      <title>Nugents Corner safety improvements featured at open house in Deming</title>
      <pubDate>Tue, 07 Oct 2008 01:46:32 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/06_539NugentsOpenHouse.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/06_539NugentsOpenHouse.htm</guid>
      <description>People interested in learning more about several safety projects planned for Mount Baker Highway (SR 542) are invited to attend an open house hosted by WSDOT on Thursday, Oct. 9.</description>
    </item>
    <item>
      <title>Crews will close road to Artist Point near Mount Baker at 5 p.m. Monday</title>
      <pubDate>Tue, 07 Oct 2008 00:45:57 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/06_542ArtistPointClosed.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/06_542ArtistPointClosed.htm</guid>
      <description>WSDOT crews will close the road to Artist Point (SR 542) for the season at 5 p.m. Monday, Oct. 6.</description>
    </item>
    <item>
      <title>Systems upgrade may cause Web site, traffic camera outage</title>
      <pubDate>Tue, 07 Oct 2008 00:43:45 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/06_InternetPageOutage.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/06_InternetPageOutage.htm</guid>
      <description>Internet users trying to use the Seattle area traffic page on the Washington Department of Transportation Web site may notice a disruption on Wednesday, Oct. 8.</description>
    </item>
    <item>
      <title>Walk to School Day October 8</title>
      <pubDate>Mon, 06 Oct 2008 23:22:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/WalktoSchoolDay.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/WalktoSchoolDay.htm</guid>
      <description>Washington State schools to celebrate International Walk to School Day on October 8.</description>
    </item>
    <item>
      <title>Asotin County Road Projects Win State and Federal Awards</title>
      <pubDate>Mon, 06 Oct 2008 23:08:55 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/AsotinCountyProjectsWinAwards.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/AsotinCountyProjectsWinAwards.htm</guid>
      <description>FOR IMMEDIATE RELEASE October 6, 2008 

Asotin County Safety Project Wins Federal and State Recognition</description>
    </item>
    <item>
      <title>WSDOT to review I-5 crash near Thurston/Lewis County line</title>
      <pubDate>Mon, 06 Oct 2008 22:15:26 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/03_CableCrossover.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/03_CableCrossover.htm</guid>
      <description>WSDOT to review I-5 crash near Thurston/Lewis County line</description>
    </item>
    <item>
      <title>WSDOT to open new lanes on SR 539 north of Bellingham</title>
      <pubDate>Sat, 04 Oct 2008 03:20:09 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/03_539SmithSignalLanes.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/03_539SmithSignalLanes.htm</guid>
      <description>After more than a year of construction, WSDOT will start to open nearly two miles of additional lanes on the Guide Meridian (SR 539) north of Bellingham.</description>
    </item>
    <item>
      <title>I-82 lane restrictions Oct. 6-9 near Selah</title>
      <pubDate>Sat, 04 Oct 2008 03:12:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/I82TrafficRestrictedForRecorderInstallation.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/I82TrafficRestrictedForRecorderInstallation.htm</guid>
      <description>WSDOT restricts I-82 traffic to install traffic recorders Oct. 6-9 near Selah</description>
    </item>
    <item>
      <title>Nighttime closure for Hood Canal Bridge scheduled Oct. 7</title>
      <pubDate>Sat, 04 Oct 2008 01:23:00 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/Nighttime+closure+for+Hood+Canal+Bridge+scheduled+Oct.+7.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/Nighttime+closure+for+Hood+Canal+Bridge+scheduled+Oct.+7.htm</guid>
      <description>HCB closes 90minutes</description>
    </item>
    <item>
      <title>Hood Canal Bridge 90-minute, nighttime closure scheduled Oct. 7</title>
      <pubDate>Sat, 04 Oct 2008 00:05:44 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/03_HoodCanalBridge.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/03_HoodCanalBridge.htm</guid>
      <description>The SR 104 Hood Canal Bridge will close for 90 minutes next week as WSDOT and contractor Kiewit-General continue ballasting measurements on the west half.</description>
    </item>
    <item>
      <title>I-90 flammable cargo restriction next week</title>
      <pubDate>Fri, 03 Oct 2008 22:07:43 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/03_I90FlammableRestriction.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/03_I90FlammableRestriction.htm</guid>
      <description>WSDOT will restrict flammable cargo in both directions of I-90 from the Mount Baker Tunnel through the Mercer Island Lid beginning at 7 a.m. on Monday, Oct. 6.</description>
    </item>
    <item>
      <title>WSDOT completes new I-5 interchange at SR 502 under budget, ahead of schedule</title>
      <pubDate>Fri, 03 Oct 2008 04:47:06 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/02_502RibbonCuttingFirstRelease.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/02_502RibbonCuttingFirstRelease.htm</guid>
      <description>BATTLE GROUND – Drivers in central and northern Clark County will have safer and more convenient access to I-5 when WSDOT opens a new freeway interchange at SR 502 later this month.</description>
    </item>
    <item>
      <title>Intersection construction on SR 520 in Redmond delayed</title>
      <pubDate>Fri, 03 Oct 2008 03:31:34 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/02_RedmondIntersectionDelayed.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/02_RedmondIntersectionDelayed.htm</guid>
      <description>City of Redmond crews have postponed weekend lane closures at the intersection of SR 520, Avondale and Union Hill roads due to unfavorable weather conditions.</description>
    </item>
    <item>
      <title>Weather puts kibosh on weekend work along I-5</title>
      <pubDate>Thu, 02 Oct 2008 23:29:04 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/02_weatherkiboshI_5.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/02_weatherkiboshI_5.htm</guid>
      <description>Weather puts kibosh on weekend work along I-5</description>
    </item>
    <item>
      <title>City of Shoreline chosen for award by WSDOT and FHWA</title>
      <pubDate>Thu, 02 Oct 2008 22:30:10 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/02_ShorelineAward.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/02_ShorelineAward.htm</guid>
      <description>City of Shoreline chosen for award by WSDOT and FHWA</description>
    </item>
    <item>
      <title>Emergency work on SR 542 near Mount Baker starts Monday</title>
      <pubDate>Thu, 02 Oct 2008 02:53:20 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/01_542RazorhoneEmergencyRepair.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/01_542RazorhoneEmergencyRepair.htm</guid>
      <description>Crews will start work Monday, Oct. 6, to repair a damaged retaining wall at the Razor Hone Creek bridge on Mount Baker Highway (SR 542) near the Mount Baker ski area.</description>
    </item>
    <item>
      <title>Closures planned this weekend along SR 16 and I-5</title>
      <pubDate>Thu, 02 Oct 2008 02:19:03 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/01_closuresonI_5_SR16.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/01_closuresonI_5_SR16.htm</guid>
      <description>Closures planned this weekend along SR 16 and I-5</description>
    </item>
    <item>
      <title>Cowlitz County Lexington Bridge Chosen for Award by WSDOT and FHWA</title>
      <pubDate>Thu, 02 Oct 2008 01:22:59 GMT</pubDate>
      <link>http://wsdot.wa.gov/News/2008/10/01_CowlitzAwardLexingtonBridge.htm</link>
      <guid>http://wsdot.wa.gov/News/2008/10/01_CowlitzAwardLexingtonBridge.htm</guid>
      <description>VANCOUVER – The Federal Highway Administration (FHWA) and Washington State Department of Transportation (WSDOT) awarded Cowlitz County with the 2008 Award of Excellence for “Best County Project” for the Lexington Bridge project connecting SR 411 to I-5 over the Cowlitz River.</description>
    </item>
  </channel>
</rss>