2013/2015 Safe Routes to School Project List

The purpose of the Safe Routes to School Program is to aid public agencies in funding cost-effective projects within two miles of primary and middle schools (K-8) that provide children a safe, healthy alternative to riding the bus or being driven to school. The program has two main goals, to increase the safety of the children walking and biking to school and where it is already safe to increase the numbers of children walking and biking to school. Applicants were asked to describe how their project would increase the number of students walking and biking to school safely by making improvements in areas of health and safety education, enforcement, and engineering. The Department of Transportation received 124 Safe Routes to Schools applications from 97 agencies and organizations totaling requests for approximately $60 million. The following are the locations and a prioritized list of projects that have been sent to the state legislature.


2013/2015 Safe Routes to School Additional Projects List (pdf 48 kb)

Funding

Agency

Leg District

Title of Project

Project Description

Total Project Cost

Amount Requested

Cumulative Total

Federal

Tukwila

11

Thorndyke Elementary Safe Routes to School Application

The project includes sidewalk, curb, gutter, drainage, widen road to 10 ft., walking school bus, educational materials, maps and events.

$1,082,000

$457,000

$457,000

Federal

Seattle

11, 36

Greenwood Neighborhood Greenways Go to School

The project includes curb extensions, rectangular rapid flashing beacons, educational materials and events, speed enforcement, speed feedback signs, and a speed control campaign.

$173,000

$153,000

$610,000

State

Mount Vernon

40

Bike Walk Mount Vernon 2013

The project includes bike lanes, a bike signal, a trail crossing improvement, a roundabout, and enforcement.

$419,500

$389,500

$999,500

State

Washington State Department of Health (Statewide)

N/A

State Student Travel Survey

The project conducts a statewide student travel survey to support state, regional and local project development and performance measurement.

$223,052

$173,052

$1,172,552

State

Woodland

18

South Woodland Safe Walking Route

The project includes sidewalk, curb, gutter, crossing improvements, crossing guards, and walking school bus program.

$340,525

$306,473

$1,479,025

Federal

Bellingham

40

Carl Cozier Safe Routes to School Program

The project includes sidewalk, curb, gutter, drainage, curb ramps, crosswalk markings and signage, curb extensions, flashing beacons, bicycle racks, educational materials and events, increased school zone crosswalk and speed emphasis patrols.

$263,700

$237,300

$1,716,325

State

Battle Ground

18

School Zone Safety Improvements, City Wide Battle Ground

The project includes crosswalk pavement markings, rear flashing beacon strobe lights, flashing beacon, guided walk groups and crossing guards, student/parent education, and speed emphasis patrols.

$70,706

$66,206

$1,782,531

Federal

Everett

38

Hawthorne Elementary Safe Routes to School

The project includes sidewalk, curb, gutter, crosswalk markings, curb ramps, flashing beacon, educational materials and events, and speed emphasis patrols.

$256,000

$256,000

$2,038,531

State

Puyallup

25

Meeker Elementary, Aylen Junior High and Stewart Elementary School Crosswalk Improvements

The project includes flashing beacons, street lights, curb ramps, educational materials and events, and speed emphasis patrols.

$210,000

$210,000

$2,248,531

State

Clark County

49

Sacajawea Elementary Pedestrian Safety

The project includes sidewalk, curb, gutter, crosswalk pavement markings, crossing guard safety equipment, walking school bus program, educational materials and events, speed feedback signs and emphasis patrols.

$302,000

$302,000

$2,550,531

State

Washington State Office of Superintendent of Public Instruction (Statewide)

N/A

Safe Routes to School Bicycle and Pedestrian Safety Education Program

The project conducts Bicycle and Pedestrian Safety Training for students across the state (to be conducted at schools determined by OSPI to have need).

$500,000

$500,000

$3,050,531

State

Swinomish Indian Tribal Community

10

Swinomish to La Conner Safe Routes Project

The project includes sidewalk, curb, gutter, bicycle lanes, signage, sharrow markings, crosswalk markings including stop bars, flashing beacons, bicycle and pedestrian safety education training, crossing guard training, speed feedback signs and emphasis patrols.

$779,610

$744,610

$3,795,141

Federal

Olympia

22

22nd Avenue Sidewalk Project

The project includes sidewalk, planter strip, education materials and events, walking school bus.

$1,899,300

$1,076,000

$4,871,141

Federal

University Place

28

44th Street Safe Routes to Schools Project

The project includes sidewalk, curb, gutter, bike lane, street lights, curb ramps, signage, educational materials and events, speed feedback signs and emphasis patrols.

$910,000

$820,000

$5,691,141

Federal

Federal Way

30

Federal Way Pedestrian Connection

The project includes sidewalk, curb, gutter, curb ramps, planter strips, sharrow markings, street lights, roundabout, and flashing beacons.

$775,000

$775,000

$6,466,141

Federal

Bellevue

48

West Lake Sammamish Parkway Sidewalk Connection

The project includes sidewalk, curb, gutter, planter strip, educational materials and events, walking school bus, and emphasis patrols.

$347,375

$260,000

$6,726,141

State

Quincy

12, 13

Quincy Valley K-7 Pathway

The project includes shared use path, bollards, enclose irrigation ditch, fencing, landscaping, bicycle racks, educational materials and events, walking school bus, adult crossing guard equipment, and emphasis patrols.

$342,000

$292,000

$7,018,141

Federal

Seattle

37

Beach Square Safe Routes to School

The project includes school speed zone signage, flashing beacons, crosswalk markings and stop bar, pedestrian refuge island, curb extensions, street lighting, pedestrian countdown signals, educational materials and events, and speed control campaign.

$258,000

$248,000

$7,266,141

Federal

University Place

28

Cirque Drive Safe Routes to Schools Project

The project includes sidewalk, curb, gutter, bike lane, planter strip, street lights, crosswalk markings, signalized crosswalks, curb ramps, educational materials and events, speed feedback signs and emphasis patrols.

$1,325,000

$1,040,000

$8,306,141

State

Sedro Woolley

39

SR9 Pedestrian/Bicycle Safety Improvements

The project includes sidewalk, curb, gutter, bike lane, stormwater improvements, educational materials and events, emphasis patrols.

$351,000

$300,000

$8,606,141

State

Port Townsend

24

Sheridan Street Sidewalk and Crossing Improvements

The project includes sidewalk, curb, gutter, curb extensions, planter strips, crosswalk markings, signage, educational materials and events, and emphasis patrols.

$561,681

$497,913

$9,104,054

State

Vancouver

49

Endeavour Elementary Pathway and Safety Improvement Program

The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols.

$227,654

$209,654

$9,313,708

State

Lake Forest Park

32

NE 178th Street Sidewalk Improvements

The project includes sidewalk, curb, gutter, curb ramps, removal of guardrail, curb extensions, crosswalk markings, flashing beacons, signage, bike lanes, bicycle racks, educational materials and events, and crossing guard equipment.

$1,018,000

$569,000

$9,882,708

Federal

University Place

28

56th Street Safe Routes to Schools Project

The project includes sidewalk, curb, gutter, street lights, curb ramps, crosswalk markings, signage, pedestrian refuge island, educational materials and events, speed feedback signs, and emphasis patrols.

$540,000

$464,000

$10,346,708

Federal

Seattle

46

Wedgwood Elementary Children and Neighbors

The project includes sidewalk, curb, gutter, planter strip, drainage, educational materials and events, speed feedback signs, and emphasis patrols.

$454,000

$439,000

$10,785,708

State

Shelton

35

Evergreen Elementary Safe Routes to School Program

The project includes sidewalk, curb, gutter, curb ramps, curb extensions, signage, educational materials and events, walking school bus, speed feedback signs, crossing guard equipment and emphasis patrols.

$509,596

$497,700

$11,283,408

State

Anacortes

40

Anacortes Safe Routes to Schools - Covered Bike Parking and Mid-Block Crossing

The project includes mid-block crossing, pavement markings, flashing beacons, curb extensions, curb ramps, covered bike parking, drainage, street lighting, educational materials and events, and emphasis patrols.

$221,000

$221,000

$11,504,408  

State

Shoreline

32

Einstein Safe Routes

The project includes sidewalks, curb, gutter, curb ramps, educational materials and events, and emphasis patrols.

$435,000

$435,000

$11,939,408  

State

Edmonds

21

15th St. SW from Edmonds Way (SR-104) to 8th Ave. S

The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.

$374,000

$374,000

$12,313,408  

Federal

Spokane

6

Westview Elementary School

The project includes, curb, gutter, planter strip, curb ramps, educational materials and events, and increased traffic patrols.

$610,435

$555,935

$12,869,343

Federal

Spokane

6

Hamblen Elementary School

The project includes sidewalk, curb, gutter, planter strips, curb ramps, educational materials and events, and emphasis patrols.

$646,732

$592,232

$13,461,575  

State

Edmonds

21

238th St. SW from 100th Ave. W to 104th Ave. W

The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.

$591,000

$591,000

$14,052,575