Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
131 results
SR 18, Issaquah Hobart Rd to Deep Creek Vicinity - Widening & Fiber
Publication date:
Contract number: XE3518
Submittal due:
The Project will widen SR 18 to a four-lane divided highway from just west of the Tiger Mountain Summit near MP 23.04 to Deep Creek at approximately MP 25.68. The project will also construct roundabouts at the SR 18/Issaquah-Hobart Road interchange ramp intersection and provide intelligent…
SR 542, Bagley Creek Bridge - Bridge Scour
Publication date:
Contract number: XE3552
Submittal due:
Repairing a scour hole at BR. No. 542/42 with concrete, moving existing streambed rocks to prevent future scour, roadside restoration, temporary erosion and water pollution control, temporary traffic control and other work. Involves 43 items and 49 working days. Work class 1.
Notice of bid opportunity - Radio-Frequency Identification (RFID) Tolling Technology
Publication date:
Submittal due:
The Washington State Department of Transportation (WSDOT) is issuing this Request for Quotes and Qualifications (RFQQ) to establish one or more contracts for the purpose of purchasing Radio Frequency Identification (RFID) transponders, transponder readers, ancillary equipment, and support services…
2024 WSDOT Consultant Prequalification
Publication date:
Submittal due:
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be prequalified to provide professional services for WSDOT.
Firms that complete the prequalification process will be eligible to compete for select WSDOT projects for the period…
Firms that complete the prequalification process will be eligible to compete for select WSDOT projects for the period…
I-5, 54th Ave to N of 20th St E - HMA Replacement and Paving
Publication date:
Contract number: XE3551
Submittal due:
Full depth reconstruction at the LX crossing, milling and filling with hot mix asphalt (HMA) on the NB on/off ramps, pavement repair, replacement of pavement markings, traffic control and other work. Involves 44 items and 15 working day. Work Class 4.
US 101, Chehalis River Bridge - Bridge Bearing Replacement
Publication date:
Contract number: XE3550
Submittal due:
Removing and replacing the rocker bearings at Piers 1S and 1N, providing traffic control and other work. Involves 14 items and 32 working days. Work class 6.
I-82, Columbia River Br at Umatilla EB - Bridge Painting Stg 1 & Repairs
Publication date:
Contract number: XE3548
Submittal due:
Requires the improvement of bridge 82/280S by cleaning and painting the existing metal girders, repairing the existing traveler support system and truss wind shoes and other work. Involves 43 items and 350 working days. Work class 8.
US 195, Cornwall Rd to Cheney-Spokane Rd NB Lanes Only Paving
Publication date:
Contract number: XE3547
Submittal due:
Requires planing bituminous pavement, pavement crack sealing, pavement repair, paving with hot mix asphalt (HMA), pavement markings, removing and resetting guardrail, erosion/water pollution control, traffic control, and other work. Involves 56 items and 45 working days. Work class 4.
US 2, Spokane Co Line to SR 211 Paving
Publication date:
Contract number: XE3546
Submittal due:
Requires crack sealing, planing bituminous pavement, HMA paving, erosion control, seeding, fertilizing, and mulching, guardrail, guideposts, pavement markings, rumble strips, signing, traffic control, surveying, other work. Involves 49 items and 30 working days. Work class 4.
I-5, SB I-205 to Ridgefield Interchange Replace Deteriorated Concrete
Publication date:
Contract number: XE3544
Submittal due:
Replace concrete panels, repair spalled panels and pavement repair, traffic control and other work. Involves 33 items and 35 working days. Work class 5.
US 395, Hatch Rd to Hamilton Rd Paving
Publication date:
Contract number: XE3545
Submittal due:
Requires planning bituminous pavement and hot mix asphalt (HMA) paving in the lanes, shoulders, approaches, and turn lanes, including the US 395/Hatch Road interchange ramps, shoulders and Hatch Road, and expansion joint rehabilitation of Bridge Nos. 395/458E and 395/458W, traffic control and other…
I-82, SR 14 Interchange Vicinity - Plymouth Weigh Station Improvements
Publication date:
Contract number: XE3543
Submittal due:
Requires demolition of the existing scale house and related existing infrastructure, including decommissioning existing septic system, construction and installation of a new scale house, inspection building and restroom unit with associated electrical, mechanical, water and sewage systems, as well…
Notice of bid opportunity - Traffic counting services
Publication date:
Submittal due:
The Washington State Department of Transportation is conducting a competitive solicitation to award a Contract to acquire contracted goods and/or services.
The Washington State Department of Transportation maintains a traffic monitoring program to meet internal needs and federal…
The Washington State Department of Transportation maintains a traffic monitoring program to meet internal needs and federal…
2024 WSDOT Space Use Study
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
SR 240, Richland Corridor Improvements
Publication date:
Contract number: XE3542
Submittal due:
Excavation of the existing roadway, preparing the subgrade for existing and new lanes, placing base course, paving hot mix asphalt (HMA), installing a noise wall along the south portion of SR 240 along the Moon River RV Resort, provide delineation, update traffic signals, pedestrian crossings,…
2024 Geotechnical Engineering & Project Delivery (Area 1)
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
SR 26 and I-90, Eastern Region 2024 Bridge Repair
Publication date:
Contract number: XE3537
Submittal due:
Constructing modified concrete overlay, scarifying concrete surface, type 2 deck repair, planning bituminous surface, removing existing overlay from bridge deck, HMA paving, surveying for concrete overlay, steel reinforcement bar for deck repair, pavement markings, shoulder rumble strips, erosion…
WSF, Maritime Security Infrastructure Preservation (Small Works Roster)
Publication date:
Contract number: XE3534
Submittal due:
Requires installation of State supplied cameras with camera mounts, and ethernet extenders, contractor supplied cabling, and other work. Involves 14 items and 104 working days. Work class 16.
SR 20, S Fork Mill Creek Rd to Tiger - Paving
Publication date:
Contract number: XE3535
Submittal due:
Planing bituminous pavement, paving with HMA, rumble strips, erosion control, guardrail, guide posts, pavement markings, traffic control, roadway surveying, traffic control and other work.
Involves 47 items and 33 working days. Work class 4.
Involves 47 items and 33 working days. Work class 4.
SR 7, Pacific Highway Crossing and Signalization
Publication date:
Contract number: XE3536
Submittal due:
Installing overhead pedestrian signals and illumination, trenching for conduit, adding traffic islands, delineation, signing, constructing sidewalks and curb ramps, traffic control and other work. Involves 71 items and 120 working days. Work class 9.
US 395, NSC 2024 Demo No 1
Publication date:
Contract number: XE3533
Submittal due:
Abatement of asbestos materials, removal and disposal of buildings and peripherals, contaminated soil removal, common borrow, crushed surfacing base course, asphalt paving, fencing, and other work. Involves 25 items and 50 working days. Work class 1 or 13.
I-5, Slater Road Interchange Roundabout
Publication date:
Contract number: XE3532
Submittal due:
Requires removal of the existing mini-roundabout, re-orientating ramps to connect closer to the bridge overpass, installing a new multi-lane roundabout, road excavation, planing, pigmented concrete installation, paving, curb installation, stormwater work, traffic control and other work. Involves…
SR 24 et al, SCR 2024 Region Wide Chip Seal and Rumble Strips
Publication date:
Contract number: XE3530
Submittal due:
Chip sealing, wheel path chip sealing, pavement repair, planing and paving, restoring delineation, installing new centerline and shoulder rumble strips, removing existing guardrail terminals and replacing with updated manual for assessing safety hardware (MASH) compliant terminals, traffic control…
2024 OR Region Wide Chip Seal
Publication date:
Contract number: XE3531
Submittal due:
Bituminous surface treatment, pavement repair, hot mix asphalt (HMA) for pre-leveling, installing centerline rumble strip, installing raised pavement markings, installing paint line and plastic pavement markings, traffic control and other work. 60 working days. Involves 31 items. Work class 3.
SR 503, NE Rock Creek Rd - Intersection Improvements
Publication date:
Contract number: XE3527
Submittal due:
Requires instillation of a compact roundabout at Rock Creek Rd, illumination, permanent signing, traffic control and other work. Involves 72 items and 50 working days. Work class 4 and 5.
SR 904, 2024 CW Branch Betz Rd Crossing - PCC
Publication date:
Contract number: XE3525
Submittal due:
Removing sidewalk, curb, gutter, pavement markings, ties, and roadway excavation, installing crushed surfacing base course, hot mix asphalt, curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ties, ballast distribution, surface line and dress,…
US 395, NSC Spokane River to Columbia Phase 2
Publication date:
Contract number: XE3523
Submittal due:
Requires constructing a sign bridge, paving ramps at Wellesley Avenue, paving the roundabout for northbound ramps at Freya St, and improvements to Market St. This work consists of removing drainage structures, sidewalk, and curb/gutter, roadway excavation, installing storm sewer items, paving,…
SR 6 and SR 508, Lewis County - Chip Seal
Publication date:
Contract number: XE3524
Submittal due:
Rehabilitating the existing roadway including pavement repair, HMA inlay, bituminous surface treatment, fog sealing, pavement markings, recessed pavement markers, traffic control and other work. Involves 58 items and 67 working days. Work class 3 or 4.
SR 23/SR 20, 2024 Eastern Region Chip Seal
Publication date:
Contract number: XE3519
Submittal due:
Involves shoulder finishing, bituminous surface treatment, planing bituminous pavement, crack sealing, hot mix asphalt (HMA) for pavement repair and pre-level, HMA paving, erosion control, centerline rumble strips, fog seal, guideposts, pavement markings, traffic control, and other work. Involves…
SR 25, 2 Miles N of Hunters Emergency Culvert Replacement
Publication date:
Contract number: XE3520
Submittal due:
Construction of roadway excavation, gravel borrow, embankment compaction, rock for erosion protection, HMA paving, erosion control, seeding, fertilizing, and mulching, installing guardrail, temporary barrier, centerline rumble strips, pavement markings, trenchless culvert, replacement, traffic…
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.